Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-Monitoring-Tools-20071106"

(4.5)
(4.5)
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
 
** Rohit Shetty
 
** Rohit Shetty
 
* Absent:
 
* Absent:
** Hariharan Narayanan ?
+
** Hariharan Narayanan - on vacation
  
 
== 4.4.1 ==
 
== 4.4.1 ==
Line 20: Line 20:
 
* still an outstanding test suite to run Monitor.UI.Common.Services
 
* still an outstanding test suite to run Monitor.UI.Common.Services
 
* some of the BTM test results were not checked into CVS yet
 
* some of the BTM test results were not checked into CVS yet
 +
* iteration numbers have shifted out by 2 to align with the Eclipse Ganymede milestone numbers
 +
** Alex has updated i2 and i3 targetted defects to i4 and i5
 
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207240 207240]
 
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207240 207240]
 
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208586 208586]
 
* work in progress on [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208586 208586]
Line 29: Line 31:
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207255 207255]
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207255 207255]
 
* new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139]
 
* new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139]
* after TP2 the focus should be on reducing the backlog of defects and feature work
 
 
* new defects have been opened, reported by a consuming product:
 
* new defects have been opened, reported by a consuming product:
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207763 207763]
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207763 207763]
Line 35: Line 36:
 
** could be potential 4.4.1 candidates
 
** could be potential 4.4.1 candidates
 
** consuming product will likely request a patch on TPTP4.2.2
 
** consuming product will likely request a patch on TPTP4.2.2
 +
* after TP2 the focus should be on reducing the backlog of defects and feature work
  
 
== Action items ==
 
== Action items ==

Latest revision as of 22:39, 7 November 2007

Attendees

  • Present:
    • Alex Nan
    • Yasuhisa Gotoh
    • Richard Yun Song Huang
    • Rohit Shetty
  • Absent:
    • Hariharan Narayanan - on vacation

4.4.1

4.5

  • 4.5 i3 TP1 finished
  • still an outstanding test suite to run Monitor.UI.Common.Services
  • some of the BTM test results were not checked into CVS yet
  • iteration numbers have shifted out by 2 to align with the Eclipse Ganymede milestone numbers
    • Alex has updated i2 and i3 targetted defects to i4 and i5
  • work in progress on 207240
  • work in progress on 208586
  • in TP2 we will run only a smoke test since no defects were fixed in TP1
  • in the remaining spare time to try finishing the test case automation work
  • new defects have been opened by Marius to track the work for the features 200138, 200139
  • new defects have been opened, reported by a consuming product:
    • 207763
    • 207806
    • could be potential 4.4.1 candidates
    • consuming product will likely request a patch on TPTP4.2.2
  • after TP2 the focus should be on reducing the backlog of defects and feature work

Action items

  • Richard to check in the remaining BTM test results
  • Rohit to fix 206260 as soon as possible
  • Alex to finish 206665 as soon as possible
  • Alex in collaboration with Joel and Samson to finish 208586
  • Alex to define the smoke test content (at the time these notes are written this is already done)
  • Alex (with Marius) to finish work on 207240
  • finish TP2 by Friday November 9, 2007 (worse case by Tuesday November 13, 2007)

Back to the top