Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Nebula Actions

Project plan

We have to provide a project plan. Aside from release planning, each widget have to provide links to committed, proposed and deferred bugzilla items. In order to do this, you need to :

- Add 3 bugzilla search urls to nebula-project-plan.xml

- Add keyword 'plan' to your major bugzilla items and update priorities. For Gallery : P1 = committed, P2/P3 : proposed, P4/P5 : deferred

To edit the project plan, checkout the Nebula website from cvs and edit

 project-info/nebula-project-plan.xml

This can be done approx. in 30 minutes.

Helpful links :

- Project Plan Documentation : [1]

- Current Nebula project plan : [2]

- Current Nebula project plan as XML: [3]

IP Log

We have to provide an IP log. It automatically generated from bugs attachements having the flag iplog+. We just have to dig bugzilla for patch which were applied to the code and add this flag.

See IP log: [4]


Examples

We are very close to provide an offical Webstart example of Nebula widgets, but only 4 widgets currently have their example tab. It is very easy to turn a snippet to an example tab, but if you have some more free time, show your widget at its best.

A bug have been logged for each missing widget. (include bug # here)


Ohloh (Bonus)

The CVS history of Nebula is analysed by ohloh : http://www.ohloh.net/p/5650. If each committer adds its name, photo and location, this would provide some nice informations and stats. :)

Back to the top