Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Agenda (10/28/08))
(Working Documents)
 
(18 intermediate revisions by the same user not shown)
Line 30: Line 30:
 
Email [[mailto:Jason.Losh@sas.com'''Jason Losh''']]
 
Email [[mailto:Jason.Losh@sas.com'''Jason Losh''']]
  
 +
== Agenda (1/27/09) ==
 +
* 1.1 i2 status update
 +
** http://wiki.eclipse.org/COSMOS_1.1_Iteration2_Features
 +
** Preliminary design discussions
 +
** Profile and profile module discussion
 +
* BTG status
 +
** CL2 rules in the open
 +
* Around the room
  
== Working Design Documents ==
+
== Agenda (1/13/09) ==
*[[COSMOS_Design_198553]], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553: Provide an implementation of WS Resource Catalog]
+
* Welcome Joe
*[http://wiki.eclipse.org/COSMOS_SDD_Runtime_Architecture SDD Runtime Architecture 1.0 (updated)]
+
* 1.1 i1 closure
 +
** Build status
 +
** Build declared unstable due to a couple of non-ME bugs
 +
* 1.1 i2 plans
 +
** ERs for i2 entered -- owners for each should be on the architecture call Wednesday morning to discuss
 +
** Any warranting discussion today?
 +
** http://wiki.eclipse.org/COSMOS_1.1_Iteration2_Features
 +
* BTG status
 +
** Are we "done done" with the BTG for CL1 - have a potential adopter
 +
* Profile and profile module discussion
 +
* Around the room
  
== Misc Documents ==
+
== Agenda (1/6/09) ==
*[[P2 Install Example]]
+
*[[SDD Runtime Design Discussion Artifacts]]
+
 
+
== Agenda (12/16/08) ==
+
 
* 1.1 i1 status
 
* 1.1 i1 status
* Change analyzer status
+
* Change analyzer update
 +
** Brad checked the code in prior to the Holidays!
 
* Rules status
 
* Rules status
* Rtx
+
** Update on TPTP tests
** http://wiki.eclipse.org/COSMOS_Architecture_Meetings
+
* Profile module implementation plans
 
+
 
+
== Agenda (12/9/08) ==
+
* 1.1 plans
+
** http://wiki.eclipse.org/COSMOS_1.1_Iteration1_Features
+
* Change analyzer status
+
* Rules status
+
* Rtx
+
** http://wiki.eclipse.org/COSMOS_Architecture_Meetings
+
 
+
== Agenda (12/2/08) ==
+
 
+
* 1.1 plans
+
*# Need ERs identified for i1 as well as designs
+
*# i1 ends 1/9/09
+
* Change analyzer status
+
*# Copyrights updated - need someone w/ delete authority to remove the old CA - Jason to find the right person and explore getting delete authority
+
* BTG update
+
*# Rules status - sprint to December update
+
* Change resolver status update
+
* P2 integration update
+
* SDD alignment with the reconciliation taxonomy (RTX)
+
*# For software resources do we need inheritence/hierarchy?
+
*# RM team meets Wed at 9AM as part of architecture call - need participants
+
 
* Around the room
 
* Around the room
  
== Agenda (11/25/08) ==
 
 
* 1.1 schedule overview
 
*# http://www.eclipse.org/projects/timeline/index.php?projectid=technology.cosmos
 
*# Iteration 1 ends 1/9/09
 
*# GA date set at 6/26/09
 
* Change analyzer status
 
*# Copyrights updated - will check in source this week
 
* BTG update
 
*# Rules status
 
* Change resolver status update
 
* P2 integration update
 
* SDD alignment with the reconciliation taxonomy (RTX)
 
*# SDD needs from an information model
 
*# Separate resources from usage?
 
*# Resources defined in a "dictionary" -- the words
 
*# Usage -- the grammar for how to use the words
 
*# Participation in RM group to align efforts
 
 
== Agenda (11/18/08) ==
 
 
* COSMOS 1.0 RELEASED!
 
*# http://www.eclipse.org/cosmos/project_info/cosmos_V1.0_announcement.php
 
* Change analyzer status
 
*# Submission package conditionally approved
 
*# Need to clean-up some copyright notices in generated classes
 
* BTG update
 
* Change resolver status update
 
* P2 integration update
 
* SDD alignment with the reconciliation taxonomy (RTX)
 
*# SDD needs from an information model
 
*# SDD "profile" -- how would we support varying usage patterns?
 
 
== Agenda (11/4/08) ==
 
 
* Change analyzer status - awaiting IP approval
 
*# JAXB declared and approved as a dependency
 
*# Submission package attached and scanned - may seek to check-in under parallel IP process
 
* BTG update
 
* Change resolver status update
 
* P2 integration update
 
  
  
 +
== Working Documents ==
 +
*[[COSMOS_Design_198553]], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553: Provide an implementation of WS Resource Catalog]
 +
*[http://wiki.eclipse.org/COSMOS_SDD_Runtime_Architecture SDD Runtime Architecture 1.0 (updated)]
 +
*[[P2 Install Example]]
 +
*[[SDD Runtime Design Discussion Artifacts]]
 +
*[http://wiki.eclipse.org/Image:Sdd_implementation.zip SDD Implementation Slides]
  
 
== 2009 Minutes of prior meetings ==
 
== 2009 Minutes of prior meetings ==

Latest revision as of 18:54, 5 March 2009

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-888-682-4285
Primary International Dial-in: + 1-973-368-0695 (Requires International prefix first)
SAS Employees: x40000
Conference Code: 3358100246

Contact

Email [Jason Losh]

Agenda (1/27/09)

Agenda (1/13/09)

  • Welcome Joe
  • 1.1 i1 closure
    • Build status
    • Build declared unstable due to a couple of non-ME bugs
  • 1.1 i2 plans
  • BTG status
    • Are we "done done" with the BTG for CL1 - have a potential adopter
  • Profile and profile module discussion
  • Around the room

Agenda (1/6/09)

  • 1.1 i1 status
  • Change analyzer update
    • Brad checked the code in prior to the Holidays!
  • Rules status
    • Update on TPTP tests
  • Profile module implementation plans
  • Around the room


Working Documents

2009 Minutes of prior meetings

2008 Minutes of prior meetings

Back to the top