Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

JEE Status Meetings/2008-12-11

< JEE Status Meetings
Revision as of 13:17, 11 December 2008 by Kaloyan.raev.sap.com (Talk | contribs) (Minutes)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Attendees

  • Carl Anderson
  • Chuck Bridgham
  • Dimitar Giormov
  • Kaloyan Raev
  • Kiril Mitov

Agenda

  1. Java EE 6 in Galileo
    • facets 252613
    • EMF models 252615
    • Upgrade EE spec level 194926
    • Wizard extensibility 252618
    • import/export & binary support 258191
    • Other modules for EE 6 tolerance:
      • Java EE Modules Dependency page
      • deploy
      • builders
      • validators
      • any other place that has a switch statement on the JEE version

Minutes

Java EE 6
facets
  • SAP team can do this for Galileo M5
  • new facet version should be defined
  • the existing facet install delegates should be improved to work properly with the new facet versions.
upgrade EE spec level
  • We cannot commit this for now
  • perhaps mark it as helpwanted
EMF models:
  • IBM team will do this for M6
  • the existing EE 5 models will be extended to cover the EE 6 specs
EJB 3.1 in WAR - out of scope for Galileo
wizard extensibility
  • SAP team will analyze this and will make as much as possible for M6
  • this topic should be discussed in more details in future meetings
import/export of EE 6 modules/archives
  • IBM team will do this for M6
Java EE Module Dependencies page
  • SAP team will do this for M6
  • Lib Dir in classpath
    • there is a bug opened for this: 255243
    • SAP team will try to work on this for Ganymede SR2.
DD trees
  • a bug should be opened
  • we will analyze this in more details in future meetings
deploy, builder, validator
  • a single enhancement should be opened
  • further analysis needed
  • validators - perhaps mark it as helpwanted, adopters can provide their own.
Vacations
SAP team will not be available for smoke testing for the two weeks between Dec 22 and Jan 04.

Back to the top