Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Axis2 Integration meeting - Dec 7, 2006"

 
Line 1: Line 1:
 
== Teleconference on Axis2 Integration into WTP - Dec 7, 2006 ==
 
== Teleconference on Axis2 Integration into WTP - Dec 7, 2006 ==
 
=== Attendance ===
 
=== Attendance ===
 
+
'''CANCELLED''' due to lack of a quorum.
  
 
=== Agenda ===
 
=== Agenda ===
Line 14: Line 14:
  
 
* Any question on the documentation for:
 
* Any question on the documentation for:
** [[http://www.eclipse.org/webtools/jst/components/ws/documents/ContributingWebServiceRT.html Contributing Web services runtime]]
+
** [http://www.eclipse.org/webtools/jst/components/ws/documents/ContributingWebServiceRT.html Contributing Web services runtime]
** [[http://www.eclipse.org/webtools/jst/components/ws/documents/ContributingWebServiceRTWithUI.html Contributing Web services runtime with UI]]
+
** [http://www.eclipse.org/webtools/jst/components/ws/documents/ContributingWebServiceRTWithUI.html Contributing Web services runtime with UI]
  
 
* Schedule:  targets for WTP 2.0 M4 (2006.12.22) and M5 (2007.02.23).
 
* Schedule:  targets for WTP 2.0 M4 (2006.12.22) and M5 (2007.02.23).
  
 
* Participation in EclipseCon 2007.
 
* Participation in EclipseCon 2007.

Revision as of 09:38, 7 December 2006

Teleconference on Axis2 Integration into WTP - Dec 7, 2006

Attendance

CANCELLED due to lack of a quorum.

Agenda

  • Discuss additional use cases beside the one covered in Use cases for Axis2 Integration in WTP:
    • Discovery and testing of Axis2 Web services via the WSE.
    • Provision of sample JSPs for Axis2 clients.
    • Provision of an Axis2 JUnit generation test facility.
    • Support for WSDL 2.0.
    • AAR import.
    • Handler configuration.
    • QoS (Quality of Service) functionalities that can be added to enhance a service, such as WS Policy, WS Security and WS Reliable Messaging.
  • Schedule: targets for WTP 2.0 M4 (2006.12.22) and M5 (2007.02.23).
  • Participation in EclipseCon 2007.

Back to the top