Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DSDP/TM/Committer Phone Meeting 7-Nov-2006"
Line 12: | Line 12: | ||
MartinO to start conference call - please dial in using the numbers above.<br/> | MartinO to start conference call - please dial in using the numbers above.<br/> | ||
'''Please be available for Skype Chat in parallel to the call.''' MartinO will start Skype chat just prior to call.<br/> | '''Please be available for Skype Chat in parallel to the call.''' MartinO will start Skype chat just prior to call.<br/> | ||
− | Skype fallback dial-in - only if less than 5 participants: '''martin.oberhuber''', ddykstal (or david_dykstal), david-k-mcknight, kushal.munir, javier.montalvoorus, tedatteddotnet, | + | Skype fallback dial-in - only if less than 5 participants: '''martin.oberhuber''', ddykstal (or david_dykstal), david-k-mcknight, kushal.munir, javier.montalvoorus, tedatteddotnet, michael_scharf, and uwe.stieber.<br/> |
== Attendees == | == Attendees == | ||
* IBM - Dave Dykstal, Dave McKnight, Kushal Munir | * IBM - Dave Dykstal, Dave McKnight, Kushal Munir | ||
* Symbian - Javier Montalvo Orús | * Symbian - Javier Montalvo Orús | ||
− | * Wind River - Martin Oberhuber, Uwe Stieber | + | * Wind River - Martin Oberhuber, Uwe Stieber, Michael Scharf, Ted Williams |
* Tradescape - Lothar Werzinger | * Tradescape - Lothar Werzinger | ||
Line 28: | Line 28: | ||
** Get our '''Processes''' in place --> JUnit, nightly builds, infocenter, update site | ** Get our '''Processes''' in place --> JUnit, nightly builds, infocenter, update site | ||
* Latest News | * Latest News | ||
− | ** Martin -- | + | ** Martin -- Preparing signed jars - [https://bugs.eclipse.org/bugs/show_bug.cgi?id=163421 bug 163421]; daily I-builds, build notes; about files still pending |
** DaveD -- | ** DaveD -- | ||
** DaveM -- | ** DaveM -- | ||
Line 38: | Line 38: | ||
** Other News -- | ** Other News -- | ||
* Top Priorities this week: | * Top Priorities this week: | ||
− | ** '''#1 - | + | ** '''#1 - hi-priority bug fixing, testing and verification''' |
− | ** '''#2 - | + | ** '''#2 - Being responsive''' |
− | ** ''' | + | ** '''#3 - Apply doc fixes''' |
− | * | + | * Current Work |
− | ** | + | ** '''Endgame Plan''': |
− | ** | + | *** Bug Fixes all tuesday and wednesday |
− | ** | + | *** Martin to release the Mapfiles each morning Europe time --> automatic I-build at 7am Ottawa time |
− | ** | + | **** Please test and verify late fixes in the I-builds as you can! |
− | *** | + | **** Look at the "fixed bugs not yet verified" on the [http://www.eclipse.org/dsdp/tm/development/bug_process.php bug process page] |
− | ** | + | *** '''Thursday: testing and doc fixes only''' |
− | *** [ | + | *** Martin to release the Mapfiles Friday morning Europe time --> final I-build (RC) at 7am Ottawa time |
+ | *** Plan to release this unchanged on Friday | ||
+ | ** '''New bugs''': REVIEW [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&classification=DSDP&product=Target+Management&component=RSE&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailassigned_to1=1&emailtype1=exact&email1=dsdp.tm.rse-inbox%40eclipse.org&cmdtype=doit Assigned to Inbox], [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&classification=DSDP&product=Target+Management&component=RSE&bug_status=NEW&cmdtype=doit Status NEW] | ||
+ | *** Open bugs: [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&classification=DSDP&product=Target+Management&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&cmdtype=doit&field0-0-0=priority&type0-0-0=regexp&value0-0-0=P%5B12%5D&field0-0-1=bug_severity&type0-0-1=regexp&value0-0-1=blocker%7Ccritical%7Cmajor Major, Critical, P1, P2 bugs], [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=%5Bapi&classification=DSDP&product=Target+Management&component=RSE&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&cmdtype=doit API bugs], [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&classification=DSDP&product=Target+Management&component=RSE&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&cmdtype=doit&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1 Open with Patch], | ||
* Upcoming Work | * Upcoming Work | ||
** Start IBM and EMO review process for User Actions and Import/Export (DaveD) | ** Start IBM and EMO review process for User Actions and Import/Export (DaveD) | ||
** Start creating Unit Tests, Testing feature (DaveD, Uwe) | ** Start creating Unit Tests, Testing feature (DaveD, Uwe) | ||
** Continue bug fixing on HEAD (All) | ** Continue bug fixing on HEAD (All) | ||
− | ** Add ISV Javadoc where it is still missing or incorrect; review, and improve all docs | + | ** Fix compiler warnings, prepare for FinBugs (Kushal) |
+ | ** Add ISV Javadoc where it is still missing or incorrect; review, and improve all docs (DaveM) | ||
** [[RSE 2.0 Planning]] - Finalize the 2.0 Project Plan | ** [[RSE 2.0 Planning]] - Finalize the 2.0 Project Plan | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* Communications | * Communications | ||
− | ** | + | ** F2F meeting Toronto, Jan.17-18 (tentative)? - Use as brainstorming / architecture / planning meeting for upcoming "larger" 2.0 changes. Is January too late for that? Do we need it? |
** [[DSDP/TM/Code_Ownership]] | ** [[DSDP/TM/Code_Ownership]] | ||
** API changes: we'll not introduce any api changes between 1.0 and 1.0.1 | ** API changes: we'll not introduce any api changes between 1.0 and 1.0.1 | ||
*** But prepare for API changes soon after 1.0.1 | *** But prepare for API changes soon after 1.0.1 | ||
− | |||
− | |||
* Change Requests | * Change Requests | ||
* Vacations, Holidays etc. | * Vacations, Holidays etc. |
Revision as of 10:13, 7 November 2006
Meeting Title: | TM Committer Phone Meeting |
Date & Time: | Tuesday Nov 7, 2006 at 7am SFO / 9.00am Rochester / 10.00pm Toronto / 3pm London / 4pm Salzburg |
Dial-in: | International +44 (0)1452 567588 North America +1 (866) 6161738 (toll free) UK National 08712460713 Passcode: 0587322148 # |
MartinO to start conference call - please dial in using the numbers above.
Please be available for Skype Chat in parallel to the call. MartinO will start Skype chat just prior to call.
Skype fallback dial-in - only if less than 5 participants: martin.oberhuber, ddykstal (or david_dykstal), david-k-mcknight, kushal.munir, javier.montalvoorus, tedatteddotnet, michael_scharf, and uwe.stieber.
Contents
Attendees
- IBM - Dave Dykstal, Dave McKnight, Kushal Munir
- Symbian - Javier Montalvo Orús
- Wind River - Martin Oberhuber, Uwe Stieber, Michael Scharf, Ted Williams
- Tradescape - Lothar Werzinger
This is an Open call, so anyone else can join (though we expect the talk to be interesting for committers only).
Agenda
- Our top goals
- Grow the Communities - active users and adopters --> tutorial, docs, mailinglist help
- Get the APIs Right --> enable public API discussion --> ISV docs, Wiki API discussion, [api] bugzilla's
- Get our Processes in place --> JUnit, nightly builds, infocenter, update site
- Latest News
- Martin -- Preparing signed jars - bug 163421; daily I-builds, build notes; about files still pending
- DaveD --
- DaveM --
- Kushal --
- Javier --
- Ted --
- Uwe --
- Michael --
- Other News --
- Top Priorities this week:
- #1 - hi-priority bug fixing, testing and verification
- #2 - Being responsive
- #3 - Apply doc fixes
- Current Work
- Endgame Plan:
- Bug Fixes all tuesday and wednesday
- Martin to release the Mapfiles each morning Europe time --> automatic I-build at 7am Ottawa time
- Please test and verify late fixes in the I-builds as you can!
- Look at the "fixed bugs not yet verified" on the bug process page
- Thursday: testing and doc fixes only
- Martin to release the Mapfiles Friday morning Europe time --> final I-build (RC) at 7am Ottawa time
- Plan to release this unchanged on Friday
- New bugs: REVIEW Assigned to Inbox, Status NEW
- Open bugs: Major, Critical, P1, P2 bugs, API bugs, Open with Patch,
- Endgame Plan:
- Upcoming Work
- Start IBM and EMO review process for User Actions and Import/Export (DaveD)
- Start creating Unit Tests, Testing feature (DaveD, Uwe)
- Continue bug fixing on HEAD (All)
- Fix compiler warnings, prepare for FinBugs (Kushal)
- Add ISV Javadoc where it is still missing or incorrect; review, and improve all docs (DaveM)
- RSE 2.0 Planning - Finalize the 2.0 Project Plan
- Communications
- F2F meeting Toronto, Jan.17-18 (tentative)? - Use as brainstorming / architecture / planning meeting for upcoming "larger" 2.0 changes. Is January too late for that? Do we need it?
- DSDP/TM/Code_Ownership
- API changes: we'll not introduce any api changes between 1.0 and 1.0.1
- But prepare for API changes soon after 1.0.1
- Change Requests
- Vacations, Holidays etc.
- Kushal - Business trip Nov 9 and 10
- US Thanksgiving - End of November
- Free discussion -- feelings, comments, critics
Action Items
- Last Meeting Action Items
- DaveD - Edit Code Ownership. Submit UDA and Import/Export for review; JUnit tests; Hi-Pri bugs. New bug for moving DTD.
- DaveM - Enter Resume into www.eclipsecon.org; Bugs
- Kushal - Bugs
- Martin - Work on 2.0 project plan; TM FAQ on the Wiki; Hi-pri bugs;
- Javier - Hook up with Scott Lewis once SD is committed and works
- Ted - Terminalview; Document the build process