Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC Meeting September 11, 2007"
Line 9: | Line 9: | ||
*Update on "build-as-changed" proposal for DTP 1.6 (from last week) | *Update on "build-as-changed" proposal for DTP 1.6 (from last week) | ||
==Minutes== | ==Minutes== | ||
− | + | Discussion about VisQ builder: | |
**There's a lot to do: what is realistic in 1.6? | **There's a lot to do: what is realistic in 1.6? | ||
**Given its probable state in 1.6, what is the best way to describe it? | **Given its probable state in 1.6, what is the best way to describe it? |
Revision as of 15:13, 11 September 2007
← Back to DTP PMC Meeting Page
Contents
Attendees
- John Graham
- Sheila Sholars
Regrets
Agenda
- No PMC meeting next week (travel to Eclipse Members' meeting)
- Update on "build-as-changed" proposal for DTP 1.6 (from last week)
Minutes
Discussion about VisQ builder:
- There's a lot to do: what is realistic in 1.6?
- Given its probable state in 1.6, what is the best way to describe it?
- "Incubator" is a reserved word at Eclipse, so not that
- "Prototype" sound less solid than it (likely) will be
- Let's talk to the rest of the VisQ team about this...
- Encourage the VisQ team to seek out and work with early adopters