Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP Project Lead Meeting Minutes: October 5, 2009

Back to DTP Project Lead Meeting Minutes: 2009, October through December page

Attendees

  • Brian "Fitz" Fitzpatrick (Red Hat)
  • Linda Chan (Actuate)
  • Brian Payton (IBM)
  • Hemant Kolwalkar (IBM)

Minutes

  • The PMC will work on the Helios project plan during the PMC meeting tomorrow
  • Fitz said that Larry Dunnell (IBM) will no longer be involved with the DTP project. This leaves a gap in coverage for the Connectivity project. Brian P. will find out whether anyone else from IBM will be working on Connectivity in Larry's place
  • Hemant said he still needs to look into the Modelbase defect that has a target of 1.7.2
  • Fitz said that as of the last time he checked, the Sybase was on track for delivering the doc source files to DTP by the end of October

Copyright © Eclipse Foundation, Inc. All Rights Reserved.