Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Polarsys/Charter

< Polarsys
Revision as of 11:03, 3 January 2012 by Pierre.gaufillet.airbus.com (Talk | contribs) (Delinquency and non payment of dues)

WORK IN PROGRESS

Contents

Goals and Vision

The goal of the Polarsys group is to collaboratively define, build and maintain open source tools for safety-critical and embedded system development in demanding engineering domains, such as aerospace, defense and security, transportation, energy, healthcare, telecommunications.

These domains typically require maintenance of tool chains for the very long term – from 30 to up to 50 to 70 years in some cases – which create some very unique issues. Another characteristic of the working group is to address material for qualification processes – like in the DO 178 for Aircraft or ISO 26262 for Automotive.

Additionally, Polarsys intends to foster exchanges between academics and industrial partners in these domains and manage the maturity of tools from early research prototypes to the obsolescence of tools.

To implement this vision, the IWG group and the Eclipse Foundation will collaborate to provide services and to:

  • Maintain the infrastructure required for the hosting of IWG projects, including software repositories, software build and test facilities.
  • Proceed to IP due diligence in order to provide clean open source software released under EPL or other licenses validated by the IWG like BSD-like and LGPL.
  • Define the software tools to be contained in each release of the tool chains (with specific roadmaps and release trains).
  • Create a labelling process to recognize projects maturity and companies know-how and commitment .
  • Create a software quality assessment kit to define the maturity level of each component.
  • Digitally sign certified software releases made available under the IWG banner.
  • Make those binary software releases available only to the members of IWG.

Core domains

Polarsys focuses on techniques and tools to fulfill the Polarsys goal and vision, and mainly on:

  • System, Hardware and Software Modeling
  • Code analysis (static code analysis)
  • Debugging, tracing and other integration tools
  • Transversal process support tools : Configuration Management, Change tracking, Technical facts management, Project reporting
  • Test and verification tools targeting embedded software methods, simulation and early validation
  • Embedded components (RTOS, Middleware, ...)
  • System on Chip simulation and Hardware logic (VHDL, SystemC, ...)

Other domain specific techniques and tools can be proposed for acceptance by the IWG steering committee.

Membership

An entity must be at least a Solutions Member of the Eclipse Foundation and adhere to the IWG to participate to Polarsys. The Eclipse Solution Member fees appear in the tables below for convenience only: they are decided as described in the Eclipse bylaws and detailed in the Eclipse membership agreement.

Classes of membership

Strategic members

Strategic Members are organizations that view Polarsys as a strategic industrial working group and are investing resources to sustain its activities. Typical strategic members includes industrial users of the technologies & products supported by Polarsys.

Polarsys Strategic Member Fees
Turnover Eclipse Solution
Membership
Polarsys
Membership
Total
>$250 million $20.000 $30.000 $50.000
>$100 million <= $250 million $15.000 $30.000 $45.000
>$50 million <= $100 million $10.000 $30.000 $40.000
>$10 million <= $50 million $7.500 $20.000 $27.500
<$10 million $5.000 $20.000 $25.000

Solution members

Solutions Members are organizations that view Polarsys as an important part of their corporate and product strategy and offer products and services based on, or with, Polarsys. These organizations want to participate in the development of the Polarsys ecosystem. Typical Solution members includes services providers for the technologies & products supported by Polarsys.

Polarsys Solution Member Fees
Turnover Eclipse Solution
Membership
Polarsys
Membership
Total
>$250 million $20.000 $10.000 $30.000
>$100 million <= $250 million $15.000 $10.000 $25.000
>$50 million <= $100 million $10.000 $10.000 $20.000
>$10 million <= $50 million $7.500 $7.500 $15.000
<$10 million $5.000 $5.000 $10.000
<$1 million & < 10 employees $1.500 $1.500 $3.000

Guests

Guests are organizations or people who have been invited for one year by the steering committee of Polarsys to participate to some aspects of the activities of the Industrial Working Group. Typical guests includes R&D partners, academic entities and potential future full fledged members who want to have an inner look before deciding of their strategy. Even if guests can be invited to a Polarsys body for some meetings, they have no right to vote. Invitations may be renewed by the steering committee.

Committers

Committer Members are individuals who through a process of meritocracy are able to contribute and commit code to their Polarsys projects. Committers may be members by virtue of working for a member organization, or may choose to complete the membership process independantly if they are not. For further explanation and details, see the Eclipse Committer Membership page.

Polarsys Membership Summary

Polarsys Strategic Member Polarsys Solution Member Committer Guest
Member of the Steering Committee X Elected - Invited
Member of the Architecture Board X Elected - Invited
Quality & Labelling Committee X Elected - Invited
Member of the Change Control Board X X - Invited
Host custom build on IWG infra X - - -
Access to the LTS Build Infra X X - -
IWG test and certification program X X - -
Access to binary releases X X - -
Access to qualification kits X X - -
Legal review of non EPL projects X X - X
Labelling process X X - -

Membership qualification

TBD

Delinquency and non payment of dues

In the event that a Member does not pay its annual membership dues and all compounded late fees within ninety (90) days of the invoice due date (“Dues Delinquent”), the membership of such Member shall, without further action by the Steering Committee or the General Assembly, be terminated.

Termination of membership

TBD

Reinstatment after Termination

TBD

Assignment

TBD

Distribution of assets upon dissolution

TBD

Governance

Polarsys is designed as:

  • a user driven organization,
  • a means to foster a vibrant and sustainable ecosystem of components and service providers,
  • a means to organize the community of each project or component so that users and developers define the roadmap collaboratively.

In order to implement these principles, the following governance bodies have been defined:

  • The Steering Committee
  • The General Assembly
  • The Architecture Board
  • The Quality & Labelling Committee
  • Change Control Boards
  • Project Management Committees

Steering Committee

Powers & Duties

Steering committee members are required to:

  • Define the strategy of the IWG
  • Define the global roadmap
  • Discuss and update the charter
  • Vote fees amount each year
  • Define & Follow maketing and communication activities
  • Invite guest members

Composition

  • Each strategic member of the IWG has a seat on the Steering Committee.
  • At least one seat is allocated to Solutions Members. An additional seat on the Committee shall be allocated to the Solutions Members for every additional five (5) seats beyond one (1) allocated to Strategic Members. Solutions Member seats are allocated following the Eclipse "Single Transferable Vote", as defined in the Eclipse Bylaws.
  • The Steering Committee elects a chairman and a spokeperson who will represent the IWG each year.

Good Standing

TBD

Voting

TBD

Term and Dates of elections

TBD

Meetings Management

  • The Steering Committee meets twice a year.

+TBD

Resignation & Removal

TBD

Vacancies

TBD

General Assembly

Powers & Duties

TBD

Composition

TBD

Good Standing

TBD

Voting

TBD

Term and Dates of elections

TBD

Meetings Management

TBD

Resignation & Removal

TBD

Vacancies

TBD

Architecture Board

Powers & Duties

Architecture Board members are required to:

  • Ensure the technical consistency of Polarsys projects
  • Ensure that Polarsys projects achieve VLTS objectives
  • Recommand technologies
  • Establish technical guidelines
  • The Architecture Board validates new project proposals

Composition

  • Each strategic member of the IWG has a seat on the Architecture Board.
  • Each Change Control Board elects one of its members to the Architecture Board.
  • The Architecture Board elects a chairman who reports to the Steering Committee.

Good Standing

TBD

Voting

TBD

Term and Dates of elections

TBD

Meetings Management

  • The Architecture Board meets at least twice a year.

+TBD

Resignation & Removal

TBD

Vacancies

TBD

The Quality & Labelling Committee

Powers & Duties

The Quality & Labelling Committee members are required to:

  • Ensure the consistency of Labelling process and attribute maturity labels (see Labelling Charter Wiki Page)
  • Define the IWG quality kit and maturity process
  • Validate that the projects conform to the IWG quality kit
  • Validate that the projects apply the IP Process

Composition

  • Each strategic member of the IWG has a seat on the Quality & Labelling Committee.
  • At least one seat is allocated to Solutions Members. An additional seat on the Committee shall be allocated to the Solutions Members for every additional five (5) seats beyond one (1) allocated to Strategic Members. Solutions Member seats are allocated following the Eclipse "Single Transferable Vote", as defined in the Eclipse Bylaws.
  • The Quality & Labelling Committee elects a chairman who reports to the Steering Committee.

Good Standing

TBD

Voting

TBD

Term and Dates of elections

TBD

Meetings Management

  • The Quality & Labelling Committee meets at least twice a year.

+TBD

Resignation & Removal

TBD

Vacancies

TBD

Change Control Boards

Each component or release train (bundle) in the IWG are led by a Change Control Board.

Powers & Duties

Change Control Boards members are required to:

  • Instantiate IWG global roadmaps for the project
  • Apply the Architecture Board recommendations
  • Plan and arbitrate defects fixes and improvements implementation.
  • Ensure the relationships with the technical team of the project.

Composition

  • Each strategic member of the IWG has a seat on the Change Control Board.
  • Each Change Control Board elects one of its members to the Architecture Board.
  • The Change Control Board elects a chairman who represents the projects.

+TBD

Good Standing

TBD

Voting

TBD

Term and Dates of elections

TBD

Meetings Management

TBD

Resignation & Removal

TBD

Vacancies

TBD

Project Management Committees

TBD

Applicable documents

Back to the top