Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

COSMOSF2F04Dec06

Revision as of 12:18, 28 November 2006 by Unnamed Poltroon (Talk)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

COSMOS Face-2-Face

Logistics

Date: 04-December-06 Time: 1:00pm - 5:00pm PST Location: TBD


Ateendees

Mark Weitzel Craig Thomas Roger Castillo (Tentative) Don Ebright (Tentative)


Agenda

  • Given that we have Don (Data Collection) and Craig (Reporting UI) both possibly being avialable, then I suggest we begin to focus on the API b/t the two layers.
  • Establish the first target environment for the reports
  • TDB

Back to the top