Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Incubator/Generic Industrial Connector"

(Generic Task Structure to map to any SQl DB)
(Generic Query Structure to map to any SQL DB)
Line 35: Line 35:
 
There will be a Query window allowing (full text) selection on:
 
There will be a Query window allowing (full text) selection on:
  
- repositoryUrl
+
  - taskId : match a specific ID
  - taskId
+
  - owner : match a known owner from a list
  - owner
+
  - summary : match a string in a description
  - summary
+
  - priority (as P1, P2, P3, P4 or P5) : match one or more priorities
  - priority (as P1, P2, P3, P4 or P5)
+
  - completed : match true or false
  - completed
+
  - completionDate (null is not completed) : match before, after and null
  - completionDate (null is not completed)
+
  - creationDate : match before, after and null
  - creationDate
+
  - dueDate : match before, after and null
  - dueDate
+
  - notes : match a string in a description
  - notes
+
  
 
and possibly:
 
and possibly:

Revision as of 06:36, 13 March 2008

This is a temp doc space for the generic SQL connector for mylyn.

Temporary SVN

svn://bugs.industrial-tsi.com/mylyn_gsc

Members

Maarten Meijer
Wim Jongman

Plan

bug 184532

Generic Task Structure to map to any SQL DB

These are mainly the fields from AbstractTask

- repositoryUrl
- taskId
- owner
- summary
- priority (as P1, P2, P3, P4 or P5)
- completed
- completionDate (null is not completed)
- creationDate
- dueDate
- notes

Further more a generic Task can hold:

- a list of TaskComments and
- a list of TaskAttachments.

But how?

Generic Query Structure to map to any SQL DB

There will be a Query window allowing (full text) selection on:

- taskId : match a specific ID
- owner : match a known owner from a list
- summary : match a string in a description
- priority (as P1, P2, P3, P4 or P5) : match one or more priorities
- completed : match true or false
- completionDate (null is not completed)  : match before, after and null
- creationDate  : match before, after and null
- dueDate  : match before, after and null
- notes : match a string in a description

and possibly:

- in the list of TaskComments and
- in the list of TaskAttachments.

Back to the top