Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Mylyn/Meetings

< Mylyn
Revision as of 14:52, 8 October 2007 by Steffen.pingel.eclipse.org (Talk | contribs) (Pending Discussion Items)

Tel: 1-866-362-7064 or 1-613-287-8000, Passcode: 892048#

Mylyn Meetings Archive

Pending Discussion Items

  • bug 203399 standardize hyperlinking strategy for the Task Editor (Eugene)
  • Active task and working set presentation/switching when Task List is not visible
  • Design discussion: queries, categories, groupings and recommended settings bug 175318 (Mik)
  • Visualization of entries that don't match queries bug 201157 (Eugene)
  • Arbitrary attributes discussion bug 199818
  • Design discussion - bugzilla cached configuration (Rob)

Next Meeting

Planning meetings are open to all interested. When adding an item to the agenda please include your name.

Tuesday, October 9, 10-11am PT

Agenda:

  • Summary bug view / quick viewing of bug reports design discussion: bug 205669 (Steffen)

Minutes:


Past Meetings

Tuesday, October 2, 10-11am PT

Agenda:

  • 2.1 release review (Mik)
  • Eclipse.org bandwidth usage bug 196056 bug 205213 (Rob)
  • XPlanner update (Helen)
  • 3.0 plan review and bug triage (all)
  • Mylyn connector for mingle (Ketan)

Minutes:


Tuesday, September 25, 10-11am PT

Agenda:

  • Mylyn 2.1, Europa Fall Update and Ganymede status and review of remaining items (Mik)
  • Update sites, linking and download redesign (Mik) bug 194469
  • Sandbox quality bar and policy for inclusion of features for discoverable sites in Europa Fall Update (Mik) bug 204560
  • Subtasks being enabled by default for Bugzilla and corresponding policies (Rob, Mik, Eugene)
    • artificial "grouping" vs. showing subtasks
  • JIRA update (Steffen)
  • XPlanner update (Helen)

Minutes:

  • Update site should include historical builds as part of archive
  • Subtask setting to be renamed

Tuesday, September 18, 10-11am PT

Agenda:

  • Policy for adding stuff to the Sandbox, i.e. group by scheduled vs. "out of nowhere" "Incoming (Experimental)" presentation (Eugene)
  • Review of all bugs scheduled for Mylyn 2.1 (all)
  • 3.0 planning (Mik)
  • bug 203399 standardize hyperlinking strategy for the Task Editor (Eugene)

Minutes:


Tuesday, September 11, 10-11am PT

Agenda:

  • Review of all bugs scheduled for Mylyn 2.1 (all)
  • Policy for making significant changes to open bugs' status, e.g. marking for bugday (Mik)
  • 3.0 planning (Mik)
  • Design discussion: queries, categories, groupings and recommended settings bug 175318 (Mik)
  • Visualization of entries that don't match queries bug 201157 (Eugene)
  • Arbitrary attributes discussion bug 199818
  • Summary bug view / quick viewing of bug reports design discussion
  • Design discussion - bugzilla cached configuration

Minutes:



Tuesday, September 4, 10-11am PT

Agenda:

  • Missed BugDay
  • Summer of Code wrap-up (Jevgeni, Xiaoyang, Balazs)
  • Policy:
    • Resolving bug reports (Rob)
    • Reopening closed reports, i.e. AllTasks fails (Eugene)
  • Design discussion - bugzilla cached configuration
  • 2.1 and 3.0 Planning (Mik)
  • Arbitrary attributes discussion bug 199818
  • Visualization of entries that don't match queries bug 201157 (Eugene)

Minutes:

  • Bug Day
    • We will participate in Bug Day
    • Need to continute to maintain/label bug day bugs
    • Must maintain calendar of bug day events and send announcemnts to newsgroup/mailing lists
    • Eugne willing to mentor on bug days
  • Policy
    • Contributions (patches) must be accompanied with summary of issues addressed by provided patch. Must also indicate if patch is intended to resolve bug report or further work required. (Rob will update Contributor Reference)
    • Reopening closed reports not encouraged. Mik will resolve bug#152869 - creating bugs from failed unit tests for 2.1
  • Builds
    • RC builds, dev builds as weekly milestone builds (Mik to send proposal to newsgroup to get feedback from community on this proposed change)

Back to the top