Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP project meeting, November 14, 2013"
(Created page with "{{Back To|name=DTP Meetings, 2013 page|href=DTP Meetings, 2013}} ==Attendees== * Linda Chan (Actuate) * Brian Payton (IBM) ==Minutes== * Brian will start updating the enable...") |
|||
Line 9: | Line 9: | ||
* Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12. | * Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12. | ||
* Luna Milestone 3 is this week. We are still contributing our master (1.11.2) stream into Luna. | * Luna Milestone 3 is this week. We are still contributing our master (1.11.2) stream into Luna. | ||
− | * Linda and Brian | + | * Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304. |
Revision as of 20:18, 14 November 2013
← Back to DTP Meetings, 2013 page
Attendees
- Linda Chan (Actuate)
- Brian Payton (IBM)
Minutes
- Brian will start updating the enablement plugins for DB2 shortly. Yeah!
- Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12.
- Luna Milestone 3 is this week. We are still contributing our master (1.11.2) stream into Luna.
- Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.