Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Swordfish Documentation: Sprint Plan"

Line 31: Line 31:
  
  
<googlecalendar width="100%" height="300" mode="AGENDA" title="Swordfish development calendar">b54vre6eans3a64eputdcksfpg@group.calendar.google.com</googlecalendar>
+
<googlecalendar width="100%" height="500" mode="AGENDA" title="Swordfish development calendar">b54vre6eans3a64eputdcksfpg@group.calendar.google.com</googlecalendar>
  
  
 
----------------------------
 
----------------------------
 
[[Swordfish | Swordfish Wiki Home]]
 
[[Swordfish | Swordfish Wiki Home]]

Revision as of 15:19, 29 March 2009

{{#eclipseproject:rt.swordfish}}

Swordfish Sprints for Galileo

Swordfish Sprint Schedule

Update 27.03.2009: Merged sprints 4 and 5:

  • Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates
  • Mo. 06.04: Sprint 4 Planung
  • Tue. 07.04 until incl. Mi. 29.04: Sprint 4 development
  • Mo. 20.04: Checkpoint: All mandatory M7 requirements fulfilled?
  • Thu. 30.04: Sprint 4 Demo


Swordfish is developed using the scrum method. For the Galileo release the following sprints have been scheduled in synchronization with the Galileo Milestones for the Swordfish project. The Features and Tasks for Each sprint can be accessed through the links below:

sprint1: 09.02.2009 – 05.03.2009

sprint2: 06.03.2009 – 18.03.2009 (M6)

sprint3: 19.03.2009 – 02.04.2009

sprint4: 03.04.2009 – 16.04.2009

sprint5: 17.04.2009 – 06.05.2009 (M7)

sprint6: 07.05.2009 – 20.05.2009 (RC1)

Release: 21.05.2009 – 17.06.2009 (Endgame)




Swordfish Wiki Home

Back to the top