Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "EPIC Council Meeting 06Aug15"
Line 6: | Line 6: | ||
* Team to review T&P for next meeting. | * Team to review T&P for next meeting. | ||
* Skip to circulate tool for using Word with WIKI. | * Skip to circulate tool for using Word with WIKI. | ||
− | * Ian sent adcopy link, please provide feedback. Concerns raised over random-plugin generation as it may not be percieved as Random. | + | * Ian sent adcopy link, please provide feedback. Concerns raised over random-plugin generation as it may not be percieved as Random. This needs to be further examined as a group. |
+ | * Nathan to send update on workplan later this week. | ||
+ | * Donald updated the [[EPIC_Minutes_and_Transparency_Guidelines]]. Team should review and update as needed. Suggestion to post link to EPIC wiki page from EPIC "About us page", Nathan to investigate. |
Revision as of 11:47, 15 August 2006
Present - Donald, Skip, Nathan, Mike Taylor, Todd, Maher. Regrets - Jochen, Eric
- Survey working group to review survey sent by Mike. Concern over timing doing a survey in August, proposal to do in very early September. Send feedback on survey to Mike.
- Nathan has added some new features to EPIC, some require admin privledges such as tagging a plugin by pillar.
- Team to review T&P for next meeting.
- Skip to circulate tool for using Word with WIKI.
- Ian sent adcopy link, please provide feedback. Concerns raised over random-plugin generation as it may not be percieved as Random. This needs to be further examined as a group.
- Nathan to send update on workplan later this week.
- Donald updated the EPIC_Minutes_and_Transparency_Guidelines. Team should review and update as needed. Suggestion to post link to EPIC wiki page from EPIC "About us page", Nathan to investigate.