Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/June 2011"

< PTP‎ | meetings
(Agenda)
(Agenda)
Line 18: Line 18:
 
#** 4.1 Branch
 
#** 4.1 Branch
 
#** 5.0 Indigo - official release is June 22
 
#** 5.0 Indigo - official release is June 22
 +
#*** RC4 is now available on our update site (really RC4a  I201106091223) - http://download.eclipse.org/tools/ptp/updates/indigo
 +
#**** This should be our 'final' Indigo 5.0.0 build
 +
#**** Outlook for near-term bug fixes e.g. 5.0.1 soon after Indigo release?
 +
#** Parallel Package of 5.0.0 on Indigo
 +
#*** RC4 parallel package (EPP build) is available on [http://www.eclipse.org/downloads/index-developer.php  Indigo package build page]
 +
#*** How to update parallel package from PTP update site
 +
#* Testing plans for coverages of features, platforms
 +
#** See [[PTP/testing/5.x#Test_Matrix]]
 +
#** How to track coverage (who tests what) vs. Results (have tests been run)
 +
#** Bug status/triage
 +
#* Download stats - how to track for 5.0.0 via portal, plus package downloads?
 +
#* Transition to Git
 +
# Status Reports
 +
#* PTP Core/debug
 +
#* RDT and remote status
 +
#** Synchronized Projects
 +
#* Resource Managers - legacy and JAXB (configurable)
 +
#* Monitoring - incl. new System Monitoring Perspective
 +
#* PLDT
 +
#* ETFw, other tool integrations (GEM, PPW, etc.)
 +
#* Photran
 +
#* Help changes for 5.0 - incl. New & Noteworthy
 +
#* Other PTP contributions
 +
# PTP User call report
 +
#* Next User call is June 22 2pm ET (4th Wednesday)  See [[PTP/PTP_User_Meetings]]
 +
# Education and Outreach
 +
#* Upcoming workshops/tutorials
 +
#* Status of outreach groups (grants etc.)
 +
# Other Business
 +
# Next meeting - July 12, 2011
 +
 +
== Attendees ==
 +
* Greg Watson, IBM
 +
* Beth Tibbitts, IBM
 +
* Alan Humphrey, U.Utah and ____
 +
* John Eblen, ORNL
 +
* Jeff Overbey, UIUC _____
 +
* Wyatt Spear, U.Oregon ____
 +
* Roland Schultz, ORNL ____
 +
* Jay Alameda, NCSA ____
 +
* Al Rossi, NCSA_______
 +
* Mike Kucera, IBM ____
 +
* Claudia Knobloch, Juelich  ____
 +
* Hari Krishnam, LSU
 +
* Ray Liu, NCSA
 +
* Dave Wootton, IBM
 +
 +
== Minutes ==
 +
 +
# Overall project, releases, etc.
 +
#* Next builds, releases
 +
#** 5.0 Indigo - near final builds...There will be an RC5 build.  Final release is June 22
 +
#** 4.x - 4.0.8 possibility: does RDT need a release after 4.0.7? Chris Thinks so
 +
#** 4.1 Branch - Greg made the branch.  IBM/Chris plan to use it.  Greg will change version numbers
 +
#** 5.0 release issues
 +
#*** Testing for Indigo is completed.  5.0.1 release will be a possibility soon. Don't know yes.
 +
#*** Download stats will use same URLs as 4.0, replace with 5.0
 +
 +
UNDER CONSTRUCTION
 +
 
#*** RC4 is now available on our update site (really RC4a  I201106091223) - http://download.eclipse.org/tools/ptp/updates/indigo
 
#*** RC4 is now available on our update site (really RC4a  I201106091223) - http://download.eclipse.org/tools/ptp/updates/indigo
 
#**** This should be our 'final' Indigo 5.0.0 build
 
#**** This should be our 'final' Indigo 5.0.0 build

Revision as of 16:02, 1 July 2011

June 2011 Meeting

Date: June 14, 2011 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0808-234-5071
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 4.0.x Helios (4.0.7 released on May 14); outlook for a 4.0.8?
      • 4.1 Branch
      • 5.0 Indigo - official release is June 22
      • Parallel Package of 5.0.0 on Indigo
        • RC4 parallel package (EPP build) is available on Indigo package build page
        • How to update parallel package from PTP update site
    • Testing plans for coverages of features, platforms
    • Download stats - how to track for 5.0.0 via portal, plus package downloads?
    • Transition to Git
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Help changes for 5.0 - incl. New & Noteworthy
    • Other PTP contributions
  3. PTP User call report
  4. Education and Outreach
    • Upcoming workshops/tutorials
    • Status of outreach groups (grants etc.)
  5. Other Business
  6. Next meeting - July 12, 2011

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Alan Humphrey, U.Utah and ____
  • John Eblen, ORNL
  • Jeff Overbey, UIUC _____
  • Wyatt Spear, U.Oregon ____
  • Roland Schultz, ORNL ____
  • Jay Alameda, NCSA ____
  • Al Rossi, NCSA_______
  • Mike Kucera, IBM ____
  • Claudia Knobloch, Juelich ____
  • Hari Krishnam, LSU
  • Ray Liu, NCSA
  • Dave Wootton, IBM

Minutes

  1. Overall project, releases, etc.
    • Next builds, releases
      • 5.0 Indigo - near final builds...There will be an RC5 build. Final release is June 22
      • 4.x - 4.0.8 possibility: does RDT need a release after 4.0.7? Chris Thinks so
      • 4.1 Branch - Greg made the branch. IBM/Chris plan to use it. Greg will change version numbers
#** 5.0 release issues
        • Testing for Indigo is completed. 5.0.1 release will be a possibility soon. Don't know yes.
        • Download stats will use same URLs as 4.0, replace with 5.0

UNDER CONSTRUCTION

      • Parallel Package of 5.0.0 on Indigo
        • RC4 parallel package (EPP build) is available on Indigo package build page
        • How to update parallel package from PTP update site
    • Testing plans for coverages of features, platforms
    • Download stats - how to track for 5.0.0 via portal, plus package downloads?
    • Transition to Git
  1. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Help changes for 5.0 - incl. New & Noteworthy
    • Other PTP contributions
  2. PTP User call report
  3. Education and Outreach
    • Upcoming workshops/tutorials
    • Status of outreach groups (grants etc.)
  4. Other Business
  5. Next meeting - July 12, 2011

Back to the top