Difference between revisions of "MemoryAnalyzer/Ramp Down Plan"

m (Ramp down plan)
(Ramp down plan)
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
For milestones, the component lead (or delegate) is enough to review and approve a bug.  
 
For milestones, the component lead (or delegate) is enough to review and approve a bug.  
  
'''For M7, we plan to be API and feature complete''', so there will be no breaking API changes and no new feature requests will be accepted.
+
'''For M3 [''was M7 for Photon and before''], we plan to be API and feature complete''', so there will be no breaking API changes and no new feature requests will be accepted.
  
'''For RC1 - RC2 only bugfixes to Memory Analyzer''' functionality should be done. The following describes the types of bugs that would be appropriate:
+
'''For RC1 [''was RC1 and RC2 for Photon and before''] only bug fixes to Memory Analyzer''' functionality should be done. The following describes the types of bugs that would be appropriate:
 
* A regression
 
* A regression
 
* A P1 or P2 bug, one that is blocking or critical
 
* A P1 or P2 bug, one that is blocking or critical
* Minor documentation changes
+
* Minor documentation changes, including adding new and noteworthy
  
'''For RC3 - RC4''' only bugfixes damaging the build/functionality of the simultaneous release should are allowed
+
'''For RC2 [''was RC3 - RC4 for Photon and before'']''' only bug fixes damaging the build/functionality of the simultaneous release should are allowed
 
+
== See Also ==
+
  
 
* [[Galileo Simultaneous Release]]
 
* [[Galileo Simultaneous Release]]
 
* [[Helios Simultaneous Release]]
 
* [[Helios Simultaneous Release]]
 
* [[Indigo Simultaneous Release]]
 
* [[Indigo Simultaneous Release]]
 +
* [[Juno/Simultaneous Release Plan]]
 +
* [[Kepler/Simultaneous Release Plan]]
 +
* [[Luna/Simultaneous Release Plan]]
 +
* [[Mars/Simultaneous Release Plan]]
 +
* [[Neon/Simultaneous Release Plan]]
 +
* [[Oxygen/Simultaneous Release Plan]]
 +
* [[Photon/Simultaneous Release Plan]]
 +
* [[Simultaneous Release]] subsequent releases on a 13-week cycle
  
 
[[Category:Memory Analyzer]]
 
[[Category:Memory Analyzer]]

Latest revision as of 05:12, 23 October 2019

Ramp down plan

Typically the last week of a Milestone is for testing, and fixing only regressions and P1 or blocking defects. For milestones, the component lead (or delegate) is enough to review and approve a bug.

For M3 [was M7 for Photon and before], we plan to be API and feature complete, so there will be no breaking API changes and no new feature requests will be accepted.

For RC1 [was RC1 and RC2 for Photon and before] only bug fixes to Memory Analyzer functionality should be done. The following describes the types of bugs that would be appropriate:

  • A regression
  • A P1 or P2 bug, one that is blocking or critical
  • Minor documentation changes, including adding new and noteworthy

For RC2 [was RC3 - RC4 for Photon and before] only bug fixes damaging the build/functionality of the simultaneous release should are allowed