Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: June 2, 2008"
(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Sheila Sholars *Larry Dunnell *Brian Payton *John Graham *Der ...) |
(→Attendees) |
||
Line 3: | Line 3: | ||
==Attendees== | ==Attendees== | ||
*Brian Fitzpatrick | *Brian Fitzpatrick | ||
− | |||
*Larry Dunnell | *Larry Dunnell | ||
+ | *Emily Kapner | ||
+ | *Sheila Sholars | ||
+ | *Linda Chan | ||
+ | |||
*Brian Payton | *Brian Payton | ||
*John Graham | *John Graham | ||
*Der Ping Chou | *Der Ping Chou | ||
− | |||
*Hung Hsi | *Hung Hsi | ||
− | |||
==Regrets== | ==Regrets== |
Revision as of 14:03, 2 June 2008
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- Brian Fitzpatrick
- Larry Dunnell
- Emily Kapner
- Sheila Sholars
- Linda Chan
- Brian Payton
- John Graham
- Der Ping Chou
- Hung Hsi
Regrets
Agenda
- Beginning testing phase for RC3 with 6/2 1.6 RC3 build candidate on 3.3.2 and 3.4
- Doshiro status - Hung, please provide CVS/SVN package information to finish the committer process
- Hung, please have Max look into bug 233453 (https://bugs.eclipse.org/bugs/show_bug.cgi?id=233453) - this is a critical fix we should try and squeeze into RC3 or get into RC4
- Working on getting the Connectivity/SQL Dev Tools help in as part of the normal DTP build, should be done by RC4
- We are up to 23 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.
- Sub-project status (from team leads)
- Open discussion