ECF Simrel Plan for Mars
Contact: Scott Lewis
Derived from SimRel/Simultaneous Release Requirements
This document defines the plan for participating in the yearly Simultaneous Release.
Current ECF Releng Needs to Complete a Release
- Complete build of appropriate version via the R-HEAD-sdk.feature project on the ecf builder. Once this build has completed successfully, there will be a new directory of same name as is specified by the parameter given when starting the R-HEAD-sdk.feature build in ECF's staging directory at download.eclipse.org. ECF's download area is in 'rt/ecf' so the staging directory is in 'rt/ecf/staging'. For example, for version 3.9.1 specified as the version when starting the R-HEAD-sdk.feature build, there would be a new directory in 'rt/ecf/staging/3.9.1'. Within this directory will be a directory name site.p2, which contains the built and signed version of the ECf p2 repository, as well as a zip of the entire repo named (for example): org.eclipse.ecf.sdk_3.9.1.v20141116-2130.zip.
The ECF download URL is of the form: http://download.eclipse.org/<ecf area>/
Mandatory Requirements for SR Participation
The requirements and conditions stated in this section are the basic minimum required for a project to claim they are part of the yearly Simultaneous Release. Some of those are required to be completed earliy in the release cycle.
Action | Who | When | Finished |
---|---|---|---|
State Intent | Scott | M4 | |
Formal Plans | M4 | ||
IP Documentation and Logs (RC1) | RC1 | ||
Integrate Early and Often | RC1 | ||
Communication | Wim/Scott | M4 | Done |
Required Bundle forms and formats | Build | RC1 | |
Re-use and share common third party code | Wim | RC1 | |
Provide optimized p2 repository | Build | RC1 | Done |
Branding | RC1 | ||
Do No Harm | RC1 |