Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Reviews/Meetings"

(Schedule)
(Schedule)
 
(9 intermediate revisions by 7 users not shown)
Line 11: Line 11:
 
*UI Reviews
 
*UI Reviews
  
=== Schedule ===
+
=== Schedule ===
  
Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network,
+
{{ important | Meeting Details |
monitors and a beamer will be available. Details will be announced soon.
+
  
We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011.
+
*'''Meeting Date''' has been decided based on your votes: we will meet from '''Jan 17.-21. 2011 at SAP Headquarters in Walldorf, Germany'''.
So far the developers listed in the following table showed interest to participate, please mark the weeks
+
*Address: Robert-Bosch Strasse 34. 69190 Walldorf, Germany, [http://www.sap.com/germany/about/company/standorte/pdf/buildings-SAP-WDF.pdf Building 3]
you could participate so that we can reach a decision. Based on your votes in this table
+
*[http://tinyurl.com/3ybp6hw Route planning], [http://www.sap.com/germany/about/company/standorte/pdf/How-to-find-SAP_Headquarter.pdf How to find SAP]
we will decide on Dec 18 in which week the meeting will take place
+
*External participants please register at the reception of building 3
 +
*We have two rooms G1.03 and G1.27 (8 and 9 seats) on the first floor of Building 3 reserved for the whole week
 +
*Some monitors and a beamer are available, WLAN guest network is available.
 +
*Phone numbers: Matthias Sohn : +49 160 908 20169
 +
}}
  
{| border="1" cellpadding="4" cellspacing="2" width="80%"
+
*Google Calendar with meeting schedule (participants have edit permissions):
 +
<googlecalendar width="60%" title="Schedule" timezone="+1">j8ecko3nq52mojhivvp9gg3d50%40group.calendar.google.com</googlecalendar>
 +
 
 +
Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network, monitors and a beamer will be available. Details will be announced soon.
 +
 
 +
We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011. So far the developers listed in the following table showed interest to participate, please mark the weeks you could participate so that we can reach a decision. Based on your votes in this table we will decide on Dec 18 in which week the meeting will take place
 +
 
 +
{| cellspacing="2" cellpadding="4" border="1" width="80%"
 +
|-
 +
| align="center" colspan="5" | '''Mark the weeks you can participate with "+", the weeks you cannot participate with "-", also add topics you are interested in'''
 
|-
 
|-
| colspan="5" align="center" | '''Mark the weeks you can participate with "+", the weeks you cannot participate with "-", also add topics you are interested in'''
+
! width="30%" | Participant
 +
! width="10%" | Jan 10.-14.
 +
! width="10%" | Jan 17.-21.
 +
! Topics
 +
! Comments
 
|-
 
|-
! width="30%" | Participant !! width="10%" | Jan 10.-14. !! width="10%" | Jan 17.-21. !! Topics !! Comments
+
| Alvaro Sanchez (Ericsson Canada)
 +
| <br>
 +
| +
 +
| Reviews framework, Reviews Reference Implementations, Gerrit Connector, Egit/Jgit extension points for Reviews
 +
| <br>
 
|-
 
|-
| Alvaro Sanchez (Ericsson Canada)
+
| Benjamin Muskalla (Tasktop)  
| || + || Reviews framework, Reviews Reference Implementations, Gerrit Connector, Egit/Jgit extension points for Reviews ||  
+
| +
 +
| +  
 +
| Mylyn/Egit integration, Gerrit connector
 +
| <br>
 
|-
 
|-
| Benjamin Muskalla (Tasktop)
+
| Chris Aniszczyk (Redhat)  
| + || + || Mylyn/Egit integration, Gerrit connector ||
+
| -
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Chris Aniszczyk (Redhat)
+
| Christian Halstrick (SAP)  
| - || + || ||
+
| +
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Christian Halstrick (SAP)
+
| Dariusz Luksza
| + || + || ||
+
| -
 +
| +  
 +
| Mylyn EGit integration, EGit sync-view performance and context menu operations
 +
| <br>
 
|-
 
|-
| Dariusz Luksza
+
| Edwin Kempin (SAP)
| - || + || Mylyn EGit integration, EGit sync-view performance and context menu operations ||
+
| +
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Edwin Kempin (SAP)
+
| Jan Lohre (SAP)  
| + || + || ||
+
| -
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Jan Lohre (SAP)
+
| Kilian Matt (INSO)  
| - || + || ||
+
| +
 +
| +  
 +
| TBR, Versions
 +
| <br>
 
|-
 
|-
| Kilian Matt (INSO)
+
| Manuel Doninger
| ||  ||  ||  
+
| +
 +
| + (except on 19.)  
 +
| Mylyn integration, Gerrit
 +
| <br>
 
|-
 
|-
| Manuel Doninger
+
| Mario Bernhart (INSO)  
| + || + (except on 19.) || Mylyn integration, Gerrit ||  
+
| <br>
 +
| <br>
 +
| <br>
 +
| <br>
 
|-
 
|-
| Mario Bernhart (INSO)
+
| Matthias Sohn (SAP)  
| || ||  ||  
+
| +
 +
| +
 +
| Gerrit Connector, EGit, EGit Mylyn integration
 +
| <br>
 
|-
 
|-
| Matthias Sohn (SAP)
+
| Sascha Scholz (SAP)  
| + || + || Gerrit Connector, EGit, EGit Mylyn integration  ||
+
| +  
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Sascha Scholz (SAP)
+
| Steffen Pingel (Tasktop)  
| + || + ||  ||  
+
| -
 +
| -
 +
| <br>
 +
| <br>
 
|-
 
|-
| Sebastien Dubois (Ericsson Canada)
+
| Simon Kaufmann (SAP)  
|   || + || Reviews framework, Reviews Reference Implementations, Gerrit Connector, Egit/Jgit extension points for Reviews ||
+
| -
 +
| +  
 +
| <br>
 +
| <br>
 
|-
 
|-
| Steffen Pingel (Tasktop)
+
| Mathias Kinzler (SAP)  
| || ||  ||  
+
| +
 +
| +
 +
|  
 +
|  
 
|-
 
|-
| Simon Kaufmann (SAP)
+
| Philipp Thun (SAP)
| + || + ||  ||  
+
| +
 +
| +
 +
|  
 +
|  
 
|}
 
|}
  

Latest revision as of 10:41, 14 January 2011

Planned Face to Face Meeting Dec 2010/ Jan 2011

  • Reviews Framework
    • common components
    • integration in-line commenting
  • Presentation / Demo / Discussion of the current status for Task Based Reviews
  • Presentation / Demo / Discussion of the current status for Gerrit connector
  • Presentation / Demo / Discussion of the current status for Review for Eclipse (R4E)
  • Egit/Jgit integration points
  • Discuss on possible Egit / Jgit extension points
  • UI Reviews

Schedule

Important.png
Meeting Details
  • Meeting Date has been decided based on your votes: we will meet from Jan 17.-21. 2011 at SAP Headquarters in Walldorf, Germany.
  • Address: Robert-Bosch Strasse 34. 69190 Walldorf, Germany, Building 3
  • Route planning, How to find SAP
  • External participants please register at the reception of building 3
  • We have two rooms G1.03 and G1.27 (8 and 9 seats) on the first floor of Building 3 reserved for the whole week
  • Some monitors and a beamer are available, WLAN guest network is available.
  • Phone numbers: Matthias Sohn : +49 160 908 20169


  • Google Calendar with meeting schedule (participants have edit permissions):

Proposed meeting location is at SAP in Walldorf, Germany. SAP will provide a room with guest network, monitors and a beamer will be available. Details will be announced soon.

We have to decide if we meet in the second (10.-14.) or third week (17.-21.) of Jan 2011. So far the developers listed in the following table showed interest to participate, please mark the weeks you could participate so that we can reach a decision. Based on your votes in this table we will decide on Dec 18 in which week the meeting will take place

Mark the weeks you can participate with "+", the weeks you cannot participate with "-", also add topics you are interested in
Participant Jan 10.-14. Jan 17.-21. Topics Comments
Alvaro Sanchez (Ericsson Canada)
+ Reviews framework, Reviews Reference Implementations, Gerrit Connector, Egit/Jgit extension points for Reviews
Benjamin Muskalla (Tasktop) + + Mylyn/Egit integration, Gerrit connector
Chris Aniszczyk (Redhat) - +

Christian Halstrick (SAP) + +

Dariusz Luksza - + Mylyn EGit integration, EGit sync-view performance and context menu operations
Edwin Kempin (SAP) + +

Jan Lohre (SAP) - +

Kilian Matt (INSO) + + TBR, Versions
Manuel Doninger + + (except on 19.) Mylyn integration, Gerrit
Mario Bernhart (INSO)



Matthias Sohn (SAP) + + Gerrit Connector, EGit, EGit Mylyn integration
Sascha Scholz (SAP) + +

Steffen Pingel (Tasktop) - -

Simon Kaufmann (SAP) - +

Mathias Kinzler (SAP) + +
Philipp Thun (SAP) + +

Online Meeting Oct. 27, 2010

Tel (US/Canada): 1-877-748-5333 international +46 10 71 20000, Passcode: 7836 581#, Time: Wednesday's at 13:00hrs Eastern
Current list of available local and international telephone numbers

Video Conference

  • SCM contribution from Stefan Reiterer

Online Meeting Oct. 20, 2010

  • ESE2010 BoF
  • Model Discussion

Online Meeting Oct. 13, 2010

  • Model Discussion

Online Meeting Oct. 06, 2010

  • Project restructuring status
  • Committer nominations (Steffen Pingel, Ericsson (3), Stefan Reiterer)
  • Status of the Atlassion Connector
  • Gerrit connector CQ
  • Model review and discussion

Vancouver Meeting Aug. 16-18, 2010

Introduction

  • New Mylyn structure overview (Steffen)
  • Mylyn Review structure overview/vision (Mario)
  • Mylyn Review demo and feature walkthrough (Mario)
  • R4E demo and feature walkthrough (Ericsson)

Technical Discussion

  • SCM APIs
  • Integration of reviews with the tasks framework
    • Task Model API
    • Task Editor API (319357, 288171, 322449)
  • R4E migration strategy

Planning

  • Gerrit connector code donation
  • Project structure, release planning etc.

Other

  • Project naming ("Review vs. Reviews")


TODOs

  • Prepare ESE
    • Contact Atlassian (Mario)
    • Mylyn dependencies (Steffen)
    • Split Framework and TBR (Mario + Kilian)
    • Create unified model (Alvaro, Kilian)
    • Appoint for Inline Commenting Feature (Marco)
  • Set up Projects
    • Set up R4E (Marco)
    • SCM File Mylyn bug for initial contribution (Kilian)
    • Set up Gerrit Connector Project (Mario Initial Proposal until Aug 22; Steffen contacts interested parties and finds project lead)
    • File Gerrit Connector CQ (Kilian strips out dependencies; Mario CQ)
    • Allign with the SCM project (Steffen)
  • Followup Meeting (Mario)

Gerrit Connector Proposal

Back to the top