Difference between revisions of "ORMF Progress report 22 dec 08"
(→Barbara) |
(→Achievements) |
||
Line 14: | Line 14: | ||
=== Achievements === | === Achievements === | ||
− | All of the above | + | All of the above was completed. |
== Bobby == | == Bobby == |
Latest revision as of 07:16, 29 December 2008
< To: ORMF progress reports
Contents
Achim
Goals
Achievements
Barbara
Goals
- Complete preparation of Wiki pages for the Survey of Requirements Standards
- Prepare Wiki Progress Report pages
- Publish initial requirements model and begin review process
- Investigate CQ awaiting action
Achievements
All of the above was completed.
Bobby
Goals
Achievements
Joel
Goals
- Refactor code into OSGi bundles.
- Implement a DomainFactoryService to create domain objects.
- Implement a PersistenceService that dishes up DAOs for each domain type.
- Introduce SAT into all bundles.
- Set up Derby as a Service. It needs to start up the embedded database.
- Implement an OSGi application to set up and load database.
- Introduce Riena into the server remote service bundles.
Achievements
All of the above was completed.