Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Papyrus/2018.12 Work Description"
< Papyrus
Line 1: | Line 1: | ||
+ | ''This page is a draft of the roadmap for the ongoing release of Papyrus for the 2018.09 simultaneous release, planned for september 2018. Please fill free to comment the listed tasks or to interact on the [https://dev.eclipse.org/mailman/listinfo/mdt-papyrus.dev Papyrus mailing list] if you have any feedback on the content of this page.'' | ||
+ | |||
+ | All the work realized by CEA LIST is sponsored by CEA LIST, Esterel, Airbus Defence and Space. | ||
+ | |||
+ | |||
+ | All bugs, or feature may be found in the tracker [https://projects.eclipse.org/projects/modeling.mdt.papyrus/releases/4.2.0/bugs] | ||
===User Experience=== | ===User Experience=== | ||
* Diagram: improve sequence diagram combined fragment + observation and general ordering | * Diagram: improve sequence diagram combined fragment + observation and general ordering | ||
* Toolsmith tool: improve Facet editor | * Toolsmith tool: improve Facet editor | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 04:26, 3 September 2018
This page is a draft of the roadmap for the ongoing release of Papyrus for the 2018.09 simultaneous release, planned for september 2018. Please fill free to comment the listed tasks or to interact on the Papyrus mailing list if you have any feedback on the content of this page.
All the work realized by CEA LIST is sponsored by CEA LIST, Esterel, Airbus Defence and Space.
All bugs, or feature may be found in the tracker [1]
User Experience
- Diagram: improve sequence diagram combined fragment + observation and general ordering
- Toolsmith tool: improve Facet editor