Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-Monitoring-Tools-20071106"

(4.5)
(4.5)
Line 30: Line 30:
 
* new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139]
 
* new defects have been opened by Marius to track the work for the features [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200138 200138], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200139 200139]
 
* after TP2 the focus should be on reducing the backlog of defects and feature work
 
* after TP2 the focus should be on reducing the backlog of defects and feature work
 +
* new defects have been opened, reported by a consuming product:
 +
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=207763 207763]
 +
[https://bugs.eclipse.org/bugs/show_bug.cgi?id=207806 207806]
 +
** could be potential 4.4.1 candidates
 +
** consuming product will likely request a patch on TPTP4.2.2
  
 
== Action items ==
 
== Action items ==

Revision as of 22:27, 7 November 2007

Attendees

  • Present:
    • Alex Nan
    • Yasuhisa Gotoh
    • Richard Yun Song Huang
    • Rohit Shetty
  • Absent:
    • Hariharan Narayanan ?

4.4.1

4.5

  • 4.5 i3 TP1 finished
  • still an outstanding test suite to run Monitor.UI.Common.Services
  • some of the BTM test results were not checked into CVS yet
  • work in progress on 207240
  • work in progress on 208586
  • in TP2 we will run only a smoke test since no defects were fixed in TP1
  • in the remaining spare to try finishing the test case automation work
  • new defects have been opened by Marius to track the work for the features 200138, 200139
  • after TP2 the focus should be on reducing the backlog of defects and feature work
  • new defects have been opened, reported by a consuming product:

207806

    • could be potential 4.4.1 candidates
    • consuming product will likely request a patch on TPTP4.2.2

Action items

  • Richard to check in the remaining BTM test results
  • Rohit to fix 206260 as soon as possible
  • Alex to finish 206665 as soon as possible
  • Alex in collaboration with Joel and Samson to finish 208586
  • Alex to define the smoke test content (at the time these notes are written this is already done)
  • Alex (with Marius) to finish work on 207240
  • finish TP2 by Friday November 9, 2007 (worse case by Tuesday November 13, 2007)

Back to the top