Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 04/14/08"

(New page: [http://wiki.eclipse.org/index.php/Aperi_Storage_Management_Project Aperi Wiki Home] [http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings] [http://wiki.eclipse.org/index.php/Ap...)
 
 
Line 9: Line 9:
 
Passcode: <FONT COLOR="red"> '''003399''' </FONT>
 
Passcode: <FONT COLOR="red"> '''003399''' </FONT>
 
</big>  
 
</big>  
<!-- COMMENT
 
 
== Attendees: ==
 
== Attendees: ==
'''Brocade''' (John Crandall), '''IBM''' (Al Heitman, Dave Wolfe, Chris King, Hans Lin, Martine Wedlake, Ramani Routray, Tom Guinane), '''LSI''' (Jenny Monesson)
+
'''IBM''' (Al Heitman, Chris King, Todd Singleton)
 
== Minutes: ==
 
== Minutes: ==
COMMENT -->
 
== Agenda: ==
 
 
* '''Project Leader Notes:'''  
 
* '''Project Leader Notes:'''  
 
** 2008 planning (R0.5)
 
** 2008 planning (R0.5)
 +
*** Finalizing the schedule.
 +
**** Al met with Robert Wipfel from Novell last week.  He indicated that he would provide milestones in the first week of May for the Linux HA Cluster Support.
 +
**** Brocade’s Virtual Fabric / FC security spec.  Al met with John Crandall last week and his outlook is 2H08 for this item.  John is out of the office for the next few weeks.  Al will work with him to get these milestones after he returns.
 +
**** LIC/SSO complete.
 +
**** Java Help – Have the install / build estimates from Todd.  Al has a meeting with Dave and Chris for later this week on the UI code change estimates. 
 +
**** Need to establish tracking milestones for the external dependencies.
 +
**** Aperi 0.5 IDVT – Al and Hans worked on this estimate last week and updated the schedule.
 +
**** SAN Simulator updates are planned.  Support is being added for Derby, multiple database instances, DS 6000 and 8000 currency, and support for CIM control functions for ESS.  Need to cover IDVT for SAN Simulator.  Hans sized this as 1 PM.  Al needs to determine plan for this test cycle.
 
** Aperi Committers:
 
** Aperi Committers:
 +
*** Still waiting on candidate paperwork for John Crandall, Allen Marin and Jenny Monesson.
 
* '''Release Engineer Notes (Todd):'''
 
* '''Release Engineer Notes (Todd):'''
 
** Build status/process
 
** Build status/process
 +
*** Todd ran a build for SAN Simulator.  Still need to get status from Ramani on the SAN Simulator 0.2 release.
 +
*** Development environment on Windows issue - Todd will start investigating this week.
 +
*** Aperi builds need to switch to iText.jar version 1.5.4 - Al set up a meeting for later today to discuss with Todd.
 
* '''Aperi Downloads:'''
 
* '''Aperi Downloads:'''
 
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]   
 
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]   
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 
** [http://live.eclipse.org/node/343 Aperi webinar]   
 +
*** March totals for the month are 221 total, 142 for SRM, and 79 for SAN Simulator.
 +
*** April totals to date are 78 total, 43 for SRM and 35 for SAN Simulator.
 
* '''Development items/issues:'''
 
* '''Development items/issues:'''
 +
** SSO status: Todd was unable to find a client yet.  He is experiencing some issues with the LDAP server and trying to get run-time debugging working. Todd is still on schedule.  Finding a security client is a risk item. 
 
* '''IDVT:'''  
 
* '''IDVT:'''  
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
Line 29: Line 41:
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
*** Aperi Total Open 'Enhancement' Defects - [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=Technology&product=Aperi&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=enhancement&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= by priority & severity]
 
* '''ID:'''  
 
* '''ID:'''  
 +
** Chris plans to have ID plan update complete this week and expects to have something out by next week for review.
 
* '''Project Schedule:'''  
 
* '''Project Schedule:'''  
 
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule].
 
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule].
 +
** Al plans to post an updated schedule later this week.
 
* '''Action Items:'''
 
* '''Action Items:'''
 
{| border="1" style="background-color:#EDDDEE;"
 
{| border="1" style="background-color:#EDDDEE;"
Line 59: Line 73:
 
| Al
 
| Al
 
| 03/31/08
 
| 03/31/08
| Discussed at 3/3/08 meeting.  The website should be updated to make support process clearerNeed to add pointers to aperi-dev registration and instructions to send a note to aperi-dev to get helpAlso, we discussed adding a technical FAQ as a further enhancement in the future.
+
| Al updated the “Getting Started” web page to indicate support process.  Check out the updates here [http://www.eclipse.org/aperi/subscribe.php subscribe]
 +
|-
 +
| iText.jar version
 +
| Al / Todd
 +
| 04/21/08
 +
| Todd will move to iText.jar version 1.5.4Al will submit CQ for this.
 
|}
 
|}
 
* '''Other:'''
 
* '''Other:'''
Line 67: Line 86:
 
*** Deadline for Submission of Proposals - Friday, March 28  
 
*** Deadline for Submission of Proposals - Friday, March 28  
 
*** Martine will discuss with Dave to decide if they can attend/present.  Al will get an update from Martine.  
 
*** Martine will discuss with Dave to decide if they can attend/present.  Al will get an update from Martine.  
** '''Next Meeting''' 04/14/08  
+
** '''Next Meeting''' 04/21/08  
 
* '''Open Forum:'''
 
* '''Open Forum:'''

Latest revision as of 18:31, 14 April 2008

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Dial in numbers:

Toll Free: 877-421-0029 International: 770-615-1246 Passcode: 003399

Attendees:

IBM (Al Heitman, Chris King, Todd Singleton)

Minutes:

  • Project Leader Notes:
    • 2008 planning (R0.5)
      • Finalizing the schedule.
        • Al met with Robert Wipfel from Novell last week. He indicated that he would provide milestones in the first week of May for the Linux HA Cluster Support.
        • Brocade’s Virtual Fabric / FC security spec. Al met with John Crandall last week and his outlook is 2H08 for this item. John is out of the office for the next few weeks. Al will work with him to get these milestones after he returns.
        • LIC/SSO complete.
        • Java Help – Have the install / build estimates from Todd. Al has a meeting with Dave and Chris for later this week on the UI code change estimates.
        • Need to establish tracking milestones for the external dependencies.
        • Aperi 0.5 IDVT – Al and Hans worked on this estimate last week and updated the schedule.
        • SAN Simulator updates are planned. Support is being added for Derby, multiple database instances, DS 6000 and 8000 currency, and support for CIM control functions for ESS. Need to cover IDVT for SAN Simulator. Hans sized this as 1 PM. Al needs to determine plan for this test cycle.
    • Aperi Committers:
      • Still waiting on candidate paperwork for John Crandall, Allen Marin and Jenny Monesson.
  • Release Engineer Notes (Todd):
    • Build status/process
      • Todd ran a build for SAN Simulator. Still need to get status from Ramani on the SAN Simulator 0.2 release.
      • Development environment on Windows issue - Todd will start investigating this week.
      • Aperi builds need to switch to iText.jar version 1.5.4 - Al set up a meeting for later today to discuss with Todd.
  • Aperi Downloads:
    • Latest stats
    • Aperi webinar
      • March totals for the month are 221 total, 142 for SRM, and 79 for SAN Simulator.
      • April totals to date are 78 total, 43 for SRM and 35 for SAN Simulator.
  • Development items/issues:
    • SSO status: Todd was unable to find a client yet. He is experiencing some issues with the LDAP server and trying to get run-time debugging working. Todd is still on schedule. Finding a security client is a risk item.
  • IDVT:
  • ID:
    • Chris plans to have ID plan update complete this week and expects to have something out by next week for review.
  • Project Schedule:
    • Latest Schedule.
    • Al plans to post an updated schedule later this week.
  • Action Items:
Item Owner Target Status
Obtain two mentors Al 03/31/08 Per new development process rules, we need to obtain two project mentors. Harm Sluiman is one. ‘’’Changed ownership to Al. Tom will discuss with Al during PM transfer meetings.’’’
Document Control Al 01/29/08 Write up text for Aperi document control. Tom will work with Al to transfer ownership to Al.
Post the new tutorials out on Eclipse Live. Al 03/11/08 Tom talked to Allen M. about posting on Eclipse Live. Tom will work with Al to transfer ownership of this item.
SNIA Scalefest San Simulator Snapshot. Tom 02/29/08 Tom talked to Mike Walker who talked to SNIA folks, no problem with taking a snapshot, however, the snapshot cannot be publish on Aperi. Ok for use by IBM and any other paying plug-fest member companies. Ramani will do snapshot and working on determining if he has the proper access. There was a suggestion to post the snapshot to SMI LAB web space which is only available by paying member companies.
Update Aperi websites to help clarify support process Al 03/31/08 Al updated the “Getting Started” web page to indicate support process. Check out the updates here subscribe
iText.jar version Al / Todd 04/21/08 Todd will move to iText.jar version 1.5.4. Al will submit CQ for this.
  • Other:
  • Open Forum:

Back to the top