Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "TPTP-Test-Automation-20071129"
(→Deliverables) |
|||
Line 31: | Line 31: | ||
*** Documenting the test infrastructure for use in the second testing process document, which will be required by TPTP adopters or extenders. | *** Documenting the test infrastructure for use in the second testing process document, which will be required by TPTP adopters or extenders. | ||
*** Email notifications to component leads for failing test suites. | *** Email notifications to component leads for failing test suites. | ||
− | ** | + | ** Issues: |
# When generating reports, the report has no entries: Paul and Sheldon are investigating. | # When generating reports, the report has no entries: Paul and Sheldon are investigating. | ||
# [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208616 Defect 208616]: Fixed and verified by Kendric/Joel. | # [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208616 Defect 208616]: Fixed and verified by Kendric/Joel. | ||
Line 39: | Line 39: | ||
# [https://bugs.eclipse.org/bugs/show_bug.cgi?id=210292 Defect 210292]: Targeted to i6. | # [https://bugs.eclipse.org/bugs/show_bug.cgi?id=210292 Defect 210292]: Targeted to i6. | ||
# [https://bugs.eclipse.org/bugs/show_bug.cgi?id=210955 Defect 210955]: DTP has resolved the issue, available in the December 1st build. Paul has request a patch. | # [https://bugs.eclipse.org/bugs/show_bug.cgi?id=210955 Defect 210955]: DTP has resolved the issue, available in the December 1st build. Paul has request a patch. | ||
+ | # [https://bugs.eclipse.org/bugs/show_bug.cgi?id=211476 Defect 211476 ]: Paul will fix in i4. | ||
* Metrics: | * Metrics: |
Latest revision as of 16:12, 29 November 2007
Attendees
- Present:
- Paul
- Kiryl
- Joanna
- Jonathan
- Joel
- Alan
Deliverables
- Testing Process:
- Alan integrated the review comments and Paul posted the second draft of the Testing Process (part 1) document for review.
- Allan will integrate review comments for the second draft of the Testing Process (part 1) document by Monday, December 3.
- Alan will add more detailed content to the first draft of the Testing Process (part 2) by Wednesday, November 28.
- Please review the latest drafts for both Testing Process documents for Monday, December 3.
- Alan integrated the review comments and Paul posted the second draft of the Testing Process (part 1) document for review.
- Common Test Infrastructure:
- Completed:
- CVS check-out of all of the test plug-ins in the
/test-results/<project>/*
modules. - Configure and run the Agent Controller on the reference platform.
- Paul created the root-level test suites for BVTs. The test infrastructure will execute the
org.eclipse.hyades.tests/AllBVT<test type>Tests.testsuite
test suites. We do not need to check-in the execution results to CVS due to disk space limitations and polluting of our test pass results. Each developer can rerun the automated tests to reproduce a failure. - Paul created the BVT deployment to the reference platform.
- Automatically generating the Test Report based on the existing test execution results in CVS.
- Paul modified the BIRT tabular test report to walk an execution result to generate a detailed test report from a root-level execution result.
- CVS check-out of all of the test plug-ins in the
- Outstanding:
- Check for Intel build to complete (every x hours) before launching the BVTs.
- Automatically posting the Test Report to
/tptp/test/reports/<release>
. - Cleanup of the reference platform.
- Documenting the test infrastructure for use in the second testing process document, which will be required by TPTP adopters or extenders.
- Email notifications to component leads for failing test suites.
- Issues:
- Completed:
- When generating reports, the report has no entries: Paul and Sheldon are investigating.
- Defect 208616: Fixed and verified by Kendric/Joel.
- Defect 200194: Targeted to i5.
- Defect 190453: Targeted to i6.
- Defect 210289: Targeted to i6.
- Defect 210292: Targeted to i6.
- Defect 210955: DTP has resolved the issue, available in the December 1st build. Paul has request a patch.
- Defect 211476 : Paul will fix in i4.
- Metrics:
- The monitoring project lead has replied to a request to estimate the current testing costs.
- Joanna and Guru are gathering their estimates.
- The monitoring project lead has replied to a request to estimate the current testing costs.
Action Items
- All:
- Review the latest drafts for both Testing Process documents for Monday, December 3.
- Alan:
- Integrate review comments for the second draft of the Testing Process (part 1) document by Monday, December 3.
- Add more detailed content to the first draft of the Testing Process (part 2) by Monday, December 3.
- Joel:
- Outstanding issues for the PoC (integrate the ASF with the TPTP builds to check-out a 'Hello World' TPTP JUnit test suite from CVS, run the test suite on an Eclipse instance running on the target platform, and generate a BIRT report on the test execution using existing sample code).
- Paul:
- Determine labor cost (PW) for a) full test pass and b) smoke test pass from project leads.
- Encourage Project Leads to automate existing manual test suites.
Upcoming Meeting
- We will meet next on Monday, December 3 (9 AM ET).
Upcoming Discussion
- Test framework reuse:
- See defect 171827.
- Existing test frameworks include:
- Test Server for the Agent Controller/Profiler
- Test Server for the JVMTI Profiler.
- Proposed test frameworks include:
- Test Dashboard (see enhancement 112928 and Test Dashboard Plug-in).
- Test automation service (see defect 87285)