Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "ICE February 2017 Status Meetings"

Line 23: Line 23:
  
 
Anara - Working on EMF tutorial. <br>
 
Anara - Working on EMF tutorial. <br>
 +
 +
=== 20170210 ===
 +
 +
Hilda - Installing Spack. Testing connection to CADES docker machine. Preparing for Eclipse Converge talk and logging issues in Github tracker. <br>
 +
Robert - Working on visualization preferences page refactor.  <br>
 +
Anara - Creating EMF model for app store wizard. Finishing EMF tutorial. <br>

Revision as of 15:04, 10 February 2017

20170201

Greg - Training and CADES website. Working on paper.
Robert - Getting TASQC building on Linux. Getting familiar with Gnuradio
Anara - Going through tutorial and finding bugs. Reading up on Eclipse Modeling Framework.

20170203

Hilda - Working on login module of geoscience application. Working on presentation.

20170206

Hilda - Studying Spack and docker. Setting up Ubuntu machine on CADES for Docker testing. Working on planning for Eclipse Converge talk.
Robert - Looking at ADIOS Java SWIG bindings. Refactoring visualization prefrences page with Master/Details block.
Anara - Working on app store realization. Studying EMF and SWT.

20170207

Greg - Removing old builds from HIPP server.
Anara - Install Eclipse for EMF. Working on EMF tutorial.

20170208

Anara - Working on EMF tutorial.

20170210

Hilda - Installing Spack. Testing connection to CADES docker machine. Preparing for Eclipse Converge talk and logging issues in Github tracker.
Robert - Working on visualization preferences page refactor.
Anara - Creating EMF model for app store wizard. Finishing EMF tutorial.

Back to the top