==Attendees== | ==Attendees== | ||
− | + | *John Graham | |
+ | *Hung Hsi | ||
+ | *Der-Ping Chou | ||
+ | *Sheila Sholars | ||
+ | *Rob Cernich | ||
+ | *Linda Chan | ||
+ | *Brian Payton | ||
==Regrets== | ==Regrets== | ||
Line 7: | Line 13: | ||
*(John): DTP 1.5M5 I-build and M-build update | *(John): DTP 1.5M5 I-build and M-build update | ||
*(John): DTP 1.5M5 [[Pack200 | Pack200]] update site for testing: | *(John): DTP 1.5M5 [[Pack200 | Pack200]] update site for testing: | ||
− | **http:// | + | **http://download.eclipse.org/datatools/downloads/drops/updates/site.xml |
**Initial tests look good, but further testing this week is required | **Initial tests look good, but further testing this week is required | ||
+ | *(Sheila): IBM Enablement test cases due by 3/5 | ||
+ | *(Rob, John): Brief update on the new DTP build system status | ||
*Individual project status | *Individual project status | ||
==Minutes== | ==Minutes== | ||
− | + | *(John): Update on DTP 1.5M5 status, including temporary update site | |
+ | *(Sheila): Will open bugs for each project for IBM Enablement test cases | ||
+ | *(Rob, John): Update on the build transition | ||
+ | *(Der-Ping): Working on jarring the Model Base at the end of this week | ||
+ | *(Rob): Connectivity working on project plan | ||
+ | *(Hung): Working on project plan, post by Wed. | ||
+ | *(Der-Ping): New extensibility in DSE would benefit from the WTP committer who worked on this (Loic) | ||
+ | *(Brian): Continuing to work on next drop of VisQ | ||
==Action Items== | ==Action Items== | ||
+ | *'''Project leads:''' Project plans by end of this week. | ||
+ | *'''Project leads:''' IBM Enablement test cases by 3/5. | ||
+ | *'''All:''' Test DTP 1.5M5 I-build from today for promotion to Europa by end of this week (starting Wed, if possible) |
Latest revision as of 12:24, 6 July 2007
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- John Graham
- Hung Hsi
- Der-Ping Chou
- Sheila Sholars
- Rob Cernich
- Linda Chan
- Brian Payton
Regrets
Agenda
- (John): DTP 1.5M5 I-build and M-build update
- (John): DTP 1.5M5 Pack200 update site for testing:
- http://download.eclipse.org/datatools/downloads/drops/updates/site.xml
- Initial tests look good, but further testing this week is required
- (Sheila): IBM Enablement test cases due by 3/5
- (Rob, John): Brief update on the new DTP build system status
- Individual project status
Minutes
- (John): Update on DTP 1.5M5 status, including temporary update site
- (Sheila): Will open bugs for each project for IBM Enablement test cases
- (Rob, John): Update on the build transition
- (Der-Ping): Working on jarring the Model Base at the end of this week
- (Rob): Connectivity working on project plan
- (Hung): Working on project plan, post by Wed.
- (Der-Ping): New extensibility in DSE would benefit from the WTP committer who worked on this (Loic)
- (Brian): Continuing to work on next drop of VisQ
Action Items
- Project leads: Project plans by end of this week.
- Project leads: IBM Enablement test cases by 3/5.
- All: Test DTP 1.5M5 I-build from today for promotion to Europa by end of this week (starting Wed, if possible)