Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Cosmos Architecture Meeting 3-September-08

Revision as of 04:46, 4 September 2008 by Strpa05.ca.com (Talk | contribs) (Data Collection)

These are the minutes for the Architecture Meeting for 3 September 2008.

Attendees

  • Paul (minutes)
  • Jack
  • Tina
  • Leonard
  • Jimmy
  • Martin

Agenda

  • Data Reporting
    • ERs i13
    • Bugs i13
    • ER 238345 Leonard
    • Create a subset of DOJO to redistributed with COSMOS - Sheldon - NO ER ???
  • Data Collection
    • ERs i13
    • Bugs i13
    • ER 242766 Create a subset of Axis2 to redistributed with COSMOS - Hubert.
  • Architecture (All Components)
    • i13 candidate status
    • [1] i13 Bugs
    • Usage of i13 plan and status
  • Around the room

Minutes

Data Reporting

  • Martin confirmed as Team Lead for Data Reporting
  • No enhancements outstanding for i13
  • 1 bug outstanding for i13 (245568) Problem with UI concerning "Sample Repository with Query". Martin will have Leonard take a look to assess severity and whether this is a show stopper. Leonard thought he had seen this before.
  • Bug 238345 addressed by Leonard and JT. Fix submitted. Maybe some followup required. Loenard to confirm.
  • Repackaging of DOJO - No ER. Need to get a status from Sheldon/Ruth

Data Collection

  • No Enhancements outstanding for i13
  • 2 bugs outstanding for i13
    • 228266 - Raised by Saurabh concerning running JUNITS after build cycle. Paul will followup with Saurabh to see if still required
    • 242766 - Create a subset of Axis2 to redistributed with COSMOS. This needs to be completed for i13. Need to get a status from Hubert/Ruth. Hubert can't do anything until legal issues are resolved.

Architecture

  • Reviewed list of ER's Open against i13 or no specified milestone (all components)
  • Doc issues will be reviewed on Friday 5th Sept Doc Review
  • i14 ER candidates will be reviewed over the next few weeks and finalized on Arch call.
  • Component leads will be updating the i13 status matrix to reflect current status

Back to the top