Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Category:Eclipse Platform Releng Meetings"

(correct banner to note there are no more meetings)
Line 1: Line 1:
Meetings for Platform Release Engineering. These are intended to be short, very focused meetings, concerned with narrow range of topic, such as making 4.2 primary build, building and testing the platform on build.eclipse.org, and similar. Many issues can be solved via IRC or bugzilla, but best to have a phone meeting scheduled to help make sure we (or, at least me, myself :) stay on track.
+
Meetings for Platform Release Engineering.
 
+
These are scheduled every Tuesday, 2:30 PM to 3:00 PM, until June 5th, and ideally we won't need them that long! The call-in number is
+
:  888-426-6840  Participant Code: 6460142
+
 
+
 
+
 
+
  
 +
The regularly occurring meeting have been discontinued since they were so successful (and everything transitioned quickly).
  
 +
Please use IRC, bugzilla, or mailing lists for issues ... or, request a meeting if we need one.
  
  

Revision as of 12:01, 17 May 2012

Meetings for Platform Release Engineering.

The regularly occurring meeting have been discontinued since they were so successful (and everything transitioned quickly).

Please use IRC, bugzilla, or mailing lists for issues ... or, request a meeting if we need one.

Back to the top