Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: June 2, 2008"

(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Sheila Sholars *Larry Dunnell *Brian Payton *John Graham *Der ...)
 
(Regrets)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
==Attendees==
 
==Attendees==
 
*Brian Fitzpatrick
 
*Brian Fitzpatrick
*Sheila Sholars
 
 
*Larry Dunnell
 
*Larry Dunnell
*Brian Payton
 
*John Graham
 
*Der Ping Chou
 
 
*Emily Kapner
 
*Emily Kapner
*Hung Hsi
+
*Sheila Sholars
 
*Linda Chan
 
*Linda Chan
 +
*John Graham
 +
*Hung Hsi
  
 
==Regrets==
 
==Regrets==
 +
*Brian Payton
 +
*Der Ping Chou
  
 
==Agenda==
 
==Agenda==

Latest revision as of 18:46, 2 June 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Larry Dunnell
  • Emily Kapner
  • Sheila Sholars
  • Linda Chan
  • John Graham
  • Hung Hsi

Regrets

  • Brian Payton
  • Der Ping Chou

Agenda

  • Beginning testing phase for RC3 with 6/2 1.6 RC3 build candidate on 3.3.2 and 3.4
  • Doshiro status - Hung, please provide CVS/SVN package information to finish the committer process
  • Hung, please have Max look into bug 233453 (https://bugs.eclipse.org/bugs/show_bug.cgi?id=233453) - this is a critical fix we should try and squeeze into RC3 or get into RC4
  • Working on getting the Connectivity/SQL Dev Tools help in as part of the normal DTP build, should be done by RC4
  • We are up to 23 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Back to the top