Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "ICE March 2017 Status Meetings"

Line 48: Line 48:
 
Anara - Setting up and learning about EAVP.<br>
 
Anara - Setting up and learning about EAVP.<br>
 
Robert - Helping Anara with setting up EAVP. <br>
 
Robert - Helping Anara with setting up EAVP. <br>
 +
 +
=== 20170328 ===
 +
 +
Anara - Working on making OSGI work with Vaadin. <br>

Revision as of 14:00, 28 March 2017

20170306

Jay - ICEMan team meeting.
Alex - Separated EMF model into core data model and Eclipse specific implementations.
Greg - Working on RC4 release for PTP.
Anara - Adding advanced views to recreated apps project.

20170307

Alex - Continuing development of environment model.
Anara - Working on advanced view. Set up relative path in Vaadin.

20170308

Greg - Working on RC4.
Robert - Refactor for visualization services preference menu.

20170310

Anara - Learning about data binding, binding user fields to EMF model.
Robert - Working on saving preferences in store for visualization menu refactor.

20170313

Anara - Working on establishing connection between Vaadin and EMF model.
Robert - Working on remote connections/files for preferences menu refactor.

20170314

Alex - Helping with the finishing touches of the app store.
Anara - Helping with the finishing touches of the app store. Binding the data model to Vaadin.
Robert - Changing the IVizService preferences to work with new IVizConnectionPreferences class.

20170315

Alex - Implemented the listAvailableSPackPackages() method. Pulling default Docker image for ICE.
Anara - Added container for OS package field.
Robert - Changing the IVizService preferences to work with new IVizConnectionPreferences class.

20170317

Alex - Tying up the rest of the work on the app store. Replaced beans with reference to an IEnvironment.
Anara - Finishing last touches on app store (deselection, validation, etc.)
Robert - Finishing up refactor for Viz service preferences page refactor.

20170327

Anara - Setting up and learning about EAVP.
Robert - Helping Anara with setting up EAVP.

20170328

Anara - Working on making OSGI work with Vaadin.

Back to the top