Difference between revisions of "Aperi Development Status Meeting 10/05/06"

 
Line 2: Line 2:
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
== Dial in numbers: ==
+
== Attendees: ==
Toll Free: '''866-617-3597''' 
+
International: '''210-795-0625''' 
+
Passcode: '''6121165'''
+
  
 +
IBM (Helen Bergin, Craig Laverone, Hans Lin, Todd Singleton, Ophelia Yip, Khan Tasinga, Dave Wolfe, Ted Slupesky, Prasenjit Sarkar, Chris King, Marcus Siegmund, Christoph  Reichert, Tom Guinane), Novell (Randy Stokes)
  
== Agenda: ==
+
== Minutes: ==
  
 
* Project Leader Notes (Ted)
 
* Project Leader Notes (Ted)
 +
** None this week
 
* Release Lead Notes (Dave)
 
* Release Lead Notes (Dave)
 +
** None this week
 
* Status on initial contribution items:
 
* Status on initial contribution items:
 
{| border="1" style="background-color:#ABCDEF;"
 
{| border="1" style="background-color:#ABCDEF;"
Line 17: Line 17:
 
! Task !! Duration !! Start !! Finish  
 
! Task !! Duration !! Start !! Finish  
 
|-
 
|-
| Eclipse legal Review || 21 days || Thu 9/7/06 || Thu 10/05/06  
+
| Eclipse legal Review || 27 days || Thu 9/7/06 || Thu 10/19/06  
 
|-
 
|-
| Load code into cvs at Eclipse || 1 day || Fri 10/06/06 || Fri 10/06/06  
+
| Load code into cvs at Eclipse || 1 day || Fri 10/20/06 || Fri 10/20/06  
 
|-
 
|-
  
| Contribution downloadable in Eclipse cvs || 0 days || Fri 10/06/06 || Fri 10/06/06  
+
| Contribution downloadable in Eclipse cvs || 0 days || Fri 10/20/06 || Fri 10/20/06  
 
|-
 
|-
| Build instructions - Eclipse cvs || 5 days || Mon 10/09/06 || Fri 10/13/06  
+
| Build instructions - Eclipse cvs || 5 days || Mon 10/23/06 || Fri 10/27/06  
 
|}
 
|}
 
* Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
 
* Updated [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
 +
** All changes made in schedule. 
 
* Phase 2:
 
* Phase 2:
 
** Design
 
** Design
 +
*** Tom to work with Craig on conflicts and new dates for Agent items
 
** Implementation
 
** Implementation
 +
*** Hans to send new date for Fabric agent unit test item
 +
*** Todd to hold code review on connector on Monday, 10/9
 +
*** Tom to work with Ophelia, and Dave on restructure of GUI tasks
 
** Test
 
** Test
 +
*** Tom to get with Brian on Test Plan status
 
*** Smoke Test  
 
*** Smoke Test  
 +
**** Hans had problems with the nightly builds and was not able to run smoke tests
 +
*** Hans will create CMVC defects for the [http://wiki.eclipse.org/index.php/Image:Aperi_Build_Errors_092706.pdf Build Issues]  so they can be tracked and fixed, until we move to Bugzilla.
 
** ID
 
** ID
 +
*** No updates - working coverage issue
 
** Derby issues
 
** Derby issues
 
* Action Items
 
* Action Items
Line 41: Line 50:
 
| Third Party Dependency Questionnaire  
 
| Third Party Dependency Questionnaire  
 
| Helen  
 
| Helen  
| 09/28/06  
+
| 10/31/06  
 
| Questionnaires submitted 9/6.  - Eclipse has started the review.  Checking with Eclipse for status and a possible target end date.  
 
| Questionnaires submitted 9/6.  - Eclipse has started the review.  Checking with Eclipse for status and a possible target end date.  
 
|-  
 
|-  
| NEW: Performance Issues  
+
| Performance Issues  
 
| Hans
 
| Hans
| 10/5/06
+
| 10/12/06
| Aggregate all performance issues in one wiki page  
+
| Aggregate all performance issues in one wiki page.  Hans was unaware he had this item .  He will now address.
 
|-
 
|-
 
| NEW: Bug clean up
 
| NEW: Bug clean up
Line 57: Line 66:
 
** [http://www.eclipse.org/aperi/events/EclipseSummit-Preparations.html Eclipse Summit Items] Items updated in the document.
 
** [http://www.eclipse.org/aperi/events/EclipseSummit-Preparations.html Eclipse Summit Items] Items updated in the document.
 
** Possible alternative meeting times.
 
** Possible alternative meeting times.
 +
*** Marcus can meet one hour later.  Christoph can also meet one hour later as well as three hours later.
 +
*** For now, we will stick with this meeting time until contribution is available. 
 
** Meeting time conflict on 10/12, 11/9, and 12/7.
 
** Meeting time conflict on 10/12, 11/9, and 12/7.

Latest revision as of 19:29, 5 October 2006

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

IBM (Helen Bergin, Craig Laverone, Hans Lin, Todd Singleton, Ophelia Yip, Khan Tasinga, Dave Wolfe, Ted Slupesky, Prasenjit Sarkar, Chris King, Marcus Siegmund, Christoph Reichert, Tom Guinane), Novell (Randy Stokes)

Minutes:

  • Project Leader Notes (Ted)
    • None this week
  • Release Lead Notes (Dave)
    • None this week
  • Status on initial contribution items:
]-
Task Duration Start Finish
Eclipse legal Review 27 days Thu 9/7/06 Thu 10/19/06
Load code into cvs at Eclipse 1 day Fri 10/20/06 Fri 10/20/06
Contribution downloadable in Eclipse cvs 0 days Fri 10/20/06 Fri 10/20/06
Build instructions - Eclipse cvs 5 days Mon 10/23/06 Fri 10/27/06
  • Updated Schedule
    • All changes made in schedule.
  • Phase 2:
    • Design
      • Tom to work with Craig on conflicts and new dates for Agent items
    • Implementation
      • Hans to send new date for Fabric agent unit test item
      • Todd to hold code review on connector on Monday, 10/9
      • Tom to work with Ophelia, and Dave on restructure of GUI tasks
    • Test
      • Tom to get with Brian on Test Plan status
      • Smoke Test
        • Hans had problems with the nightly builds and was not able to run smoke tests
      • Hans will create CMVC defects for the Build Issues so they can be tracked and fixed, until we move to Bugzilla.
    • ID
      • No updates - working coverage issue
    • Derby issues
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 10/31/06 Questionnaires submitted 9/6. - Eclipse has started the review. Checking with Eclipse for status and a possible target end date.
Performance Issues Hans 10/12/06 Aggregate all performance issues in one wiki page. Hans was unaware he had this item . He will now address.
NEW: Bug clean up Dave 10/13/06 Figure out what to do with the remaining Aperi initial contribution bugs. Either fix or move to Bugzilla.
  • Other:
    • Eclipse Summit Items Items updated in the document.
    • Possible alternative meeting times.
      • Marcus can meet one hour later. Christoph can also meet one hour later as well as three hours later.
      • For now, we will stick with this meeting time until contribution is available.
    • Meeting time conflict on 10/12, 11/9, and 12/7.

Back to the top