Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox/p2/Meetings/20080915"

< Equinox‎ | p2‎ | Meetings
Line 23: Line 23:
 
** Need to merge into Equinox project plan (some discussion about the shape this should take)
 
** Need to merge into Equinox project plan (some discussion about the shape this should take)
 
* p2 get together
 
* p2 get together
** Should we have a p2 face-to-face meeting to coincide with the [[Build_Workshop_3:_Build_Hard_With_A_Purpose]]
+
** Should we have a p2 face-to-face meeting to coincide with the [[Build Workshop 3: Build Hard With A Purpose]]?
 
* 3.4.1 status: ship it
 
* 3.4.1 status: ship it
 
* Testing
 
* Testing
 
* Wiki update
 
* Wiki update

Revision as of 11:19, 15 September 2008

Agenda

  • Galileo plan
  • 3.4.1 status
  • Testing
  • Wiki update

Attendees

  • Andrew Cattle
  • Andrew Niefer
  • DJ Houghton
  • Jeff McAffer
  • John Arthorne
  • Pascal Rapicault
  • Simon Kaegi
  • Susan McCourt

Minutes

  • Galileo plan
    • Draft p2 plan here with milestone plan here
    • Need to merge into Equinox project plan (some discussion about the shape this should take)
  • p2 get together
  • 3.4.1 status: ship it
  • Testing
  • Wiki update

Back to the top