Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Reviews/Meetings"
(→Schedule) |
(→Schedule) |
||
Line 12: | Line 12: | ||
=== Schedule === | === Schedule === | ||
+ | |||
+ | {{ important | Meeting Details | | ||
+ | |||
+ | *'''Meeting Date''' has been decided based on your votes: we will meet from '''Jan 17.-21. 2011 at SAP Headquarters in Walldorf, Germany'''. | ||
+ | *Address: Robert-Bosch Strasse 34. 69190 Walldorf, Germany, [http://www.sap.com/germany/about/company/standorte/pdf/buildings-SAP-WDF.pdf Building 3] | ||
+ | *[http://tinyurl.com/3ybp6hw Route planning], [http://www.sap.com/germany/about/company/standorte/pdf/How-to-find-SAP_Headquarter.pdf How to find SAP] | ||
+ | *We have two rooms (8 and 9 seats) in Building 3 reserved for the whole week | ||
+ | *Some monitors and a beamer are available, guest network will be available. | ||
+ | *Phone numbers: Matthias Sohn : +49 160 908 20169 | ||
+ | More details will be published on Monday, Jan 10 | ||
+ | }} | ||
Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network, monitors and a beamer will be available. Details will be announced soon. | Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network, monitors and a beamer will be available. Details will be announced soon. | ||
We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011. So far the developers listed in the following table showed interest to participate, please mark the weeks you could participate so that we can reach a decision. Based on your votes in this table we will decide on Dec 18 in which week the meeting will take place | We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011. So far the developers listed in the following table showed interest to participate, please mark the weeks you could participate so that we can reach a decision. Based on your votes in this table we will decide on Dec 18 in which week the meeting will take place | ||
− | |||
− | |||
{| cellspacing="2" cellpadding="4" border="1" width="80%" | {| cellspacing="2" cellpadding="4" border="1" width="80%" |
Revision as of 21:48, 8 January 2011
Contents
Planned Face to Face Meeting Dec 2010/ Jan 2011
- Reviews Framework
- common components
- integration in-line commenting
- Presentation / Demo / Discussion of the current status for Task Based Reviews
- Presentation / Demo / Discussion of the current status for Gerrit connector
- Presentation / Demo / Discussion of the current status for Review for Eclipse (R4E)
- Egit/Jgit integration points
- Discuss on possible Egit / Jgit extension points
- UI Reviews
Schedule
Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network, monitors and a beamer will be available. Details will be announced soon.
We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011. So far the developers listed in the following table showed interest to participate, please mark the weeks you could participate so that we can reach a decision. Based on your votes in this table we will decide on Dec 18 in which week the meeting will take place
Mark the weeks you can participate with "+", the weeks you cannot participate with "-", also add topics you are interested in | ||||
Participant | Jan 10.-14. | Jan 17.-21. | Topics | Comments |
---|---|---|---|---|
Alvaro Sanchez (Ericsson Canada) | |
+ | Reviews framework, Reviews Reference Implementations, Gerrit Connector, Egit/Jgit extension points for Reviews | |
Benjamin Muskalla (Tasktop) | + | + | Mylyn/Egit integration, Gerrit connector | |
Chris Aniszczyk (Redhat) | - | + | |
|
Christian Halstrick (SAP) | + | + | |
|
Dariusz Luksza | - | + | Mylyn EGit integration, EGit sync-view performance and context menu operations | |
Edwin Kempin (SAP) | + | + | |
|
Jan Lohre (SAP) | - | + | |
|
Kilian Matt (INSO) | + | + | TBR, Versions | |
Manuel Doninger | + | + (except on 19.) | Mylyn integration, Gerrit | |
Mario Bernhart (INSO) | |
|
|
|
Matthias Sohn (SAP) | + | + | Gerrit Connector, EGit, EGit Mylyn integration | |
Sascha Scholz (SAP) | + | + | |
|
Steffen Pingel (Tasktop) | |
|
|
|
Simon Kaufmann (SAP) | - | + | |
|
Mathias Kinzler (SAP) | + | + |
Online Meeting Oct. 27, 2010
Tel (US/Canada): 1-877-748-5333 international +46 10 71 20000, Passcode: 7836 581#, Time: Wednesday's at 13:00hrs Eastern
Current list of available local and international telephone numbers
- SCM contribution from Stefan Reiterer
Online Meeting Oct. 20, 2010
- ESE2010 BoF
- Model Discussion
Online Meeting Oct. 13, 2010
- Model Discussion
Online Meeting Oct. 06, 2010
- Project restructuring status
- Committer nominations (Steffen Pingel, Ericsson (3), Stefan Reiterer)
- Status of the Atlassion Connector
- Gerrit connector CQ
- Model review and discussion
Vancouver Meeting Aug. 16-18, 2010
Introduction
- New Mylyn structure overview (Steffen)
- Mylyn Review structure overview/vision (Mario)
- Mylyn Review demo and feature walkthrough (Mario)
- R4E demo and feature walkthrough (Ericsson)
Technical Discussion
- SCM APIs
- Integration of reviews with the tasks framework
- Task Model API
- Task Editor API (319357, 288171, 322449)
- R4E migration strategy
Planning
- Gerrit connector code donation
- Project structure, release planning etc.
Other
- Project naming ("Review vs. Reviews")
TODOs
- Prepare ESE
- Contact Atlassian (Mario)
- Mylyn dependencies (Steffen)
- Split Framework and TBR (Mario + Kilian)
- Create unified model (Alvaro, Kilian)
- Appoint for Inline Commenting Feature (Marco)
- Set up Projects
- Set up R4E (Marco)
- SCM File Mylyn bug for initial contribution (Kilian)
- Set up Gerrit Connector Project (Mario Initial Proposal until Aug 22; Steffen contacts interested parties and finds project lead)
- File Gerrit Connector CQ (Kilian strips out dependencies; Mario CQ)
- Allign with the SCM project (Steffen)
- Followup Meeting (Mario)