Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
ICE February 2017 Status Meetings
Revision as of 15:07, 6 February 2017 by Smithrw.ornl.gov (Talk | contribs)
20170201
Greg - Training and CADES website. Working on paper.
Robert - Getting TASQC building on Linux. Getting familiar with Gnuradio
Anara - Going through tutorial and finding bugs. Reading up on Eclipse Modeling Framework.
20170203
Hilda - Working on login module of geoscience application. Working on presentation.
20170206
Hilda - Studying Spack and docker. Setting up Ubuntu machine on CADES for Docker testing. Working on planning for Eclipse Converge talk.
Greg -
Robert - Looking at ADIOS Java SWIG bindings. Refactoring visualization prefrences page with Master/Details block.
Anara - Working on app store realization. Studying EMF and SWT.