Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/June 2011"

< PTP‎ | meetings
(Attendees)
(June 2011 Meeting)
 
(4 intermediate revisions by 2 users not shown)
Line 8: Line 8:
 
Toll Free (US): 888-426-6840<br>
 
Toll Free (US): 888-426-6840<br>
 
Toll Free (Germany): 0800-000-1018<br>
 
Toll Free (Germany): 0800-000-1018<br>
Toll Free (UK): 0808-234-5071<br>
+
Toll Free (UK): 0800-368-0638<br>
 
Passcode:  2221402
 
Passcode:  2221402
  
Line 52: Line 52:
 
* Greg Watson, IBM
 
* Greg Watson, IBM
 
* Beth Tibbitts, IBM
 
* Beth Tibbitts, IBM
* Alan Humphrey, U.Utah - moved to ____
+
* Alan Humphrey, Utah SCI Institute
 
* John Eblen, ORNL
 
* John Eblen, ORNL
 
* Jeff Overbey, UIUC  
 
* Jeff Overbey, UIUC  
Line 72: Line 72:
 
#** 4.x - 4.0.8 possibility: does RDT need a release after 4.0.7? Chris Thinks so
 
#** 4.x - 4.0.8 possibility: does RDT need a release after 4.0.7? Chris Thinks so
 
#** 4.1 Branch - Greg made the branch.  IBM/Chris plan to use it.  Greg will change version numbers
 
#** 4.1 Branch - Greg made the branch.  IBM/Chris plan to use it.  Greg will change version numbers
#** 5.0 release issues
+
#** 5.0 release issues
#*** Testing for Indigo is completed.  5.0.1 release will be a possibility soon. Don't know yes.  
+
#*** Testing for Indigo is completed.  5.0.1 release will be a possibility soon. Don't know yet.  
#*** Download stats will use same URLs as 4.0, replace with 5.0
+
#*** Download stats will use same URLs as 4.0 for p2 install, replace with 5.0. A ptp-master download/install will not bump download counts. Count parallel package downloads too of course.
 
+
UNDER CONSTRUCTION
+
 
+
#*** RC4 is now available on our update site (really RC4a  I201106091223) - http://download.eclipse.org/tools/ptp/updates/indigo
+
#**** This should be our 'final' Indigo 5.0.0 build
+
#**** Outlook for near-term bug fixes e.g. 5.0.1 soon after Indigo release?
+
 
#** Parallel Package of 5.0.0 on Indigo
 
#** Parallel Package of 5.0.0 on Indigo
 
#*** RC4 parallel package (EPP build) is available on [http://www.eclipse.org/downloads/index-developer.php  Indigo package build page]
 
#*** RC4 parallel package (EPP build) is available on [http://www.eclipse.org/downloads/index-developer.php  Indigo package build page]
 
#*** How to update parallel package from PTP update site  
 
#*** How to update parallel package from PTP update site  
#* Testing plans for coverages of features, platforms
+
#* Transition to Git - CDT is changing to Git.  CDT git tutorial and docs available at http://wiki.eclipse.org/PTP/environment_setup/git.  Wait about a month after CDT converts.
#** See [[PTP/testing/5.x#Test_Matrix]]
+
#** Do we want to transition to git? If so when? Roland would like to change, volunteers to coordinate our move:  Open bug to track: https://bugs.eclipse.org/bugs/show_bug.cgi?id=349695.  Roland will create wiki page to track.
#** How to track coverage (who tests what) vs. Results (have tests been run)
+
#** Will Git usage change releng/build? Yes.  Transition to Hudson build? Maybe at a later time.
#** Bug status/triage
+
#* Download stats - how to track for 5.0.0 via portal, plus package downloads?
+
#* Transition to Git
+
 
# Status Reports
 
# Status Reports
#* PTP Core/debug
+
#* RDT - no news
#* RDT and remote status
+
#** Synchronized Projects - John Eblen - workig on empty dir sync.  Greg says sync projects only work for C/C++ not Fortran.  John says sync should work for Managed Projects.  Greg had disabled.  Some tweaking left to do.
#** Synchronized Projects
+
 
#* Resource Managers - legacy and JAXB (configurable)
 
#* Resource Managers - legacy and JAXB (configurable)
#* Monitoring - incl. new System Monitoring Perspective
+
#** JAXB last minute bug fixes - seems stable.  (See User Meetings below for a detailed tutorial on JAXB configurable Resource Managers)
#* PLDT
+
#** System Monitoring Perspective (PBS ResMgr only). 
#* ETFw, other tool integrations (GEM, PPW, etc.)
+
#** PBS Legacy ResMgr removed, was buggy, encourage users to use new one.
#* Photran
+
#** Al working on developer docs
#* Help changes for 5.0 - incl. New & Noteworthy
+
#* Monitoring - incl. new System Monitoring Perspective - Claudia
 +
#** Hari Krishnan looking at using new RM framework?
 +
#* GEM = Alan - tested local/remote, 32/64 bit, updated New and Noteworthy, Help.  Ganesh at Utah has hired 2 more good undergrads to be working on GEM.  Can add to 6.0 features.  Alan now working for SCI but will continue to support PTP and GEM and possibly other features too.  
 +
#* Photran - Jeff
 +
#** SR1/SR2 could they be Photran 7.1 with new features? Must have a release review.  Greg will find out. Officially we are supposed to not have API changes.  To track API changes, please turn on API Tools with a PTP 5.0 baseline.  Package visibility affects whether something is API change or not.  See https://www.ibm.com/developerworks/opensource/library/os-eclipse-api-tools/ and http://wiki.eclipse.org/PDE/API_Tools/User_Guide and instructions for adding a baseline for PTP 4.0 are here:  http://dev.eclipse.org/mhonarc/lists/ptp-dev/msg03797.html (adapt for PTP 5.0)
 
#* Other PTP contributions
 
#* Other PTP contributions
 
# PTP User call report  
 
# PTP User call report  
#* Next User call is June 22 2pm ET (4th Wednesday)  See [[PTP/PTP_User_Meetings]]
+
#* Next User call is June 22 2pm ET (4th Wednesday)  See [[PTP/PTP_User_Meetings]] - topic is JAXB Resource Manager.  Al is working on slides.
 
# Education and Outreach
 
# Education and Outreach
#* Upcoming workshops/tutorials
+
#* Upcoming workshops/tutorials - Teragrid TG11 at Salt Lake City.  Jay giving 1/2 day tutorial the week before at Blue Waters Meeting. 
 +
#** We should hear about SC11 tutorial acceptance soon (N.B.:  PTP tutorial was accepted for SC11)
 
#* Status of outreach groups (grants etc.)
 
#* Status of outreach groups (grants etc.)
 +
#** SI2 User meeting week of August 22?  SI2 group annual report due soon.
 
# Other Business
 
# Other Business
 
# Next meeting - July 12, 2011
 
# Next meeting - July 12, 2011

Latest revision as of 10:12, 6 October 2011

June 2011 Meeting

Date: June 14, 2011 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 4.0.x Helios (4.0.7 released on May 14); outlook for a 4.0.8?
      • 4.1 Branch
      • 5.0 Indigo - official release is June 22
      • Parallel Package of 5.0.0 on Indigo
        • RC4 parallel package (EPP build) is available on Indigo package build page
        • How to update parallel package from PTP update site
    • Testing plans for coverages of features, platforms
    • Download stats - how to track for 5.0.0 via portal, plus package downloads?
    • Transition to Git
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Help changes for 5.0 - incl. New & Noteworthy
    • Other PTP contributions
  3. PTP User call report
  4. Education and Outreach
    • Upcoming workshops/tutorials
    • Status of outreach groups (grants etc.)
  5. Other Business
  6. Next meeting - July 12, 2011

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Alan Humphrey, Utah SCI Institute
  • John Eblen, ORNL
  • Jeff Overbey, UIUC
  • Wyatt Spear, U.Oregon
  • Roland Schultz, ORNL
  • Jay Alameda, NCSA
  • Al Rossi, NCSA
  • Mike Kucera, IBM
  • Claudia Knobloch, Juelich
  • Hari Krishnam, LSU
  • Ray Liu, NCSA
  • Dave Wootton, IBM

Minutes

  1. Overall project, releases, etc.
    • Next builds, releases
      • 5.0 Indigo - near final builds...There will be an RC5 build. Final release is June 22
      • 4.x - 4.0.8 possibility: does RDT need a release after 4.0.7? Chris Thinks so
      • 4.1 Branch - Greg made the branch. IBM/Chris plan to use it. Greg will change version numbers
      • 5.0 release issues
        • Testing for Indigo is completed. 5.0.1 release will be a possibility soon. Don't know yet.
        • Download stats will use same URLs as 4.0 for p2 install, replace with 5.0. A ptp-master download/install will not bump download counts. Count parallel package downloads too of course.
      • Parallel Package of 5.0.0 on Indigo
        • RC4 parallel package (EPP build) is available on Indigo package build page
        • How to update parallel package from PTP update site
    • Transition to Git - CDT is changing to Git. CDT git tutorial and docs available at http://wiki.eclipse.org/PTP/environment_setup/git. Wait about a month after CDT converts.
      • Do we want to transition to git? If so when? Roland would like to change, volunteers to coordinate our move: Open bug to track: https://bugs.eclipse.org/bugs/show_bug.cgi?id=349695. Roland will create wiki page to track.
      • Will Git usage change releng/build? Yes. Transition to Hudson build? Maybe at a later time.
  2. Status Reports
    • RDT - no news
      • Synchronized Projects - John Eblen - workig on empty dir sync. Greg says sync projects only work for C/C++ not Fortran. John says sync should work for Managed Projects. Greg had disabled. Some tweaking left to do.
    • Resource Managers - legacy and JAXB (configurable)
      • JAXB last minute bug fixes - seems stable. (See User Meetings below for a detailed tutorial on JAXB configurable Resource Managers)
      • System Monitoring Perspective (PBS ResMgr only).
      • PBS Legacy ResMgr removed, was buggy, encourage users to use new one.
      • Al working on developer docs
    • Monitoring - incl. new System Monitoring Perspective - Claudia
      • Hari Krishnan looking at using new RM framework?
    • GEM = Alan - tested local/remote, 32/64 bit, updated New and Noteworthy, Help. Ganesh at Utah has hired 2 more good undergrads to be working on GEM. Can add to 6.0 features. Alan now working for SCI but will continue to support PTP and GEM and possibly other features too.
    • Photran - Jeff
    • Other PTP contributions
  3. PTP User call report
    • Next User call is June 22 2pm ET (4th Wednesday) See PTP/PTP_User_Meetings - topic is JAXB Resource Manager. Al is working on slides.
  4. Education and Outreach
    • Upcoming workshops/tutorials - Teragrid TG11 at Salt Lake City. Jay giving 1/2 day tutorial the week before at Blue Waters Meeting.
      • We should hear about SC11 tutorial acceptance soon (N.B.: PTP tutorial was accepted for SC11)
    • Status of outreach groups (grants etc.)
      • SI2 User meeting week of August 22? SI2 group annual report due soon.
  5. Other Business
  6. Next meeting - July 12, 2011

Back to the top