Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/September 2012"

< PTP‎ | meetings
(Agenda)
(Minutes)
 
(17 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
#Overall project, releases, etc.  
 
#Overall project, releases, etc.  
 
#*Next builds, releases  
 
#*Next builds, releases  
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18
+
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18  
 
#***see [[PTP/planning/6.0|Juno Planning page]]  
 
#***see [[PTP/planning/6.0|Juno Planning page]]  
#**Juno SR1 -Sept 28 GA
+
#**Juno SR1 -Sept 28 GA  
#**Kepler M2+3- Oc 10 - have we moved to +3 day?
+
#**Kepler M2+3- Oct 10 - have we moved to +3 day?  
 
#*Download stats  
 
#*Download stats  
#**43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11)
+
#**43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11)  
 
#**64,860 total Indigo SR2 (PTP 5.0.x)  
 
#**64,860 total Indigo SR2 (PTP 5.0.x)  
 
#Status Reports  
 
#Status Reports  
Line 30: Line 30:
 
#*Other PTP contributions  
 
#*Other PTP contributions  
 
#Education and Outreach  
 
#Education and Outreach  
#*User/Developer Meeting
+
#*User/Developer Meeting - Sept 18-20, Chicago
#*Tutorials
+
#**http://www.ncsa.illinois.edu/Conferences/Eclipse
#**SC12 Salt Lake City (Monday Nov 19, accepted);
+
#*Monthly PTP User call - Wed Sept 26 - see [[PTP/PTP_User_Meetings | PTP User Meetings]]
 +
#*Tutorials
 
#*BOFs  
 
#*BOFs  
#**SC12 BOF (accepted) - TUESDAY Nov. 13 12:15-1:15PM (Note move from original on Thursday)
 
 
#Other Business  
 
#Other Business  
 
#Next meeting - Tuesday October 9
 
#Next meeting - Tuesday October 9
  
 
== Attendees ==
 
== Attendees ==
 +
*Greg Watson, IBM
 
*Beth Tibbitts, IBM
 
*Beth Tibbitts, IBM
 +
*Carsten Karbach, Juelich 
 
*Wyatt Spear, U.Oregon
 
*Wyatt Spear, U.Oregon
*Jeff Overbey, NCSA
+
*Brian Watt, IBM
 +
*Dave Wootton, IBM
 
*Chris Navarro, NCSA
 
*Chris Navarro, NCSA
*Greg Watson, IBM
 
 
*John Eblen, ORNL
 
*John Eblen, ORNL
*David Alexander,  TechX
+
*Roland Schultz, ORNL/UTK
 +
 
 +
== Minutes  ==
 +
 
 +
#Overall project, releases, etc.
 +
#*Next builds, releases
 +
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18
 +
#** 9/6 build is ready now, no changes so far. Next week is RC4; SR1 GA is 9/28.  Announce PTP 6.0.2 next week? Prior to SR1, no need to wait.
 +
#** We could still use some more doc updates, esp. to new Res Mgrs since Juno, and retooled into launch config dialog.
 +
#** We will branch the repo after SR1.  ptp_6_0 branch and master will be for Kepler release.
 +
#*** To commit to both:
 +
#***# commit to ptp_6_0 branch
 +
#***# merge with master
 +
#*** To commit to ptp_6_0 only
 +
#***# commit to ptp_6_0 branch
 +
#***# merge with master
 +
#***# reverse the commit
 +
#*** To commit to master only
 +
#***# just commit to master
 +
#***Greg has been removing some legacy code, in private branch.  Will commit to master after ptp_6_0 branch.  Cleaning up and simplifying code will make it easier for people to understand the code base.  This reduces the size of the code base too.
 +
#**Kepler M2+3- Oct 10 - we moved to +3 build day.  M1 build was not successful since several pre-req projects didn't opt in to aggregation. M2 should be better.
 +
#*Download stats
 +
#**43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11 before the meeting.) 
 +
#**Compare with 64,860 total Indigo SR2 (PTP 5.0.x)
 +
#** See bottom of page for more details
 +
#Status Reports
 +
#*ETFw - Wyatt - making changes for UI in time for SC tutorial.  Kevin @U.Oregon reports that BG/Q display is ok; BG/P layout seems broken.  Oregon seems best group to look at this.
 +
#*Testing! Need folks to test Parallel package. Everyone try at least to submit a job with your favorite Res Mgr. Greg recently implemented some documented but unimplemented features in JAXB.
 +
#*Greg is working on RCP app for stand-along Monitor-only.  Will commit and discuss at next week's meeting.  Add to Agenda: Stand-alone RCP App for monitoring
 +
#*Chris Navarro - finishing up another project then 100% on PTP including ETFW+JAXB
 +
#*Sync Projects - John Eblen - Greg asked about when to use path vs. RegExp, requests file wildcard matching, one-way sync.  Bugs opened:
 +
#**[https://bugs.eclipse.org/bugs/show_bug.cgi?id=389304 389304 Simplify sync project filtering] and [https://bugs.eclipse.org/bugs/show_bug.cgi?id=389306 389306 Allow one-way sync projects]
 +
#** Brian W asked about editing RegExps in filters [https://bugs.eclipse.org/bugs/show_bug.cgi?id=389320 389320 Select Filter in Pattern View and display in Entry fields]
 +
#Education and Outreach
 +
#*User/Developer Meeting - Sept 18-20, Chicago
 +
#**http://www.ncsa.illinois.edu/Conferences/Eclipse  - presentations posted after the workshop are at [[PTP/workshops/September_2012 | PTP Chicago workshop Sept 2012]]
 +
#*Monthly PTP User call - Wed Sept 26 - see [[PTP/PTP_User_Meetings | PTP User Meetings]]
 +
#** Dave Alexander from Tech-X Corporation - They have a NASA SBIR (small business innovation research) grant to add several things to Photran, including a GUI for automated testing using pFUnit (a Fortran unit testing framework developed at NASA). He will demo the pFUnit Eclipse Integration.
 +
#*Tutorials
 +
#**SC12 Salt Lake City (Monday Nov 19, accepted) - http://sc12.supercomputing.org/schedule/event_detail.php?evid=tut160
 +
#*BOFs
 +
#**SC12 BOF (accepted) - TUESDAY Nov. 13 5:30-7:30 (Note move from original on Thursday... may move again, stay tuned)
 +
#* SC - National labs withdrawing booths due to travel restrictions.
 +
#Next meeting - Tuesday October 9
 +
 
  
== Minutes ==
 
 
  
 
=== Parallel Package Downloads  ===
 
=== Parallel Package Downloads  ===
Line 90: Line 134:
 
! Juno  
 
! Juno  
 
! September* 2012  
 
! September* 2012  
| 9038
+
| 14,770
| 37,055
+
| 43,389
 
|}
 
|}
  
 
<br>  
 
<br>  
  
September* downloads through September 7
+
September* downloads through September 11
  
<br>Juno by platform through July: Win32 2443; Win64 3218; Linux32 608; Linux64 2225; Mac32 136; Mac64 441 <br>&nbsp;&nbsp; Totals Windows 5661; Linux 2833; Mac 583  
+
<br>  
 
+
By platform - to Sept 11 (Juno)
<br>
+
<br>
 +
{| width="400" border="1" cellpadding="1" cellspacing="1"
 +
|-
 +
| '''Platforms'''
 +
| '''7/31 Totals'''
 +
| '''9/11 Totals'''
 +
|-
 +
| Win32+Win64  
 +
| 2443+3218=5661
 +
| 17210+19736=36,946
 +
|-
 +
| Linux32+Linux64  
 +
| 608+2225=2833
 +
| 1313+3806=5119
 +
|-
 +
| Mac32+Mac64  
 +
| 136+441=583
 +
| 409+974 =1383
 +
|}

Latest revision as of 14:12, 4 February 2013

September 2012 Meeting

Date: September 11, 2012 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18
      • Juno SR1 -Sept 28 GA
      • Kepler M2+3- Oct 10 - have we moved to +3 day?
    • Download stats
      • 43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11)
      • 64,860 total Indigo SR2 (PTP 5.0.x)
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
    • Synchronized Projects
    • Resource Managers / Target System Configurations - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations
    • Photran
    • Docs, Help, N&N
    • Other PTP contributions
  3. Education and Outreach
  4. Other Business
  5. Next meeting - Tuesday October 9

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Carsten Karbach, Juelich
  • Wyatt Spear, U.Oregon
  • Brian Watt, IBM
  • Dave Wootton, IBM
  • Chris Navarro, NCSA
  • John Eblen, ORNL
  • Roland Schultz, ORNL/UTK

Minutes

  1. Overall project, releases, etc.
    • Next builds, releases
      • 6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18
      • 9/6 build is ready now, no changes so far. Next week is RC4; SR1 GA is 9/28. Announce PTP 6.0.2 next week? Prior to SR1, no need to wait.
      • We could still use some more doc updates, esp. to new Res Mgrs since Juno, and retooled into launch config dialog.
      • We will branch the repo after SR1. ptp_6_0 branch and master will be for Kepler release.
        • To commit to both:
          1. commit to ptp_6_0 branch
          2. merge with master
        • To commit to ptp_6_0 only
          1. commit to ptp_6_0 branch
          2. merge with master
          3. reverse the commit
        • To commit to master only
          1. just commit to master
        • Greg has been removing some legacy code, in private branch. Will commit to master after ptp_6_0 branch. Cleaning up and simplifying code will make it easier for people to understand the code base. This reduces the size of the code base too.
      • Kepler M2+3- Oct 10 - we moved to +3 build day. M1 build was not successful since several pre-req projects didn't opt in to aggregation. M2 should be better.
    • Download stats
      • 43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11 before the meeting.)
      • Compare with 64,860 total Indigo SR2 (PTP 5.0.x)
      • See bottom of page for more details
  2. Status Reports
    • ETFw - Wyatt - making changes for UI in time for SC tutorial. Kevin @U.Oregon reports that BG/Q display is ok; BG/P layout seems broken. Oregon seems best group to look at this.
    • Testing! Need folks to test Parallel package. Everyone try at least to submit a job with your favorite Res Mgr. Greg recently implemented some documented but unimplemented features in JAXB.
    • Greg is working on RCP app for stand-along Monitor-only. Will commit and discuss at next week's meeting. Add to Agenda: Stand-alone RCP App for monitoring
    • Chris Navarro - finishing up another project then 100% on PTP including ETFW+JAXB
    • Sync Projects - John Eblen - Greg asked about when to use path vs. RegExp, requests file wildcard matching, one-way sync. Bugs opened:
  3. Education and Outreach
    • User/Developer Meeting - Sept 18-20, Chicago
    • Monthly PTP User call - Wed Sept 26 - see PTP User Meetings
      • Dave Alexander from Tech-X Corporation - They have a NASA SBIR (small business innovation research) grant to add several things to Photran, including a GUI for automated testing using pFUnit (a Fortran unit testing framework developed at NASA). He will demo the pFUnit Eclipse Integration.
    • Tutorials
    • BOFs
      • SC12 BOF (accepted) - TUESDAY Nov. 13 5:30-7:30 (Note move from original on Thursday... may move again, stay tuned)
    • SC - National labs withdrawing booths due to travel restrictions.
  4. Next meeting - Tuesday October 9


Parallel Package Downloads

Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. SR0,SR1,SR2) the counts are set to 0 and restarted.

Release Month Downloads Total Downloads
Indigo SR1 thru Feb 2012  40,298
Indigo SR2 thru June 2012 64,860
Juno (4 days!) June 2012 902

902

Juno July 2012 8169 9071
Juno August 2012 19,112 28,009
Juno September* 2012 14,770 43,389


September* downloads through September 11


By platform - to Sept 11 (Juno)

Platforms 7/31 Totals 9/11 Totals
Win32+Win64 2443+3218=5661 17210+19736=36,946
Linux32+Linux64 608+2225=2833 1313+3806=5119
Mac32+Mac64 136+441=583 409+974 =1383

Back to the top