Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Meetings"

m (Tuesday, October 2, 10-11am PT)
m
Line 1: Line 1:
 
[[Category:Mylyn]]
 
[[Category:Mylyn]]
 
Tel: '''1-866-362-7064''' or 1-613-287-8000, Passcode: '''892048#'''
 
Tel: '''1-866-362-7064''' or 1-613-287-8000, Passcode: '''892048#'''
 +
 +
[[Meeting Archives]]
  
 
=== Pending Discussion Items ===
 
=== Pending Discussion Items ===
Line 15: Line 17:
  
 
Planning meetings are open to all interested.  When adding an item to the agenda please include your name.
 
Planning meetings are open to all interested.  When adding an item to the agenda please include your name.
 +
 +
==== Tuesday, October 9, 10-11am PT ====
 +
 +
Agenda:
 +
* ...
 +
 +
Minutes:
 +
----
 +
 +
=== Past Meetings ===
  
 
==== Tuesday, October 2, 10-11am PT ====
 
==== Tuesday, October 2, 10-11am PT ====
Line 27: Line 39:
 
Minutes:
 
Minutes:
 
----
 
----
 
=== Past Meetings ===
 
  
 
==== Tuesday, September 25, 10-11am PT ====
 
==== Tuesday, September 25, 10-11am PT ====
Line 99: Line 109:
 
* Builds
 
* Builds
 
** RC builds, dev builds as weekly milestone builds (Mik to send proposal to newsgroup to get feedback from community on this proposed change)
 
** RC builds, dev builds as weekly milestone builds (Mik to send proposal to newsgroup to get feedback from community on this proposed change)
 
==== Tuesday, August 28, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code wrap-up (Jevgeni, Xiaoyang, Balazs(done) )
 
* Merging TaskData and AbstractTask (Eugene)
 
* Visualization of entries that don't match queries {{bug|201157}}
 
* Policy: resolving bug reports (Rob)
 
* 2.1 and 3.0 Planning (Mik)
 
* Arbitrary attributes discussion {{bug|199818}}
 
 
Minutes:
 
* Mik: add starting points for writing unit tests to cover UI
 
 
 
==== Tuesday, August 21, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports and wrap-up (Balazs, Jevgeni, Xiaoyang)
 
** Figure out how to distribute Trac wiki editor {{bug|200114}} (Steffen)
 
* Timezone datestamp issue {{bug|198714}} (Rob)
 
* API to store arbitrary attributes in the AbstractTask: patch on bug {{bug|199818}}, {{bug|199817}} (Eugene)
 
* Grouping of query elements, 2nd patch on {{bug|175318}} (Eugene)
 
* Policy: resoving bug reports (Rob)
 
* 2.1M1 release planning (Mik)
 
* 2.1 and 3.0 Planning (Mik)
 
 
==== Tuesday, August 14, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* API to store arbitrary attributes in the AbstractTask: {{bug|199818}}, {{bug|199817}} (Eugene)
 
* Vacation catchup (Mik & Rob)
 
* 2.1M1 release planning (Mik)
 
 
Minutes:
 
...
 
 
==== Tuesday, July 31, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* August 7 meeting CANCELLED (most committers offline)
 
 
==== Tuesday, July 24, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* 3.0 planning (Mik)
 
 
Minutes:
 
* Explore participation in Eclips.org Bug Day
 
* Add 'helpwanted' query to community page
 
* Mik offline: July 30 - August 10
 
* Rob offline: August 3 - 8
 
* Steffen offline: August 7 - 14
 
----
 
 
==== Tuesday, July 17, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* XPlanner status (Helen)
 
* vserver admin status report (Rob)
 
* dev builds are behind bug reports (Eugene)
 
* grouping in the task list [https://bugs.eclipse.org/bugs/show_bug.cgi?id=175318 bug 175318] (Eugene)
 
* refactor abstract task editor to not use ScrolledForm [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195326 bug 195326] (Eugene)
 
* <s>Duplicate detector for jira [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195079 bug 195079]</s>(Rob)
 
* Bug triage and clean-up (Mik)
 
* 3.0 planning (Mik)
 
 
Minutes:
 
* ...
 
 
 
==== Tuesday, July 10, 10-11am PT ====
 
 
Agenda:
 
* 3.0 Objectives (Mik)
 
* <s>"Additional Settings" section in Repository settings [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195058 195058] (Eugene)</s>
 
* Pending Patches (Steffen)
 
 
Minutes:
 
* Steffen to create new bug to address revealing bugs with pending patches in the Task List UI
 
 
==== Tuesday, July 4, 10-11am PT ====
 
 
Agenda:
 
* Summer of code update (students)
 
* 2.0 decompression (Mik)
 
* Update site split (Mik)
 
 
Minutes:
 
* Tools for checking for binary and source compatibility with older releases: [http://clirr.sourceforge.net/ Clirr], [http://javadiff.sourceforge.net/ JDiff]
 
* Automatic adding "extras" update site entry and follow up on "sites to visit" bug in PDE
 
 
==== Tuesday, June 26, 10-11am PT ====
 
 
* Summer of code update (students)
 
* 2.0 endgame (Mik)
 
* Feature and update site changes, EPP packaging (Mik)
 
* Continuous build (Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=194258 194258]  [api] Stream multi task data retrieval straight to storage bypassing in memory cache (Eugene)
 
* Contribution for committers (Eugene)
 
 
Minutes:
 
 
==== Tuesday, June 19, 10-11am PT ====
 
 
* Summer of code update (students)
 
* Continuous build (Steffen)
 
 
Future:
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* vserver admin status report
 
----
 
 
==== Tuesday, June 12, 10-11am PT ====
 
 
* Project Rename Status (Mik)
 
* Summer of code update (students)
 
* 2.0 RC1 release status (Mik)
 
** Release of JIRA connector?
 
* Error handling design (Mik, Rob, Steffen)
 
* Fixes for the synchronization API ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 #191575])
 
* Notification of API changes (Steffen)
 
 
Actions:
 
* Mik to investigate options for disabling old mylar plugins (required for tonight's dev build)
 
* Eugene to take quick pass at synchronization api changes tonight [[https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 bug#191575]]
 
----
 
 
 
 
==== Tuesday, June 5, 10-11am PT ====
 
 
* Google Summer of Code kick-off (Balazs, Jevgeni, Xiaoyang)
 
* vserver admin practices (Rob, Steffen)
 
* 2.0 end game planning
 
** Committers 2.0 plan update
 
* Task Repository in offline mode (Mik)
 
* New Task List layout (Mik)
 
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
<i>Stale items</i>
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Actions:
 
* Rob to administer vserver (corrdinate with Steffen)
 
** Contact Denis regarding updates
 
** Investigate backup options
 
 
==== Tuesday, May 29, 10-11am PT ====
 
 
* 2.0 end game planning
 
* Task Repository in offline mode (Mik)
 
* New Task List layout (Mik)
 
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Task vs. TaskData; properties vs. class hierarchy (Eugene)
 
** Full vs. light synchronization (Eugene)
 
<i>Stale items</i>
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Minutes:
 
* (Eugene) Proposed eliminating Task hierarchy and replace with property based access
 
** Suggests merging Task and AbstractRepositoryTask
 
** Willing to add property support to ITask for 2.1 if requested by integrators.
 
* (Steffen) The property-based vs. sub-classing discussing is important and we need to consider this for 3.0 again.
 
* (Rob) raised TaskData migration and committers agree that migraion of existing offline data not practical
 
 
Actions:
 
* (Mik) introduce class factories and remove custom task externalizers
 
* replace AbstractQueryHit by Tasks
 
* allow connectors to submit Task or TaskData objects as hits
 
* convert offline storage from Java Serialization to XML
 
* construct attribute editors through factory, do not store repository configuration in offline storage
 
* apply pending rename changes from porting guide
 
* refactor attachment API
 
 
 
 
==== Tuesday, May 22, 10-11am PT ====
 
 
* 2.0 end game planning
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
* Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Do we really need two separate APIs for task list and offline storage?
 
** Class hierarchy vs. property-based API
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* Top voted bug: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=169123 169123]: Updated bug does not preserve values of custom fields in Jira (Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Minutes:
 
* Task workflow and special query support likely getting bumped
 
* Rob: related bug#185805 (timestamp bug) and bug#186939 (blocked jobs)
 
* Steffen: httpclient message.shutdown() can be used to force shutdown of network IO
 
 
Actions:
 
* Rob and Steffen:
 
**to start offline refactoring.
 
**included refactoring of local tasks to AbstractRepositoryTask (P1)
 
**For RC0, add progress monitor to all api methods that involve IO to easy future implementation.
 
* Steffen to open new bug for alternate containment representations (outline, task editor can be used to reveal)  duplicates for bugzilla could use this
 
* Mik to make new bug for Open Resource bug related to Task Working sets  (defer Eugen's multiple tasklist views patch since will require additional view memento facility?)
 
* Rob: Will investigate breaking out past activity from scheduled mode (after higher priority api changes).
 
* For next call: Committers should review their P1 and P2 tasks and form a realistic list for 2.0
 
 
==== Tuesday, May 15, 10-11am PT ====
 
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
* Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Do we really need two separate APIs for task list and offline storage?
 
** Class hierarchy vs. property-based API
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Actions:
 
* Decisions made regarding offline TaskData handling and presentation merged with wiki ([[Mylar Offline Refactoring]]).
 
 
==== Tuesday, May 8, 10-11am PT ====
 
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
** Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Actions:
 
* Additive improvements deferred in favor of API changes.
 
Main API changes (P2):
 
* Local task become repository tasks
 
* Hits become Tasks (but retain UI representation)
 
* Offline storage improvements  ([[Mylar Offline Refactoring]])
 
* Tasklist externalization
 
* AbstractRepositoryTaskEditor (make protected methods private)
 
* Multiple Task Downloads (synch api changes)
 
* Context listeners api (Mik)
 
* Extract repository configuration
 
 
 
==== Tuesday, May 1, 10-11am PT ====
 
 
* Eclipse Forum Europe report (Mik)
 
* New Task List layout (Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* Monitor update (Meghan)
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
* Post action items/summary/minutes after each meeting (Mik?)
 
 
Actions:
 
* Eugene
 
** send screenshot example of strikethrough looking like row lines
 
* Mik
 
** consider moving activation to task icon
 
** working sets in tasklist needs priority since we need to put miles on it before release
 
* Rob
 
** persistence api should be finalized so that we can drop in alternate back ends
 
 
==== Tuesday, April 24, 10-11am PT ====
 
 
* Post action items/summary/minutes after each meeting
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Minutes:
 
* Greg Wilson gave brief overview of planned work for SoC project
 
* Discussed options for implementing offline storage for task data
 
* Discussed use cases for RSS support in the Task List
 
* Discussed tagging and working sets support in the Task List
 
 
Actions:
 
 
* Does it make sense to keep task data separate from the task list?
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165880 165880: Listeners API should allow to pass multiple events in one call] Potential source of refresh issues (Eugene)
 
 
==== Tuesday, April 17, 10-11am PT ====
 
 
* Google Summer of Code planning (Mik)
 
* ROME depency accepted (Eugene, Mik)
 
* Usage monitor status (Meghan)
 
* Tagging and nesting task list elements UI discussion (Mik)
 
** Contributing custom models to task list and task repositories views. per-milestone/version grouping, or grouping query results by certain attributes (Eugene)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* 2.0M3 API updates (Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* Post action items/summary after each meeting
 
 
==== Tuesday, April 10, 10-11am PT ====
 
 
* Usage monitor status (Meghan)
 
* Tagging and nesting task list elements UI discussion (Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* 2.0M3 API changes (Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=179873 179873: Completed status not correct for JIRA tasks]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
==== Tuesday, April 3, 10-11am PT ====
 
 
* Mylar 2.0M2 release wrap-up, 2.0M3 planning (Mik)
 
* Offline storage strategy design discussion(Rob, Steffen)
 
 
==== Tuesday, March 27, 10-11am PT ====
 
 
Planning meetings are open to all interested.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
 
* Mylar 2.0M2 status
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=176513 176513] [api] Multiple task data request (Rob)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 160389] [api] Serialization / loss of data etc (Rob)
 
* JIRA statuses: resolved vs. closed
 
 
==== Tuesday, March 20, 10-11am PT ====
 
 
* [http://wiki.eclipse.org/index.php/Mylar_GSoC_2007 Goolge Summer of Code ideas] (Mik)
 
* Eclipse 3.3M6 status (Mik)
 
* JIRA network utilization ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=175407 175407])
 
* JIRA test server
 
* usage reporting (Meghan)
 
 
==== Tuesday, March 13, 10-11am PT ====
 
 
Agenda:
 
* EclipseCon decompression (Mik)
 
* JIRA test server (Steffen)
 
* 2.0M2 planning
 
* AttributeFactoryUI/RepositoryConfiguration (Rob, Steffen)
 
 
==== Tuesday, February 27, 10-11am PT ====
 
 
Agenda:
 
* '-' issue - [https://bugs.eclipse.org/bugs/show_bug.cgi?id=166174 bug 166174]
 
* EclipseCon planning (Mik)
 
** 3.2 dev build
 
** Stickers/Buttons/T-shirts
 
** Poster
 
* In-place context view (Mik, Eugene)
 
* GSoC 2007 project (Steffen)
 
 
Actions:
 
* Find Mylar film glasses (Steffen)
 
* Find out if there is any space left for poster presentations (Rob)
 
* At EclipseCon ask EMF folks about using EMF for repository mappings (Mik & Rob)
 
 
==== Tuesday, February 20, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
* 2.0M1 release review (Mik)
 
* Id vs handle vs key (Mik)
 
* How to make Query creation more obvious for new users (Eugene)
 
* Showing Task ID/Keys in UI (task list and task dialogs, editor tabs and headers, task history dropdown, change sets) (Eugene)
 
* JIRA issues (Eugene, Steffen)
 
 
Actions:
 
* File form header bug
 
* Create method: TaskList.getTask(String connectorKind, String taskUrl)
 
* Create AbstractRepositoryTask.getKey()
 
 
==== Tuesday, February 13, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
* IP submission follow-ups for Lucene 2.0, Axis2 (Mik)
 
* Major connector externalizer and task handle usage refactoring (Mik)
 
* JIRA issues
 
* Make Steffen JIRA committer
 
* Discuss refactoring of RepositoryTaskAttributes (bug 150680?) (Steffen)
 
** Separate UI representation from attribute?
 
** How to link attributes to repository configuration?
 
 
==== Tuesday, February 6, 10-11am PT ====
 
 
Agenda
 
* Finalizing of Mylar 2.0 plan (Mik)
 
* Status of IP submissions (Mik)
 
* Orbit dependencies
 
* Status of JIRA
 
* Issues with handles (Eugene)
 
* Issues with event notification api (Rob)
 
 
==== Tuesday, January 30, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning (Mik)
 
* Moving to Eclipse 3.3M5 builds (Mik)
 
* Final IP and contribution submissions for Europa (Mik)
 
* Status Jira Core Services and library dependencies (Steffen)
 
 
==== Tuesday, January 23, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning (Mik)
 
* Implementation strategy for
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=171081 171081]: Autodetect JIRA repository for Open Corresponding Task (Eugene)
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=159135 159135]: Automatic resolution of links between projects and issue repositories (Eugene)
 
* Additional contributions to be made by the Jan. 31st Europa cutoff (Mik)
 
Actions
 
* Consider Lucene 2.0 IPZilla submission (Mik)
 
 
==== Tuesday, January 16, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning
 
* Tomcat and server setup for mylar.eclipse.org
 
* TaskId vs TaskHandle (numerous issues with JIRA connector) [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170587 bug 170587]
 
* Models and their application to the tasklist (Rob, Eugene) ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147084 147084: merge Task List and Task Activity views])
 
** "[use] models and provide model that would show unread/changed/conflicting tasks" ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=170606 170606: Add action to Task List to filter out read requests])
 
** 153573: add support for nesting top level task list elements, e.g. via incorporating working sets
 
* Task web browser
 
Actions:
 
* Add milestone buckets 2.0M1 through M3 (Mik)
 
* Gets JIRA enterprise license key for test server (Mik)
 
* Ask about server backup policy (2.6 Gigs used), disk space for usage data (Mik)
 
* Consider downgrading Tomcat to 5.5 (Meghan)
 
* Write up Mylar monitor data collection project (Meghan)
 
* Plans hyperlink detection improvements and bugs (Rob)
 
**170679: [api] improve hyperlink detection api
 
**170681: [api] allow connectors to contribute alternate content providers (models) to tasklist
 
**170685: [api] allow connectors to contribute filters to tasklist
 
 
==== Tuesday, Januray 9, 10-11am PT ====
 
 
Agenda:
 
* Mylar 2.0 milestone and Europa planning.
 
* Synchronization, progress indication, and cancellation of repository task operations ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168257 168257], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=150682 150682], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=154258 154258], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=143011 143011])
 
* Mylar error handling ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168049 168049], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=168672 168672], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165383 165383])
 
* Task activity timing improvement ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147537 147537])
 
* JIRA issues (auth problem and integrating JIRA client)
 
Actions:
 
* Write up error policy (Steffen)
 
* Plan synchronization related bugs (Rob)
 
* Find platform release dates (Mik)
 
* Define scope of project on planning page (Mik)
 
* Add dummy query on codehouse project (Mik)
 
 
==== Tuesday, December 19, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* 1.0.1 priorities (Mik)
 
* Slap Eugene for discrediting Mylar in blogs and Mik for not blogging
 
* Layout of search/query page
 
 
==== Tuesday, December 12, 10-10:30am PT ====
 
* Mylar 1.0 celebration and retrospective.
 
* Brock Janiczak's JIRA core services contribution (Eugene, Mik?).
 
* Discovery update sites (Eugene, Mik).
 
* Version numbers (Mik).
 
 
==== Tuesday, December 5, 10-10:30am PT ====
 
* Remaining priorities for 1.0 (Mik)
 
* API status (Mik)
 
** Externalizers ITaskListExternalize
 
** Listeners API, primarily ITaskListChangeListener
 
** Adapting to ITask and broken selection of the task respositories
 
* Proxy settings status (Rob)
 
* Subclipse integration and Team API (Eugene)
 
 
 
==== Tuesday, November 21, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
* Remaining 1.0RC1 items (Mik)
 
** Issues with tack context (multiple folders, unfiltering issues, etc)
 
** Issues with new local task UI (focus, inline vs. editor)
 
** Moving task drop down and pause button out of Task List UI?
 
* Bugzilla and repository infrastructure status (Rob)
 
* Trac status (Steffen)
 
* Web connector status (Mik)
 
* JIRA connnector status (Mik & Eugene)
 
Actions
 
* Mik emails newsgroup/mylar-dev about task list toolbar changes
 
* Mik fixes classpath of context.core xmlrpc-use
 
* Visible editor always unfiltered
 
* Eugene files bug on editor color problem
 
* Steffen files bug People section with JIRA
 
 
==== Tuesday, November 14, 10-11am PT ====
 
 
Agenda
 
* Mylar 1.0 priorities.
 
* Pause button UI (Mik?)
 
Actions
 
* Need people section for Trac
 
* Discuss removing commit context button on newsgroup
 
* Allow proxy settings to be specified per-repository
 
 
==== Tuesday, October 31, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 
* Authentication infrastructure and connectors (Rob)
 
* Offline support for JIRA (Mik)
 
* Pause button UI (Mik)
 
 
 
==== Tuesday, October 24, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
Agenda
 
* 0.8 post-mortem (Mik)
 
* Storage of offline task data (See [[Mylar Task List]]) (Rob)
 
* JIRA priorities (Mik)
 
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 
* [http://dev.eclipse.org/mhonarc/lists/mylar-dev/msg00706.html Alternative integration] with remote repositories (Eugene)
 
 
Actions
 
* Investigate Lucene as store for offline task data (Rob)
 
* Investigate showing working sets as top-level nodes in Task List (Mik)
 
 
==== Tuesday, October 17, 10-11am PT ====
 
 
Agenda
 
* 0.8 release planning
 
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
 
* Rich editor for Trac (Steffen?)
 
* Repository task data (Rob)
 
** Offline persistence: object serialization (current), xml, database [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 bug 160389]
 
** Lazy loading [https://bugs.eclipse.org/bugs/show_bug.cgi?id=157257 bug 157257]
 
* Issues with Task monitoring and filtering for projects with more then one source folder
 
* Jira integration planning
 
* User guide and improving the docs
 
 
Actions
 
* Need "Add to Task List" action on query hits
 
* Consider merging the above action with dialog for "Add Existing Task..."
 
* Need to consider pre-fetching task data for query hits
 
 
==== Tuesday, September 26 2006, 10-11am PT ====
 
* 0.7 release planning
 
* Project and repository association (Rob)
 
* 1.0 planning (Mik)
 
 
==== Wednesday, August 23 2006, 10-11am PT ====
 
* Planning for 0.6.2
 
* Generic web Repository Connector integration (Eugene)
 
* Trac Connector rich editor (Steffen)
 
* AbstractRepositoryConnector split into core and UI
 
* Planning for 0.7 and 1.0
 
* Zest website integration and release cycles
 
 
==== Wednesday, August 2 2006, 10-11am PT ====
 
Agenda
 
* 0.6.1 post-mortem
 
* 0.6.2 and 1.0 planning
 
* Summer of Code status
 
** Trac Connector (Steffen)
 
** Bugzilla enhancements (Jeff)
 
** JIRA
 
* Design discussion on splitting AbstractRepositoryConnector into core/ui
 
* Sandbox release for web connector (Eugene)
 
Vacations
 
* Rob: 3rd - 8th
 
* Mik: 8th - 17th
 
Actions
 
* Consumers of APIs update Javadocs as they use them, a la wiki
 
* Decide on conference call time and interval next meeting
 
* Investigate Rome dependency for Sandbox (Mik)
 
 
==== Thursday, July 6 2006, 10am PT ====
 
* wrap up discussion of 0.6 release
 
* Trac integration status (Steffen)
 
* enhancing Bugzilla connector status (Jeff)
 
* Connector naming conventions
 
* tasks API discussion. String-based task id, separate task id, url and repository url, (issues 146396, 149624, 149509), other refactoring of tasks, hits, query and repository classes
 
* UI for repository settings
 
* prioritizing for 0.7 and beyond
 
* planning and use of Bugzilla priorities
 
 
==== Tuesday, June 13 2006, 10am PT ====
 
* Schedule a regular meeting time and interval
 
* Google SoC: Trac integration (Steffen)
 
* Google Soc: enhancing Bugzilla connector (Jeff)
 
* Repository connector API discussion (Mik)
 
* Prioritize tasks for 0.6 (Mik)
 

Revision as of 00:46, 3 October 2007

Tel: 1-866-362-7064 or 1-613-287-8000, Passcode: 892048#

Meeting Archives

Pending Discussion Items

  • bug 203399 standardize hyperlinking strategy for the Task Editor (Eugene)
  • Active task and working set presentation/switching when Task List is not visible
  • Design discussion: queries, categories, groupings and recommended settings bug 175318 (Mik)
  • Visualization of entries that don't match queries bug 201157 (Eugene)
  • Arbitrary attributes discussion bug 199818
  • Design discussion - bugzilla cached configuration (Rob)
  • Summary bug view / quick viewing of bug reports design discussion
  • Trajectory and best home for org.eclipse.mylyn.trac.wiki (Mik, Steffen)

Next Meeting

Planning meetings are open to all interested. When adding an item to the agenda please include your name.

Tuesday, October 9, 10-11am PT

Agenda:

  • ...

Minutes:


Past Meetings

Tuesday, October 2, 10-11am PT

Agenda:

  • 2.1 release review (Mik)
  • Eclipse.org bandwidth usage bug 196056 bug 205213 (Rob)
  • XPlanner update (Helen)
  • 3.0 plan review and bug triage (all)
  • Mylyn connector for mingle (Ketan)

Minutes:


Tuesday, September 25, 10-11am PT

Agenda:

  • Mylyn 2.1, Europa Fall Update and Ganymede status and review of remaining items (Mik)
  • Update sites, linking and download redesign (Mik) bug 194469
  • Sandbox quality bar and policy for inclusion of features for discoverable sites in Europa Fall Update (Mik) bug 204560
  • Subtasks being enabled by default for Bugzilla and corresponding policies (Rob, Mik, Eugene)
    • artificial "grouping" vs. showing subtasks
  • JIRA update (Steffen)
  • XPlanner update (Helen)

Minutes:

  • Update site should include historical builds as part of archive
  • Subtask setting to be renamed

Tuesday, September 18, 10-11am PT

Agenda:

  • Policy for adding stuff to the Sandbox, i.e. group by scheduled vs. "out of nowhere" "Incoming (Experimental)" presentation (Eugene)
  • Review of all bugs scheduled for Mylyn 2.1 (all)
  • 3.0 planning (Mik)
  • bug 203399 standardize hyperlinking strategy for the Task Editor (Eugene)

Minutes:


Tuesday, September 11, 10-11am PT

Agenda:

  • Review of all bugs scheduled for Mylyn 2.1 (all)
  • Policy for making significant changes to open bugs' status, e.g. marking for bugday (Mik)
  • 3.0 planning (Mik)
  • Design discussion: queries, categories, groupings and recommended settings bug 175318 (Mik)
  • Visualization of entries that don't match queries bug 201157 (Eugene)
  • Arbitrary attributes discussion bug 199818
  • Summary bug view / quick viewing of bug reports design discussion
  • Design discussion - bugzilla cached configuration

Minutes:



Tuesday, September 4, 10-11am PT

Agenda:

  • Missed BugDay
  • Summer of Code wrap-up (Jevgeni, Xiaoyang, Balazs)
  • Policy:
    • Resolving bug reports (Rob)
    • Reopening closed reports, i.e. AllTasks fails (Eugene)
  • Design discussion - bugzilla cached configuration
  • 2.1 and 3.0 Planning (Mik)
  • Arbitrary attributes discussion bug 199818
  • Visualization of entries that don't match queries bug 201157 (Eugene)

Minutes:

  • Bug Day
    • We will participate in Bug Day
    • Need to continute to maintain/label bug day bugs
    • Must maintain calendar of bug day events and send announcemnts to newsgroup/mailing lists
    • Eugne willing to mentor on bug days
  • Policy
    • Contributions (patches) must be accompanied with summary of issues addressed by provided patch. Must also indicate if patch is intended to resolve bug report or further work required. (Rob will update Contributor Reference)
    • Reopening closed reports not encouraged. Mik will resolve bug#152869 - creating bugs from failed unit tests for 2.1
  • Builds
    • RC builds, dev builds as weekly milestone builds (Mik to send proposal to newsgroup to get feedback from community on this proposed change)

Back to the top