Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 12/11/06"

 
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
== Dial in numbers: ==
 
Toll Free: <FONT COLOR="#800517"> '''866-617-3597''' </FONT> 
 
International: <FONT COLOR="#800517"> '''210-795-0625''' </FONT>
 
Passcode: <FONT COLOR="#800517"> '''6121165''' </FONT>
 
  
== Agenda: ==
+
== Attendees: ==
 +
Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Chris King, Christoph Reichert, Marcus Siegmund, Hans Lin, Rodica Ciurea, Simona Constantin, Helen Bergin, Ted Slupesky, Khan Tasinga, Bill Warren, Ophelia Yip, Brenda Haynes, Tom Guinane), Novell (Randy Stokes)
 +
 
 +
== Minutes ==
 
* Project Leader Notes (Ted)
 
* Project Leader Notes (Ted)
** R4 planning
+
** R4 planning (http://dev.eclipse.org/mhonarc/lists/aperi-dev/msg00037.html) Ted sent this out last week
*** Identify owners for each work item
+
*** Any changes in work item list?
* Release Lead Notes (Todd)
+
*** Identify owners for each work item:
** Status on 0.2 build, 3rd party packages:
+
**** SMI-S Fabric & Switch profiles (*) - Christoph
** Todd is working on the auto build, and will have it completed this week.
+
**** Secure Port binding (may be part of above item - Christoph
** The post to the Aperi site will not be automated given our third party Contribution Questionnaire’s (http://www.eclipse.org/aperi/project-info/IP-Log.html) have not yet been approved.
+
**** SMI-S NAS profile - Todd
* Phase 2:
+
**** Unified Storage support (FC, NAS composite view) - Todd
** Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule] - updates made in the schedule.  
+
**** Complete Eclipse RCP GUI "what should come next for the GUI" – Dave
 +
**** Host profile – Khan
 +
**** Remote install & upgrade of host agents – Craig
 +
**** Improved data model for reporting - Prasenjit
 +
*** Owners are to provide initial technical assessments and preliminary sizings  for review at the January 8th meeting.
 +
* Release Engineer Notes (Todd)
 +
** Aperi 0.2 build
 +
*** Currently up and running.  It runs daily at 7pm Pacific time.
 +
*** Todd will continue to make changes to the build and work towards more of a PDE type build environment
 +
** 3rd party packages (http://www.eclipse.org/aperi/project-info/IP-Log.html)
 +
*** no updates from Janet
 +
* Aperi Downloads
 +
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats] 
 +
** Ted to get R2 package ready for downloads page
 +
** alphaWorks (making a binary of SNIA HBA API available)
 +
*** T11 now owns the HBA API standard
 +
*** John & Ted to check into owners names to see if we can get a binary on SourceForge
 +
*** Helen is working to get a binary on the alphaWorks site by 12/14 (their cutoff for this year)
 +
**** The license and checklist has been created.
 +
**** All the necessary legal approvals are in progress.
 +
*** Craig made great progress on script - everything is ready to go
 +
**** The SNIA HBA API binary needs to be downloadable from a http web server
 +
*** Current plan is to post a driver on Wednesday night and then IDVT will download and smoke test to ensure process works
 +
** Experience and feedback
 +
* Project Schedule:
 +
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
 
** Implementation
 
** Implementation
*** Porting initial contribution defects to Bugzilla
+
*** Porting initial contribution defects to Bugzilla:
**** Dave will sort through the defects and send each owner a note today to have them verify the validity of their defects.
+
**** Status on porting all items - target 12/8 – 97% complete
**** If a defect is still valid, the owners will need to move them over to Bugzilla by the end of the week, 12/8
+
*** Porting tracks from 3.x:
*** Porting tracks from 3.x
+
**** Status on estimates for moving tracks over - target 12/8
**** Khan has built a list of tracks
+
***** Ted has received estimates from the GUI, Data Server and Device Server.  Craig to complete estimate today.
**** Ted will send out an email to component owners with the list asking them to see if the tracks apply and provide an estimate of how long they expect it will take to move them over.
+
***** Ted to set timeframe for when this will be completed in R3
 +
*** Device Server Feature Bundles
 +
**** These will be reviewed and discussed at the development meeting tomorrow.
 +
**** A decision will be made to continue and what timeframe (possibly R3)
 
** IDVT  
 
** IDVT  
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
*** Test still on track.  The IDVT team executed 109 testcases with 95 of them successful for the week ending 12/01/06. 
+
*** Defect status
*** The test team also added the following scenarios for our PII IDVT
+
**** Critical defects
**** Performance test for both Derby & DB2 DB
+
***** Remove CIMOM is not working.  Need to get fixed ASAP.  Rodica has a proposal and team needs to agree on it.
**** Fabric Zone Control
+
**** Blocked test cases  
**** Fabric Inband Agent
+
***** 166524 – 12 TC’s blocked.  Simona has a fix.  Ted will ensure the fix gets in
****  Disk Alerts
+
***** 167179 also blocks many TC’sFabric alerts – Marcus to look at.
*** which makes the total testcases now 187.
+
**** The success rate is a little behind the projection
+
*** Several defects on Linux in the area of local installation on a remote server
+
**** Cannot install on Linux at all – the install db script does not work – all Linux tests are currently blocked
+
*** Set up development environments on test machine
+
**** Hans is still having problems running thatKhan indicated with the latest fixes, the test should be able to get running now. Hans will verify. 
+
 
** ID
 
** ID
*** Install instructions for 0.2 review – awaiting Todd’s review
+
*** Install instructions for 0.2 review complete.
*** Chris to put the latest documents out on the wiki  
+
*** Release Notes out for review and input.
*** Development ID work – no issues
+
*** Latest documents out on the wiki:  http://www.eclipse.org/aperi/documentation/releasenotes.php
 +
*** No changes were required for the online help for R2
 +
*** R2 Development ID work – no progress due to other items that came up this week
 +
*** Comments on documentation from team
 
* Action Items
 
* Action Items
 
{| border="1" style="background-color:#EDDDEE;"
 
{| border="1" style="background-color:#EDDDEE;"
Line 52: Line 76:
 
| Questionnaires submitted 9/6.  - Helen has created tables in the [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log] to track the individual IPZilla entries for each Third Party Contribution Questionnaire.  
 
| Questionnaires submitted 9/6.  - Helen has created tables in the [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log] to track the individual IPZilla entries for each Third Party Contribution Questionnaire.  
 
|-
 
|-
| Bug clean up
 
| Dave
 
| 11/28/06
 
| Figure out what to do with the remaining Aperi initial contribution bugs.  Either fix or move to Bugzilla.  Tie into discussion regarding 0.2 migration at next Architecture meeting.  Dave has started this activity ans we are tracking it in the implementation section.  Removing the action item.
 
 
|}
 
|}
 
* Other:
 
* Other:
** Eclipse Summit
 
*** Blog entry summary
 
**** Christoph has completed: http://aperi.blogspot.com/
 
 
** Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
 
** Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
*** December 1<sup>st</sup> - Long Talks and Panel proposals must be in.</li>
 
*** December 30<sup>th</sup> - Long Talks and Panels chosen.</li>
 
 
*** January 15<sup>th</sup> - Short Talks and Demos proposals must be in.</li>
 
*** January 15<sup>th</sup> - Short Talks and Demos proposals must be in.</li>
 
*** January 30<sup>th</sup> - Short Talks and Demos chosen.</li>
 
*** January 30<sup>th</sup> - Short Talks and Demos chosen.</li>
** Khan - Several SNIA Plugfests planned for 2007
+
** SNIA Plugfests planned for 2007
*** Khan to talk to Kevin to find out the intent of each plugfest review with Brenda.
+
*** Khan talked to Kevin to understand the 2007 plugfest intents and reviewed with Brenda and Ted. As there will be nothing new in first quarter, we plan to skip those. 
 +
** Meetings for the rest of 2006:
 +
*** Last meeting of the year will be next week, December 18
 +
*** First meeting in 2006 will be January 8
 +
* Open Forum

Latest revision as of 16:29, 11 December 2006

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Chris King, Christoph Reichert, Marcus Siegmund, Hans Lin, Rodica Ciurea, Simona Constantin, Helen Bergin, Ted Slupesky, Khan Tasinga, Bill Warren, Ophelia Yip, Brenda Haynes, Tom Guinane), Novell (Randy Stokes)

Minutes

  • Project Leader Notes (Ted)
    • R4 planning (http://dev.eclipse.org/mhonarc/lists/aperi-dev/msg00037.html) Ted sent this out last week
      • Any changes in work item list?
      • Identify owners for each work item:
        • SMI-S Fabric & Switch profiles (*) - Christoph
        • Secure Port binding (may be part of above item - Christoph
        • SMI-S NAS profile - Todd
        • Unified Storage support (FC, NAS composite view) - Todd
        • Complete Eclipse RCP GUI "what should come next for the GUI" – Dave
        • Host profile – Khan
        • Remote install & upgrade of host agents – Craig
        • Improved data model for reporting - Prasenjit
      • Owners are to provide initial technical assessments and preliminary sizings for review at the January 8th meeting.
  • Release Engineer Notes (Todd)
    • Aperi 0.2 build
      • Currently up and running. It runs daily at 7pm Pacific time.
      • Todd will continue to make changes to the build and work towards more of a PDE type build environment
    • 3rd party packages (http://www.eclipse.org/aperi/project-info/IP-Log.html)
      • no updates from Janet
  • Aperi Downloads
    • Latest stats
    • Ted to get R2 package ready for downloads page
    • alphaWorks (making a binary of SNIA HBA API available)
      • T11 now owns the HBA API standard
      • John & Ted to check into owners names to see if we can get a binary on SourceForge
      • Helen is working to get a binary on the alphaWorks site by 12/14 (their cutoff for this year)
        • The license and checklist has been created.
        • All the necessary legal approvals are in progress.
      • Craig made great progress on script - everything is ready to go
        • The SNIA HBA API binary needs to be downloadable from a http web server
      • Current plan is to post a driver on Wednesday night and then IDVT will download and smoke test to ensure process works
    • Experience and feedback
  • Project Schedule:
    • Latest Schedule
    • Implementation
      • Porting initial contribution defects to Bugzilla:
        • Status on porting all items - target 12/8 – 97% complete
      • Porting tracks from 3.x:
        • Status on estimates for moving tracks over - target 12/8
          • Ted has received estimates from the GUI, Data Server and Device Server. Craig to complete estimate today.
          • Ted to set timeframe for when this will be completed in R3
      • Device Server Feature Bundles
        • These will be reviewed and discussed at the development meeting tomorrow.
        • A decision will be made to continue and what timeframe (possibly R3)
    • IDVT
      • Test Status
      • Defect status
        • Critical defects
          • Remove CIMOM is not working. Need to get fixed ASAP. Rodica has a proposal and team needs to agree on it.
        • Blocked test cases
          • 166524 – 12 TC’s blocked. Simona has a fix. Ted will ensure the fix gets in
          • 167179 also blocks many TC’s. Fabric alerts – Marcus to look at.
    • ID
      • Install instructions for 0.2 review complete.
      • Release Notes out for review and input.
      • Latest documents out on the wiki: http://www.eclipse.org/aperi/documentation/releasenotes.php
      • No changes were required for the online help for R2
      • R2 Development ID work – no progress due to other items that came up this week
      • Comments on documentation from team
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 11/30/06 Questionnaires submitted 9/6. - Helen has created tables in the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire.
  • Other:
    • Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
      • January 15th - Short Talks and Demos proposals must be in.</li>
      • January 30th - Short Talks and Demos chosen.</li>
    • SNIA Plugfests planned for 2007
      • Khan talked to Kevin to understand the 2007 plugfest intents and reviewed with Brenda and Ted. As there will be nothing new in first quarter, we plan to skip those.
    • Meetings for the rest of 2006:
      • Last meeting of the year will be next week, December 18
      • First meeting in 2006 will be January 8
  • Open Forum

Back to the top