Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Meetings"

 
(967 intermediate revisions by 33 users not shown)
Line 1: Line 1:
[[Category:Mylar]]
+
[[Category:Mylyn]]
Tel: '''1-866-362-7064''' or 1-613-287-8000, Passcode: '''892048#'''
+
  
=== Next Meeting ===
+
= Connection Information =
  
Planning meetings are open to all interested.  When adding an item to the agenda please include your name.
+
Participant conference extension: '''708''', then enter pin '''97898'''. {{Asterisk/Numbers}}
  
==== Tuesday, June 19, 10-11am PT ====
+
SIP clients can call '''708@asterisk.eclipse.org''', then enter pin '''97898'''. [http://wiki.eclipse.org/Asterisk More information].
  
* Summer of code update (students)
+
== Screen Sharing ==
  
Future:
+
We use '''[https://global.gotomeeting.com/join/725855957 Goto Meeting (ID 725855957)]''' for screen sharing when needed (on demand only).
* Streamline UI for basic RSS support (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* vserver admin status report
+
  
----
+
= Meeting Schedule =
  
=== Past Meetings ===
+
Planning meetings are open to all interested and are '''held on an as-needed basis.''' Anyone interested in doing work related to the Mylyn project is invited to schedule a meeting if they have something they want to discuss. If you would like to meet, please send an email to [mailto:mylyn-dev@eclipse.org mylyn-dev@eclipse.org] to schedule a meeting, mentioning what you want to meet about and what dates and times you are available. Typical agenda items include planning for the next release, demos of work in progress, discussion of implementation ideas for new features, etc.
  
 +
= Ongoing Items =
  
==== Tuesday, June 12, 10-11am PT ====
+
==== Planning ====
  
* Project Rename Status (Mik)
+
[http://www.eclipse.org/projects/project-plan.php?projectid=mylyn Project Plan]
* Summer of code update (students)
+
* 2.0 RC1 release status (Mik)
+
** Release of JIRA connector?
+
* Error handling design (Mik, Rob, Steffen)
+
* Fixes for the synchronization API ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 #191575])
+
* Notification of API changes (Steffen)
+
  
Actions:
+
* [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced;short_desc=%5Btheme%5D;short_desc_type=allwordssubstr;classification=Mylyn Theme Bugs]
* Mik to investigate options for disabling old mylar plugins (required for tonight's dev build)
+
* [https://bugs.eclipse.org/bugs/buglist.cgi?keywords=plan;keywords_type=allwords;short_desc=%5C%5Btheme%5C%5D;classification=Mylyn;query_format=advanced;bug_status=UNCONFIRMED;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;short_desc_type=notregexp;target_milestone=--- Plan Bugs]
* Eugene to take quick pass at synchronization api changes tonight [[https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 bug#191575]]
+
* [https://bugs.eclipse.org/bugs/buglist.cgi?keywords=plan;query_format=advanced;keywords_type=allwords;short_desc=%5C%5Btheme%5C%5D;field0-0-0=target_milestone;bug_status=UNCONFIRMED;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;short_desc_type=notregexp;type0-0-0=notsubstring;value0-0-0=---;classification=Mylyn Scheduled Plan Bugs]
----
+
* [https://bugs.eclipse.org/bugs/buglist.cgi?priority=P1;priority=P2;query_format=advanced;bug_severity=blocker;bug_severity=critical;bug_severity=major;bug_status=UNCONFIRMED;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;type0-0-0=notsubstring;value0-0-0=---;classification=Mylyn High Priority Defects]
  
  
 +
= Past Meetings =
  
==== Tuesday, June 5, 10-11am PT ====
+
==== September 10, 8-9am PT ====
  
* Google Summer of Code kick-off (Balazs, Jevgeni, Xiaoyang)
+
* Ongoing Agenda Items
* vserver admin practices (Rob, Steffen)
+
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
* 2.0 end game planning
+
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
** Committers 2.0 plan update
+
* Task Repository in offline mode (Mik)
+
* New Task List layout (Mik)
+
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
+
<i>Stale items</i>
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
  
Actions:
+
==== August 13, 8-9am PT ====
* Rob to administer vserver (corrdinate with Steffen)
+
** Contact Denis regarding updates
+
** Investigate backup options
+
  
==== Tuesday, May 29, 10-11am PT ====
+
* Ongoing Agenda Items
 +
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
 +
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
  
* 2.0 end game planning
+
==== July 9, 8-9am PT ====
* Task Repository in offline mode (Mik)
+
* New Task List layout (Mik)
+
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
+
** Task vs. TaskData; properties vs. class hierarchy (Eugene)
+
** Full vs. light synchronization (Eugene)
+
<i>Stale items</i>
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
  
Minutes:
+
* Ongoing Agenda Items
* (Eugene) Proposed eliminating Task hierarchy and replace with property based access
+
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
** Suggests merging Task and AbstractRepositoryTask
+
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
** Willing to add property support to ITask for 2.1 if requested by integrators.
+
* (Steffen) The property-based vs. sub-classing discussing is important and we need to consider this for 3.0 again.  
+
* (Rob) raised TaskData migration and committers agree that migraion of existing offline data not practical
+
  
Actions:
+
==== June 11, 8-9am PT ====
* (Mik) introduce class factories and remove custom task externalizers
+
* replace AbstractQueryHit by Tasks
+
* allow connectors to submit Task or TaskData objects as hits
+
* convert offline storage from Java Serialization to XML
+
* construct attribute editors through factory, do not store repository configuration in offline storage
+
* apply pending rename changes from porting guide
+
* refactor attachment API
+
  
 +
* Ongoing Agenda Items
 +
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
 +
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
  
 +
==== May 14, 8-9am PT ====
  
==== Tuesday, May 22, 10-11am PT ====
+
* Ongoing Agenda Items
 +
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
 +
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
  
* 2.0 end game planning
+
==== April 9, 8-9am PT ====
* New Task List layout (Mik)
+
* Monitor update (Meghan)
+
* Server memory troubles (Steffen)
+
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
+
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
+
** Do we really need two separate APIs for task list and offline storage?
+
** Class hierarchy vs. property-based API
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* Mylar demo at JavaOne (Eugene, Mik)
+
* Top voted bug: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=169123 169123]: Updated bug does not preserve values of custom fields in Jira (Steffen)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
+
  
Minutes:
+
* Ongoing Agenda Items
* Task workflow and special query support likely getting bumped
+
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
* Rob: related bug#185805 (timestamp bug) and bug#186939 (blocked jobs)
+
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [https://projects.eclipse.org/projects/technology.hudson/documentation Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
* Steffen: httpclient message.shutdown() can be used to force shutdown of network IO
+
  
Actions:
+
==== March 12, 8-9am PT ====
* Rob and Steffen:
+
**to start offline refactoring.
+
**included refactoring of local tasks to AbstractRepositoryTask (P1)
+
**For RC0, add progress monitor to all api methods that involve IO to easy future implementation.
+
* Steffen to open new bug for alternate containment representations (outline, task editor can be used to reveal)  duplicates for bugzilla could use this
+
* Mik to make new bug for Open Resource bug related to Task Working sets  (defer Eugen's multiple tasklist views patch since will require additional view memento facility?)
+
* Rob: Will investigate breaking out past activity from scheduled mode (after higher priority api changes).
+
* For next call: Committers should review their P1 and P2 tasks and form a realistic list for 2.0
+
  
==== Tuesday, May 15, 10-11am PT ====
+
* Ongoing Agenda Items
 +
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
 +
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [http://projects.eclipse.org/projects/technology.hudson/releases/next Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
 +
* 3.11 Release Wrap up
 +
** confirm IP log submission
 +
** publishing of RC
  
* New Task List layout (Mik)
+
==== February 12, 8-9am PT ====
* Monitor update (Meghan)
+
* Server memory troubles (Steffen)
+
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
+
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
+
** Do we really need two separate APIs for task list and offline storage?
+
** Class hierarchy vs. property-based API
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* Mylar demo at JavaOne (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
+
  
Actions:
+
* Ongoing Agenda Items
* Decisions made regarding offline TaskData handling and presentation merged with wiki ([[Mylar Offline Refactoring]]).
+
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
 +
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [http://projects.eclipse.org/projects/technology.hudson/releases/next Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=427190 YouTrack connector] UI review
  
==== Tuesday, May 8, 10-11am PT ====
+
==== January 8, 8-9am PT ====
  
* New Task List layout (Mik)
+
'''This meeting was cancelled because the audio conference system was not working'''
* Monitor update (Meghan)
+
** Server memory troubles (Steffen)
+
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
+
* Offline storage strategy design discussion (Rob, Steffen)
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* Mylar demo at JavaOne (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
+
  
Actions:
+
* Ongoing Agenda Items
* Additive improvements deferred in favor of API changes.
+
** Project updates: Builds, Commons, Context [MFT], Docs, Reviews [R4E], Tasks, Versions
Main API changes (P2):
+
** Repository check: [http://www.bugzilla.org Bugzilla], [http://trac.edgewall.org/roadmap Trac], [http://projects.eclipse.org/projects/technology.hudson/releases/next Hudson], [http://jenkins-ci.org/changelog-stable Jenkins], [http://gerrit-releases.storage.googleapis.com/index.html Gerrit]
* Local task become repository tasks
+
* Mylyn 3.11 Release Date
* Hits become Tasks (but retain UI representation)
+
* Offline storage improvements  ([[Mylar Offline Refactoring]])
+
* Tasklist externalization
+
* AbstractRepositoryTaskEditor (make protected methods private)
+
* Multiple Task Downloads (synch api changes)
+
* Context listeners api (Mik)
+
* Extract repository configuration
+
  
 +
=== Archive ===
  
==== Tuesday, May 1, 10-11am PT ====
+
  [[Mylyn/Meetings/2013|2013 Meetings]], [[Mylyn/Meetings/2012|2012 Meetings]], [[Mylyn/Meetings/2011|2011 Meetings]], [[Mylyn/Meetings/2010|2010 Meetings]], [[Mylyn/Meetings/2009|2009 Meetings]], [[Mylyn/Meetings/2008|2008 Meetings]], [[Mylyn/Meetings/2007|2007 Meetings]], [[Mylyn/Meetings/2006|2006 Meetings]]
 
+
* Eclipse Forum Europe report (Mik)
+
* New Task List layout (Mik)
+
* Offline storage strategy design discussion (Rob, Steffen)
+
* Monitor update (Meghan)
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* Mylar demo at JavaOne (Eugene, Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
+
* Post action items/summary/minutes after each meeting (Mik?)
+
 
+
Actions:
+
* Eugene
+
** send screenshot example of strikethrough looking like row lines
+
* Mik
+
** consider moving activation to task icon
+
** working sets in tasklist needs priority since we need to put miles on it before release
+
* Rob
+
** persistence api should be finalized so that we can drop in alternate back ends
+
 
+
==== Tuesday, April 24, 10-11am PT ====
+
 
+
* Post action items/summary/minutes after each meeting
+
* Streamline UI for basic RSS support (Eugene, Mik)
+
* Offline storage strategy design discussion (Rob, Steffen)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
 
+
Minutes:
+
* Greg Wilson gave brief overview of planned work for SoC project
+
* Discussed options for implementing offline storage for task data
+
* Discussed use cases for RSS support in the Task List
+
* Discussed tagging and working sets support in the Task List
+
 
+
Actions:
+
 
+
* Does it make sense to keep task data separate from the task list?
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165880 165880: Listeners API should allow to pass multiple events in one call] Potential source of refresh issues (Eugene)
+
 
+
==== Tuesday, April 17, 10-11am PT ====
+
 
+
* Google Summer of Code planning (Mik)
+
* ROME depency accepted (Eugene, Mik)
+
* Usage monitor status (Meghan)
+
* Tagging and nesting task list elements UI discussion (Mik)
+
** Contributing custom models to task list and task repositories views. per-milestone/version grouping, or grouping query results by certain attributes (Eugene)
+
* Offline storage strategy design discussion (Rob, Steffen)
+
* 2.0M3 API updates (Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
* Post action items/summary after each meeting
+
 
+
==== Tuesday, April 10, 10-11am PT ====
+
 
+
* Usage monitor status (Meghan)
+
* Tagging and nesting task list elements UI discussion (Mik)
+
* Offline storage strategy design discussion (Rob, Steffen)
+
* 2.0M3 API changes (Mik)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=179873 179873: Completed status not correct for JIRA tasks]
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
+
 
+
==== Tuesday, April 3, 10-11am PT ====
+
 
+
* Mylar 2.0M2 release wrap-up, 2.0M3 planning (Mik)
+
* Offline storage strategy design discussion(Rob, Steffen)
+
 
+
==== Tuesday, March 27, 10-11am PT ====
+
 
+
Planning meetings are open to all interested. When adding an item to the agenda please include your name.
+
 
+
Agenda:
+
 
+
* Mylar 2.0M2 status
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=176513 176513] [api] Multiple task data request (Rob)
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 160389] [api] Serialization / loss of data etc (Rob)
+
* JIRA statuses: resolved vs. closed
+
 
+
==== Tuesday, March 20, 10-11am PT ====
+
 
+
* [http://wiki.eclipse.org/index.php/Mylar_GSoC_2007 Goolge Summer of Code ideas] (Mik)
+
* Eclipse 3.3M6 status (Mik)
+
* JIRA network utilization ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=175407 175407])
+
* JIRA test server
+
* usage reporting (Meghan)
+
 
+
==== Tuesday, March 13, 10-11am PT ====
+
 
+
Agenda:
+
* EclipseCon decompression (Mik)
+
* JIRA test server (Steffen)
+
* 2.0M2 planning
+
* AttributeFactoryUI/RepositoryConfiguration (Rob, Steffen)
+
 
+
==== Tuesday, February 27, 10-11am PT ====
+
 
+
Agenda:
+
* '-' issue - [https://bugs.eclipse.org/bugs/show_bug.cgi?id=166174 bug 166174]
+
* EclipseCon planning (Mik)
+
** 3.2 dev build
+
** Stickers/Buttons/T-shirts
+
** Poster
+
* In-place context view (Mik, Eugene)
+
* GSoC 2007 project (Steffen)
+
 
+
Actions:
+
* Find Mylar film glasses (Steffen)
+
* Find out if there is any space left for poster presentations (Rob)
+
* At EclipseCon ask EMF folks about using EMF for repository mappings (Mik & Rob)
+
 
+
==== Tuesday, February 20, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
 
+
Agenda:
+
* 2.0M1 release review (Mik)
+
* Id vs handle vs key (Mik)
+
* How to make Query creation more obvious for new users (Eugene)
+
* Showing Task ID/Keys in UI (task list and task dialogs, editor tabs and headers, task history dropdown, change sets) (Eugene)
+
* JIRA issues (Eugene, Steffen)
+
 
+
Actions:
+
* File form header bug
+
* Create method: TaskList.getTask(String connectorKind, String taskUrl)
+
* Create AbstractRepositoryTask.getKey()
+
 
+
==== Tuesday, February 13, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
 
+
Agenda:
+
* IP submission follow-ups for Lucene 2.0, Axis2 (Mik)
+
* Major connector externalizer and task handle usage refactoring (Mik)
+
* JIRA issues
+
* Make Steffen JIRA committer
+
* Discuss refactoring of RepositoryTaskAttributes (bug 150680?) (Steffen)
+
** Separate UI representation from attribute?
+
** How to link attributes to repository configuration?
+
 
+
==== Tuesday, February 6, 10-11am PT ====
+
 
+
Agenda
+
* Finalizing of Mylar 2.0 plan (Mik)
+
* Status of IP submissions (Mik)
+
* Orbit dependencies
+
* Status of JIRA
+
* Issues with handles (Eugene)
+
* Issues with event notification api (Rob)
+
 
+
==== Tuesday, January 30, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
* Mylar 2.0 planning (Mik)
+
* Moving to Eclipse 3.3M5 builds (Mik)
+
* Final IP and contribution submissions for Europa (Mik)
+
* Status Jira Core Services and library dependencies (Steffen)
+
 
+
==== Tuesday, January 23, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
* Mylar 2.0 planning (Mik)
+
* Implementation strategy for
+
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=171081 171081]: Autodetect JIRA repository for Open Corresponding Task (Eugene)
+
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=159135 159135]: Automatic resolution of links between projects and issue repositories (Eugene)
+
* Additional contributions to be made by the Jan. 31st Europa cutoff (Mik)
+
Actions
+
* Consider Lucene 2.0 IPZilla submission (Mik)
+
 
+
==== Tuesday, January 16, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
* Mylar 2.0 planning
+
* Tomcat and server setup for mylar.eclipse.org
+
* TaskId vs TaskHandle (numerous issues with JIRA connector) [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170587 bug 170587]
+
* Models and their application to the tasklist (Rob, Eugene) ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147084 147084: merge Task List and Task Activity views])
+
** "[use] models and provide model that would show unread/changed/conflicting tasks" ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=170606 170606: Add action to Task List to filter out read requests])
+
** 153573: add support for nesting top level task list elements, e.g. via incorporating working sets
+
* Task web browser
+
Actions:
+
* Add milestone buckets 2.0M1 through M3 (Mik)
+
* Gets JIRA enterprise license key for test server (Mik)
+
* Ask about server backup policy (2.6 Gigs used), disk space for usage data (Mik)
+
* Consider downgrading Tomcat to 5.5 (Meghan)
+
* Write up Mylar monitor data collection project (Meghan)
+
* Plans hyperlink detection improvements and bugs (Rob)
+
**170679: [api] improve hyperlink detection api
+
**170681: [api] allow connectors to contribute alternate content providers (models) to tasklist
+
**170685: [api] allow connectors to contribute filters to tasklist
+
 
+
==== Tuesday, Januray 9, 10-11am PT ====
+
 
+
Agenda:
+
* Mylar 2.0 milestone and Europa planning.
+
* Synchronization, progress indication, and cancellation of repository task operations ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168257 168257], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=150682 150682], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=154258 154258], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=143011 143011])
+
* Mylar error handling ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168049 168049], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=168672 168672], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165383 165383])
+
* Task activity timing improvement ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147537 147537])
+
* JIRA issues (auth problem and integrating JIRA client)
+
Actions:
+
* Write up error policy (Steffen)
+
* Plan synchronization related bugs (Rob)
+
* Find platform release dates (Mik)
+
* Define scope of project on planning page (Mik)
+
* Add dummy query on codehouse project (Mik)
+
 
+
==== Tuesday, December 19, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
* 1.0.1 priorities (Mik)
+
* Slap Eugene for discrediting Mylar in blogs and Mik for not blogging
+
* Layout of search/query page
+
 
+
==== Tuesday, December 12, 10-10:30am PT ====
+
* Mylar 1.0 celebration and retrospective.
+
* Brock Janiczak's JIRA core services contribution (Eugene, Mik?).
+
* Discovery update sites (Eugene, Mik).
+
* Version numbers (Mik).
+
 
+
==== Tuesday, December 5, 10-10:30am PT ====
+
* Remaining priorities for 1.0 (Mik)
+
* API status (Mik)
+
** Externalizers ITaskListExternalize
+
** Listeners API, primarily ITaskListChangeListener
+
** Adapting to ITask and broken selection of the task respositories
+
* Proxy settings status (Rob)
+
* Subclipse integration and Team API (Eugene)
+
 
+
 
+
==== Tuesday, November 21, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
 
+
* Remaining 1.0RC1 items (Mik)
+
** Issues with tack context (multiple folders, unfiltering issues, etc)
+
** Issues with new local task UI (focus, inline vs. editor)
+
** Moving task drop down and pause button out of Task List UI?
+
* Bugzilla and repository infrastructure status (Rob)
+
* Trac status (Steffen)
+
* Web connector status (Mik)
+
* JIRA connnector status (Mik & Eugene)
+
Actions
+
* Mik emails newsgroup/mylar-dev about task list toolbar changes
+
* Mik fixes classpath of context.core xmlrpc-use
+
* Visible editor always unfiltered
+
* Eugene files bug on editor color problem
+
* Steffen files bug People section with JIRA
+
 
+
==== Tuesday, November 14, 10-11am PT ====
+
 
+
Agenda
+
* Mylar 1.0 priorities.
+
* Pause button UI (Mik?)
+
Actions
+
* Need people section for Trac
+
* Discuss removing commit context button on newsgroup
+
* Allow proxy settings to be specified per-repository
+
 
+
==== Tuesday, October 31, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
 
+
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
+
* Authentication infrastructure and connectors (Rob)
+
* Offline support for JIRA (Mik)
+
* Pause button UI (Mik)
+
 
+
 
+
==== Tuesday, October 24, 10-11am PT ====
+
 
+
Planning meetings are open to all.  When adding an item to the agenda please include your name.
+
 
+
Agenda
+
* 0.8 post-mortem (Mik)
+
* Storage of offline task data (See [[Mylar Task List]]) (Rob)
+
* JIRA priorities (Mik)
+
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
+
* [http://dev.eclipse.org/mhonarc/lists/mylar-dev/msg00706.html Alternative integration] with remote repositories (Eugene)
+
 
+
Actions
+
* Investigate Lucene as store for offline task data (Rob)
+
* Investigate showing working sets as top-level nodes in Task List (Mik)
+
 
+
==== Tuesday, October 17, 10-11am PT ====
+
 
+
Agenda
+
* 0.8 release planning
+
* Web repository connector UI , [https://bugs.eclipse.org/bugs/show_bug.cgi?id=158069 bug 158069] (Eugene)
+
* Rich editor for Trac (Steffen?)
+
* Repository task data (Rob)
+
** Offline persistence: object serialization (current), xml, database [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 bug 160389]
+
** Lazy loading [https://bugs.eclipse.org/bugs/show_bug.cgi?id=157257 bug 157257]
+
* Issues with Task monitoring and filtering for projects with more then one source folder
+
* Jira integration planning
+
* User guide and improving the docs
+
+
Actions
+
* Need "Add to Task List" action on query hits
+
* Consider merging the above action with dialog for "Add Existing Task..."
+
* Need to consider pre-fetching task data for query hits
+
 
+
==== Tuesday, September 26 2006, 10-11am PT ====
+
* 0.7 release planning
+
* Project and repository association (Rob)
+
* 1.0 planning (Mik)
+
 
+
==== Wednesday, August 23 2006, 10-11am PT ====
+
* Planning for 0.6.2
+
* Generic web Repository Connector integration (Eugene)
+
* Trac Connector rich editor (Steffen)
+
* AbstractRepositoryConnector split into core and UI
+
* Planning for 0.7 and 1.0
+
* Zest website integration and release cycles
+
 
+
==== Wednesday, August 2 2006, 10-11am PT ====
+
Agenda
+
* 0.6.1 post-mortem
+
* 0.6.2 and 1.0 planning
+
* Summer of Code status
+
** Trac Connector (Steffen)
+
** Bugzilla enhancements (Jeff)
+
** JIRA
+
* Design discussion on splitting AbstractRepositoryConnector into core/ui
+
* Sandbox release for web connector (Eugene)
+
Vacations
+
* Rob: 3rd - 8th
+
* Mik: 8th - 17th
+
Actions
+
* Consumers of APIs update Javadocs as they use them, a la wiki
+
* Decide on conference call time and interval next meeting
+
* Investigate Rome dependency for Sandbox (Mik)
+
 
+
==== Thursday, July 6 2006, 10am PT ====
+
* wrap up discussion of 0.6 release
+
* Trac integration status (Steffen)
+
* enhancing Bugzilla connector status (Jeff)
+
* Connector naming conventions
+
* tasks API discussion. String-based task id, separate task id, url and repository url, (issues 146396, 149624, 149509), other refactoring of tasks, hits, query and repository classes
+
* UI for repository settings
+
* prioritizing for 0.7 and beyond
+
* planning and use of Bugzilla priorities
+
 
+
==== Tuesday, June 13 2006, 10am PT ====
+
* Schedule a regular meeting time and interval
+
* Google SoC: Trac integration (Steffen)
+
* Google Soc: enhancing Bugzilla connector (Jeff)
+
* Repository connector API discussion (Mik)
+
* Prioritize tasks for 0.6 (Mik)
+

Latest revision as of 19:47, 7 October 2014


Connection Information

Participant conference extension: 708, then enter pin 97898. To access the conference bridge, please dial one of the following numbers:

Phone numbers

  • North America 1-866-569-4992
  • Germany 49-692-2224-6059
  • France 33-(0)-17-070-8535
  • UK 0800-033-7806
  • Switzerland 41-44-580-2115
  • Sweden 46-85-063-8386
  • Italy 003-902-3604-8268

SIP

Asterisk can be used for free from anywhere with a reliable Internet connection. Please see https://wiki.eclipse.org/Asterisk#SIP.

Conference Commands

*1 to mute/unmute yourself
*2 lock/unlock the conference (moderator only)
*3 eject the last person to join (moderator only)
*4 decrease conference volume
*6 increase conference volume
*7 decrease your volume volume
*9 increase your volume volume

*8 exit the conference

SIP clients can call 708@asterisk.eclipse.org, then enter pin 97898. More information.

Screen Sharing

We use Goto Meeting (ID 725855957) for screen sharing when needed (on demand only).

Meeting Schedule

Planning meetings are open to all interested and are held on an as-needed basis. Anyone interested in doing work related to the Mylyn project is invited to schedule a meeting if they have something they want to discuss. If you would like to meet, please send an email to mylyn-dev@eclipse.org to schedule a meeting, mentioning what you want to meet about and what dates and times you are available. Typical agenda items include planning for the next release, demos of work in progress, discussion of implementation ideas for new features, etc.

Ongoing Items

Planning

Project Plan


Past Meetings

September 10, 8-9am PT

  • Ongoing Agenda Items

August 13, 8-9am PT

  • Ongoing Agenda Items

July 9, 8-9am PT

  • Ongoing Agenda Items

June 11, 8-9am PT

  • Ongoing Agenda Items

May 14, 8-9am PT

  • Ongoing Agenda Items

April 9, 8-9am PT

  • Ongoing Agenda Items

March 12, 8-9am PT

  • Ongoing Agenda Items
  • 3.11 Release Wrap up
    • confirm IP log submission
    • publishing of RC

February 12, 8-9am PT

January 8, 8-9am PT

This meeting was cancelled because the audio conference system was not working

  • Ongoing Agenda Items
  • Mylyn 3.11 Release Date

Archive

2013 Meetings, 2012 Meetings, 2011 Meetings, 2010 Meetings, 2009 Meetings, 2008 Meetings, 2007 Meetings, 2006 Meetings

Copyright © Eclipse Foundation, Inc. All Rights Reserved.