Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOSMonthlySummit-i8-i9Transition"

(Agenda)
 
Line 30: Line 30:
  
  
 +
== Agenda ==
 +
* Review status of code in CVS (ensure the i8 stream is tagged and i9 is open)
 +
* Close and veryify i8 enhancements & bugs
 +
* Review priority of [http://wiki.eclipse.org/Cosmos1.0Features#COSMOS_1.0_Features i9 Enhancements] & [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Cosmos&target_milestone=1.0i9&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= Bugs] (45 min.)
 +
* Review i9 high level designs (90 min.)
 +
* BREAK (15 min.)
 +
* Assign i9 enhancements & bugs (45 min.)
 +
* BREAK (15 min.)
 +
* Continue review of QA Acceptance Criteria (60 min.)
 +
[http://wiki.eclipse.org/COSMOS_QA_Criteria COSMOS_QA_Criteria ]
 +
 +
----
  
 
i9 P1 bugs/enhancements
 
i9 P1 bugs/enhancements

Latest revision as of 09:54, 28 January 2008

Logistics

Meeting Title: COSMOS Community i8/i9 Transition Summit
Date & Time: Monday, January 28, 2008

8:30 am EST - 1:00 pm EST

Toll-free Dial-in number: +1 (877) 421.0528
Primary International Dial-in: 770-615-1258
T/L Dial-in: 421-0528
Passcode: 881103#
e-Meeting:
Minutes Meeting minutes are on the Talk Page


Agenda

  • Review status of code in CVS (ensure the i8 stream is tagged and i9 is open)
  • Close and veryify i8 enhancements & bugs
  • Review priority of i9 Enhancements & Bugs (45 min.)
  • Review i9 high level designs (90 min.)
  • BREAK (15 min.)
  • Assign i9 enhancements & bugs (45 min.)
  • BREAK (15 min.)
  • Continue review of QA Acceptance Criteria (60 min.)

COSMOS_QA_Criteria


i9 P1 bugs/enhancements https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=&product=Cosmos&target_milestone=1.0i9&long_desc_type=allwordssubstr&long_desc=&priority=P1&order=Importance


Back to the top