Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/August 2014"

< PTP‎ | meetings
(Attendees)
(Minutes)
Line 51: Line 51:
  
 
== Minutes ==
 
== Minutes ==
* Can we get an allocation for trestles userids for prep for XSEDE14 tutorial? Jay will get for Greg
 
* Kepler development ceased? Focus on Luna now.
 
* Git branches - which build is where?
 
** master - will be 8.1 or 9.0
 
** ptp_8_0 - bug fixes - then merge with master branch
 
* Next sim release is Mars
 
* 8.0.1 release end of this week - would be available for XSEDE tutorial on Monday
 
* debugger fix for OpenMPI 1.8 - is in 8.0.1 build.  Beth will respond to poster for him to test.
 
** Greg also needs to check it works for older OpenMPI's - esp e.g. on trestles.
 
* 437560, 439084: bug: pick current path and type subdir when it returns. Use this for tutorial slides.
 
* Wyatt: will try modules on trestles
 
* Where are builds?
 
** master - openmpi fix is in there
 
** ptp_8_0 - not a separate
 
** Greg needs to shift release to 8.0, nightly still will be maintenance will be ptp 7.0=kepler - will try to do that today (and Beth will test links)
 
* point release e.g. 8.1 would require a release review, set deadline for API changes, etc - prior to SR release.
 
* Downloads: Beth will total R+SR1+SR2
 
* Hackathon: advertize at XSEDE tutorial & BOF. https://wiki.eclipse.org/PTP/workshops/PTP_Workshop_2014
 
** Aug 12-13 in Baton Rouge - contact Steve first re: travel support
 
** Greg invited Eclipse Science working group
 
** Lodging: Staybridge Suites (not Comfort) or Lod Cook
 
* Status reports
 
** Wyatt has been doing some perf visualization via a javaFX bridge? Perhaps can reference into lightweight support that can be integrated with Eclipse/PTP
 
** Greg: working on some remote stuff
 
** John E: talked about replacing test suite plug-in?  Different package - get rid of old one, use new one (diff. name)  sync core tests ?
 
* Next meeting would be during Hackathon - August 12 - plan to call in via a speakerphone while we're there.
 
** Hackathon attendees tentatively include: John, Jeff, Beth, Greg, Wyatt, Chris N maybe, Dave W, Jay
 
  
 
== Parallel Package Downloads  ==
 
== Parallel Package Downloads  ==

Revision as of 12:29, 12 August 2014

August 2014 Meeting

Date: August 12, 2014 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  • Overall project, releases, etc.
    • PTP 8.0.0 - Simultaneous release was Luna-based PTP 8.0.0 with Eclipse Luna simultaneous release on June 25
    • PTP 8.0.1 - released July 13
    • PTP 8.0.2 - next release - with Eclipse Luna's Service Release 1 (SR1) Sept. 26 - SR1's dates: (Tuesdays)
      • RC1+2 Aug 19;
      • RC2+2 Sept 2;
      • RC3+2 Sept 9;
      • RC4+2 Sept 16 FINAL BUILD - release Sept 26
    • Mars (June 2015) Eclipse release - when do we join the build?
      • bug fixes
  • Outstanding bugs for Luna
    •  ???
  • Git branches - which build is where?
    • master
    • ptp_8_0
    • other?
  • Downloads (see bottom of page): Parallel Package: over 190K for Kepler-SR2 Parallel package - Luna 92,015 as of August 12 - INTERESTING STATS:
    • Highest ever single release: Juno SR1 February 2013 -- 290,533
    • Indigo SR2 final -- June 2012 -- 64,860
    • Juno SR2 final -- June 2013-- 128,853
    • Kepler SR2 final -- June 2014 --191,893
  • Follow-up on last month etc.
    • Hackathon in progress - at LSU / Baton Rouge (Steve Brandt, Host)
  • PTP User meeting next meeting - Wed August 27 - introduce Luna features?
    • Luna new features including new GUI terminal (Steve B can demo?) - need other volunteers
  • Status Reports
    •  ?
  • Education/Outreach:
  • Any TM topics?
  • Next Meeting September 9

Attendees

From PTP Hackathon conference room at LSU:

  • Steve Brandt, Dave Wootton, Greg Watson, Dennis Castleberry, Wyatt Spear, John Eblen, Hari Krishnan, Jeff Overbey, Beth Tibbitts, Ian Briggs, Mark Baranowski, Chris Navarro, Jay Alameda

Minutes

Parallel Package Downloads

Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.

Release Month Downloads Total Downloads
Indigo SR1 thru Feb 2012  40,298
Indigo SR2 thru June 2012 64,860
Juno (4 days!) June 2012 902 902
Juno July 2012 8169 9071
Juno August 2012 19,112 28,009
Juno September 2012 47,648 76,457
Juno SR1 September 2012 5346 5346
Juno SR1 October 2012 65,353 70,699
Juno SR1 November 2012 58,796 129,495
Juno SR1 December 2012 57,811 187,306
Juno SR1 January 2013 63,350 250,656
Juno SR1 February 2013 39,877 290,533
Juno SR2 March 2013 41,367 41,367
Juno SR2 April 2013 36,372 77,739
Juno SR2 May 2013 28,575 106,316
Juno SR2 June 2013 22,521 128,853
Kepler R (5 days) June 2013 4003 4003
Kepler R July 2013 26,070 30,073
Kepler R August 2013 26,732 56,805
Kepler R September 2013 28,751 85,556
Kepler SR1 (4 days) Sept 2013 4670 4670
Kepler SR1 October 2013 40,440 45,110
Kepler SR1 November 2013 48,723 93,833
Kepler SR1 December 2013 39,648 133,481
Kepler SR1 January 2014 36,085 169,566
Kepler SR1 February 2014 39,193 208,759
Kepler SR2 February 2014 1189 1189
Kepler SR2 March 2014 57,038 58,227
Kepler SR2 April 2014 52,080 110,307
Kepler SR2 May 2014 41,033 151,340
Kepler SR2 June 2014 40,553 191,893
Luna R (6 days) June 2014 7554 7554
Luna R July 2014 60,816 68,370
Luna R August* 2014 92,015



August* downloads as of August 12

<< Previous month stats | Next month stats >>

Back to the top