Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/July 2012"

< PTP‎ | meetings
(Parallel Package Downloads)
(Parallel Package Downloads)
 
(16 intermediate revisions by the same user not shown)
Line 12: Line 12:
 
#Overall project, releases, etc.  
 
#Overall project, releases, etc.  
 
#*Next builds, releases  
 
#*Next builds, releases  
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29  
+
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 date?
 
#***see [[PTP/planning/6.0|Juno Planning page]]  
 
#***see [[PTP/planning/6.0|Juno Planning page]]  
#**6.0.2 release - planning
+
#*Download stats
#*Download stats - 63,177 for Indigo SR2 (PTP 5.0.x) as of 6/12/12; see below for details
+
#**2617 for  Juno Parallel package since Juno release June 27;
 +
#**64,860 total Indigo SR2 (PTP 5.0.x)  
 
#Status Reports  
 
#Status Reports  
 
#*PTP Core/debug  
 
#*PTP Core/debug  
Line 31: Line 32:
 
#*Other PTP contributions  
 
#*Other PTP contributions  
 
#PTP User call report  
 
#PTP User call report  
#*Previous call was Wed April 25, 2012 (4th Wednesday) See [[PTP/PTP User Meetings]] - answering various user questions
+
#*Previous call was Wed June 27, 2012 (4th Wednesday) See [[PTP/PTP User Meetings]] - Jeff Overbey demo'd PTP 6.0 features in Juno release
#*Next meeting? 4th Wed is May 23&nbsp;????
+
#*Next meeting? 4th Wed is July 25
 
#Education and Outreach  
 
#Education and Outreach  
 
#*PTP Tutorials scheduled for  
 
#*PTP Tutorials scheduled for  
#**ICS Venice (June 29, accepted) [http://ics-conference.org/ICS12Work_Tut.html#T9]
 
 
#**XSEDE Chicago(July 16, accepted)  
 
#**XSEDE Chicago(July 16, accepted)  
#**Juelich Supercomputing Centre [http://www.fz-juelich.de/SharedDocs/Termine/IAS/JSC/EN/courses/ptp-tutorial.html]  
+
#**Juelich Supercomputing Centre [http://www.fz-juelich.de/SharedDocs/Termine/IAS/JSC/EN/courses/ptp-tutorial.html] (July 5)
#**SC12 Salt Lake City(Nov 18 or 19, proposed);  
+
#**SC12 Salt Lake City (Nov 18 or 19, proposed);  
 
#*BOFs  
 
#*BOFs  
 
#**XSEDE (accepted)  
 
#**XSEDE (accepted)  
 
#**SC12 for Wed Nov 21 5:30-7 PM (proposed)  
 
#**SC12 for Wed Nov 21 5:30-7 PM (proposed)  
 
#Other Business  
 
#Other Business  
#Next meeting - Tuesday July 10
+
#Next meeting - Tuesday August 14
  
== Attendees ==
+
== Attendees ==
 +
*Beth Tibbitts, IBM
 +
*Brian Watt, IBM
 +
*Chris Navarro, NCSA
 +
*John Eblen, ORNL
 +
*Wyatt Spear, U.Oregon
 +
*Jay Alameda, NCSA
 +
*Jeff Overbey, NCSA
  
Greg Watson @IBM, Beth Tibbitts @IBM, Claudia Knobloch @Juelich, John Eblen @ORNL, Jeff Overbey @NCSA, Jay Alameda @NCSA, Roland Schulz @ORNL, Chris Navarro @NCSA, Brian Watt @IBM, Wyatt Spear @U.Oregon, Hari Krishnan @LSU
+
== Minutes ==
  
== Minutes  ==
+
#Overall project, releases, etc.
 
+
#*Next builds, releases
*Testing - Please keep testing everyone, fixes can go into a bugfix release soon
+
#**6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 date - might be immediate preceding XSEDE tutorial if needed (which would be this coming Friday) - no consensus on if we need it or not yet. W, will try to do soon.
**Plan to release PTP 6.0.1 at Juno release (June 27) or shortly thereafter
+
#*Download stats
**Might do another bugfix release prior to XSEDE tutorial (which is July 16)  
+
#**2930 for  Juno Parallel package since Juno release June 27 (other numbers in table below may not add up since final number is real-time and other queries are as of the day before)
*Eclipse Kepler (June 2013 Eclipse release) - don't branch for this yet.
+
#**64,860 total Indigo SR2 (PTP 5.0.x)  
**Kepler plans: Remove Legacy Res Managers, proxy (deprecated for Juno)  
+
#Status Reports 
*Status  
+
#*RDT and remote status
**Synchronized Projects:
+
#**Synchronized Projects - John - deciding what to do next, post-Juno
***Greg changed new project wizard UI to group local and remote directory info sections
+
#*Resource Managers / Target System Configurations - legacy and JAXB (configurable)
***Merge Conflict - John added html help and updated screen shots
+
#** Wyatt - testing Cray support with ETFw.  Will talk to Jeff.
***Bug related to move and copy of projects fixed
+
#** Jeff knows of some small changes to improve forge.ncsa.illinois.edu but it's having end of life soon - but will be used in XSEDE tutorial first.
*Testing
+
#*Photran
**Automated GUI testing - any ideas?
+
#** Jeff has more docs to catch up on.  Beth mentioned can still add to help.eclipse.org
***John using SwtBot some; John has used Jubula before;
+
#*Docs, Help, N&amp;N
***Issues with testing connection with remote servers; Passwords are stored in a sample config file, real ones are not committed; could it run on Hudson build server @eclipse.org?
+
#** Res Mgr docs in help need updating for inclusion on launch configurations - currently most of the files just have a disclaimer e.g. "not updated for new target system configuration usage directly on launch configuration dialog"
***Jay will look into NCSA machine and security issues for testing
+
#*Other PTP contributions
***Roland will look into how eGit does testing. Could we test remote to localhost?
+
#PTP User call report
*Framework - Integration of Active Jobs - commands to control Job (e.g. cancel/hold) - Greg added recently
+
#*Previous call was Wed June 27, 2012 (4th Wednesday) See [[PTP/PTP User Meetings]] - Jeff Overbey demo'd PTP 6.0 features in Juno release. Jay will post the recorded session on the meetings page.
**Can only control jobs launched via Eclipse
+
#*Next meeting? 4th Wed is July 25 - may cancel
*Claudia reports Wolfgang working on problmes with monitoring; closing and restarting connection caused problems.
+
#Education and Outreach
*ETFw - Wyatt
+
#*PTP Tutorials scheduled for  
**Convert to JAXB with Chris Navarro's help (in PTP 7.0?)
+
#**XSEDE Chicago(July 16, accepted)  
**Brian Watt inspried some new features in 6.0.1
+
#**Juelich Supercomputing Centre [http://www.fz-juelich.de/SharedDocs/Termine/IAS/JSC/EN/courses/ptp-tutorial.html]  (July 5) - very successful
**Bluegene support - OK but needs more work; Kevin Huck working on this
+
#**SC12 Salt Lake City (Nov 18 or 19) - accepted! more focus on performance tools
**Integrate with PTP module support? Jeff says it also works with softenv support, but hasn't tested it much. Modules support does support launching
+
#*BOFs
*Next User call is June 27
+
#**XSEDE (accepted)
**"New and Noteworthy Tour" for PTP 6.0 which releases with Juno on that date
+
#**SC12 for Wed Nov 21 5:30-7 PM (proposed)
**Jay will drive the 'tour' (Correction: Jeff Overbey drove the demo/tour for the PTP User call on June 27)
+
#Other Business
*Video software for capturing demo movies?
+
#Next meeting - Tuesday August 14
**Camtasia (costs $$); Jeff recommends HyperCam (Free)  
+
*Outreach
+
**Tutorials upcoming: XSEDE July 16(accepted); SC12 (expect notification July 1?); ORNL Tutorial (Greg+Beth) September?; ICS tutorial @Vencie 1/2 day (N.B. ICS tutorial cancelled); Juelich tutorial full day (Greg + Carsten) after ICS
+
**Face to Face User and Developer Meeting in Chicago Area during the second half of September - need to schedule (N.B. Tentative Sept 18-19?)  
+
**Tutorial planning for XSEDE, Juelich, etc. - use PBS Batch for sample project.
+
*Next Meeting July 10
+
 
+
<br>
+
  
 
=== Parallel Package Downloads  ===
 
=== Parallel Package Downloads  ===
Line 154: Line 153:
 
| 64,860
 
| 64,860
 
|-
 
|-
! Juno
+
! Juno  
! June 2012  
+
! (4 days!) June 2012  
| &nbsp;
+
| 902
| &nbsp;
+
|  
 +
902
 +
 
 
|-
 
|-
 
! Juno  
 
! Juno  
 
! July 2012  
 
! July 2012  
|  
+
| 1562
|  
+
| 2930
 
|}
 
|}
  
*downloads for July as of ...
+
*downloads for July as of ... July 10
  
 
By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463 <br>By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773  
 
By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463 <br>By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773  
 +
<br>Juno by platform so far: Win32 812; Win64 731; Linux32 287; Linux64 608; Mac32 41; Mac64 139
 +
<br>&nbsp;&nbsp; Totals Windows 1543; Linux 895; Mac 180
 +
 +
<br>
  
<br>
+
Juno downloads RC1 93; RC2 61; RC3 418;&nbsp;

Latest revision as of 22:22, 21 August 2012

July 2012 Meeting

Date: July 10, 2012 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402


Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
    • Download stats
      • 2617 for Juno Parallel package since Juno release June 27;
      • 64,860 total Indigo SR2 (PTP 5.0.x)
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers / Target System Configurations - legacy and JAXB (configurable)
      • RM-less launch infrastructure
      • Legacy Resource Manager-based launch ?
        • JAXB-based RMs and legacy RMs (some require proxy on target)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations
    • Photran
    • Docs, Help, N&N
    • Other PTP contributions
  3. PTP User call report
    • Previous call was Wed June 27, 2012 (4th Wednesday) See PTP/PTP User Meetings - Jeff Overbey demo'd PTP 6.0 features in Juno release
    • Next meeting? 4th Wed is July 25
  4. Education and Outreach
    • PTP Tutorials scheduled for
      • XSEDE Chicago(July 16, accepted)
      • Juelich Supercomputing Centre [1] (July 5)
      • SC12 Salt Lake City (Nov 18 or 19, proposed);
    • BOFs
      • XSEDE (accepted)
      • SC12 for Wed Nov 21 5:30-7 PM (proposed)
  5. Other Business
  6. Next meeting - Tuesday August 14

Attendees

  • Beth Tibbitts, IBM
  • Brian Watt, IBM
  • Chris Navarro, NCSA
  • John Eblen, ORNL
  • Wyatt Spear, U.Oregon
  • Jay Alameda, NCSA
  • Jeff Overbey, NCSA

Minutes

  1. Overall project, releases, etc.
    • Next builds, releases
      • 6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 date - might be immediate preceding XSEDE tutorial if needed (which would be this coming Friday) - no consensus on if we need it or not yet. W, will try to do soon.
    • Download stats
      • 2930 for Juno Parallel package since Juno release June 27 (other numbers in table below may not add up since final number is real-time and other queries are as of the day before)
      • 64,860 total Indigo SR2 (PTP 5.0.x)
  2. Status Reports
    • RDT and remote status
      • Synchronized Projects - John - deciding what to do next, post-Juno
    • Resource Managers / Target System Configurations - legacy and JAXB (configurable)
      • Wyatt - testing Cray support with ETFw. Will talk to Jeff.
      • Jeff knows of some small changes to improve forge.ncsa.illinois.edu but it's having end of life soon - but will be used in XSEDE tutorial first.
    • Photran
      • Jeff has more docs to catch up on. Beth mentioned can still add to help.eclipse.org
    • Docs, Help, N&N
      • Res Mgr docs in help need updating for inclusion on launch configurations - currently most of the files just have a disclaimer e.g. "not updated for new target system configuration usage directly on launch configuration dialog"
    • Other PTP contributions
  3. PTP User call report
    • Previous call was Wed June 27, 2012 (4th Wednesday) See PTP/PTP User Meetings - Jeff Overbey demo'd PTP 6.0 features in Juno release. Jay will post the recorded session on the meetings page.
    • Next meeting? 4th Wed is July 25 - may cancel
  4. Education and Outreach
    • PTP Tutorials scheduled for
      • XSEDE Chicago(July 16, accepted)
      • Juelich Supercomputing Centre [2] (July 5) - very successful
      • SC12 Salt Lake City (Nov 18 or 19) - accepted! more focus on performance tools
    • BOFs
      • XSEDE (accepted)
      • SC12 for Wed Nov 21 5:30-7 PM (proposed)
  5. Other Business
  6. Next meeting - Tuesday August 14

Parallel Package Downloads

Download numbers, by month, of 'IDE for Parallel Application Developers' available on http://eclipse.org/downloads. This count is since the release of Eclipse Indigo SR1, on 23 Sept. 2011. SR2 was made available on Feb 24, 2012 and the download numbers were reset to 0 for SR2 counts.

Release Month Downloads Total Downloads
Indigo SR1 Sept 2011 3825 3,825
Indigo SR1 Oct 2011 8630 12,455
Indigo SR1 Nov 2011 8777 21,232
Indigo SR1 Dec 2011 4506 25,738
Indigo SR1 Jan 2012 8179 32,480
Indigo SR1 Feb 2012  6381 40,298
Indigo -SR2 Feb 2012 7329 7,329
Indigo -SR2 Mar 2012 43,849 51,178
Indigo -SR2 Apr 2012 6150 57,328
Indigo -SR2 May 2012 4713 62,041
Indigo -SR2 June 2012 2752 64,860
Juno (4 days!) June 2012 902

902

Juno July 2012 1562 2930
  • downloads for July as of ... July 10

By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463
By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773
Juno by platform so far: Win32 812; Win64 731; Linux32 287; Linux64 608; Mac32 41; Mac64 139
   Totals Windows 1543; Linux 895; Mac 180


Juno downloads RC1 93; RC2 61; RC3 418; 

Back to the top