Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: May 5, 2008"

(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Sheila Sholars *Larry Dunnell *Brian Payton *Linda Chan *Der P...)
 
(Agenda)
 
(3 intermediate revisions by the same user not shown)
Line 14: Line 14:
  
 
==Agenda==
 
==Agenda==
 +
* Milestones/dates/release candidates -- what happens when and for how long?
 +
* Bundle activation/lazy start bug - if sub-project leads feel this is important, please address this in RC1 (BZ228295)
 +
* Please start testing today's milestone integration build with the M7/RC0 build of Eclipse 3.4 and 3.3.2
 +
* Please start looking at the SQL tooling documentation from Emily (BZ229675)
 
* Doshiro status - committer election finished for enablement, sqldevtools & modelbase elections have started
 
* Doshiro status - committer election finished for enablement, sqldevtools & modelbase elections have started
 
* Hemant status - committer election for enablement finished
 
* Hemant status - committer election for enablement finished
Line 21: Line 25:
 
* bugs with no target milestone set need to be dispositioned (looking much better, down to 2 at last glance)
 
* bugs with no target milestone set need to be dispositioned (looking much better, down to 2 at last glance)
 
https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=
 
https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=
* get status from team leads as to where they think their projects are for Ganymede
+
* Sub-project status (from team leads)
 
* Open discussion
 
* Open discussion
  

Latest revision as of 13:46, 5 May 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Sheila Sholars
  • Larry Dunnell
  • Brian Payton
  • Linda Chan
  • Der Ping Chou
  • Hung Hsi

Regrets

  • John Graham

Agenda

  • Milestones/dates/release candidates -- what happens when and for how long?
  • Bundle activation/lazy start bug - if sub-project leads feel this is important, please address this in RC1 (BZ228295)
  • Please start testing today's milestone integration build with the M7/RC0 build of Eclipse 3.4 and 3.3.2
  • Please start looking at the SQL tooling documentation from Emily (BZ229675)
  • Doshiro status - committer election finished for enablement, sqldevtools & modelbase elections have started
  • Hemant status - committer election for enablement finished
  • down to only five bugs still set for Ganymede target milestone - thanks for dispositioning those

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=Ganymede&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_status=RESOLVED&emailtype1=exact&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • M7/RC0 update - rampdown lifted on thursday
  • bugs with no target milestone set need to be dispositioned (looking much better, down to 2 at last glance)

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Copyright © Eclipse Foundation, Inc. All Rights Reserved.