Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Data Reporting 3-Jan-2008"

(Attendees)
(Action Items)
 
(2 intermediate revisions by the same user not shown)
Line 28: Line 28:
  
 
== Minutes ==
 
== Minutes ==
 +
* Leonard is taking over ER 208595 from Bill
 +
* Leonard is waiting for the datamanagers from John (ER 200275)
 +
* DataManagers should be packaged as separate war files.  A new enhancement should be created to package the data managers assigned to build team
 +
* An enhancement should be created to optimize inner process calls when data managers are deployed in the same jvm.  This is a DC enhancement
  
 
== Action Items ==
 
== Action Items ==
 +
* Design documents should be created  for the ERs
 +
* 214145 Generic CMDBf Graph Response View - should create a details view

Latest revision as of 13:17, 3 January 2008

COSMOS Main Page >

Minutes for Data Reporting sub-project call.

Logistics

  • Date: 3-Jan-2008
  • Time: 10am EST

Attendees

  • Sheldon Lee-Loy
  • Leonard Richardson
  • William Muldoon
  • Mark Weitzel

Agenda

Minutes

  • Leonard is taking over ER 208595 from Bill
  • Leonard is waiting for the datamanagers from John (ER 200275)
  • DataManagers should be packaged as separate war files. A new enhancement should be created to package the data managers assigned to build team
  • An enhancement should be created to optimize inner process calls when data managers are deployed in the same jvm. This is a DC enhancement

Action Items

  • Design documents should be created for the ERs
  • 214145 Generic CMDBf Graph Response View - should create a details view

Back to the top