Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "OpenPASS planning"

Line 8: Line 8:
  
 
The actual planning is done in the [https://tuleap.eclipse.org/projects/openpass OpenPASS Tuleap Tracker].
 
The actual planning is done in the [https://tuleap.eclipse.org/projects/openpass OpenPASS Tuleap Tracker].
 +
 +
=== Epics ===
 +
(...)
  
 
=== Scope of minor releases ===  
 
=== Scope of minor releases ===  
Line 14: Line 17:
 
* ...
 
* ...
  
=== Epics ===
+
 
(...)
+
  
  

Revision as of 02:41, 31 July 2018

OpenPASS logo.png

Release Planning Process

(..)

Input for release planning (draft epics)

This is to collect to collect input on a higher level, e. g. ideas for epics & user stories of the next releases.

The actual planning is done in the OpenPASS Tuleap Tracker.

Epics

(...)

Scope of minor releases

  • v0.6
  • v0.7
  • ...



Website creation

Ralph Müller offered to work with a smaller group to create some initial / meaningful content for the website. This could happen during the summer vacation period.

Website group

  • Ralph Müller (Eclipse)
  • Jan Dobberstein (Daimler)
  • Katharina Findling (BMW)
  • TBD (ITK, VW GoA, TÜV Süd, Toyota)

Structure

Template for IWG pages, Link tree..

Available material

e. g. papers, images from presentations

Documentation

(link to proposal, minutes from Jul 23 meeting)

Copyright © Eclipse Foundation, Inc. All Rights Reserved.