Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "PTP/meetings/January 2012"
(→Minutes) |
(→Parallel Package Downloaded) |
||
Line 109: | Line 109: | ||
# Next meeting - Feb 14 | # Next meeting - Feb 14 | ||
− | === Parallel Package | + | === Parallel Package Downloads === |
{| border="1" style="text-align:right" | {| border="1" style="text-align:right" | ||
|+ Parallel Package downloads | |+ Parallel Package downloads |
Revision as of 16:55, 31 January 2012
January 2012 Meeting
Date: January 10, 2012 Time: 1:00 PM EDT
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402
Agenda
- Overall project, releases, etc.
- Next builds, releases
- 5.0 Indigo - 5.0.5 outlook - Indigo SR2 RC1+2 is Jan 17; SR2 RC2+2 is Jan 31; GA is Feb 24
- 6.0 Juno - M5+2 is Jan 31
- Status and location of builds now on Hudson (Juno, Indigo, and 4.1)
- Download stats - note here
- Package download counter on eclipse.org/downloads - since SR1 - as of 1/09 it is 27,930; as of 12/12 it was 23,060; 1/10 28,000 during the call
- Update site downloads since SR1: Total 7066 (details: Indigo 5655, ptp-specific 1411)
- Git status
- Reference:
- CDT git tutorial and docs available at PTP/environment_setup/git - including problems of things we can't do with git we could do with CVS
- Developer's environment setup for 6.0 has been mostly updated for git: PTP/environment_setup_60
- Bug to track: https://bugs.eclipse.org/bugs/show_bug.cgi?id=349695.
- Discuss problems/solutions
- Reference:
- Next builds, releases
- Status Reports
- PTP Core/debug
- RDT and remote status
- Synchronized Projects
- Resource Managers - legacy and JAXB (configurable)
- Monitoring - incl. new System Monitoring Perspective
- PLDT
- ETFw, other tool integrations (GEM, PPW, etc.)
- Photran
- Docs, Help, Tutorials
- Other PTP contributions
- PTP User call report
- Previous call was Wed Oct 26 (4th Wednesday) See PTP/PTP_User_Meetings - answering various user questions
- Next meeting - postponed until January 25, 2012
- Education and Outreach
- SC11 BOF/User Group Meeting - Wed Nov 16 (still need to post slides from presenters, have Roland and Wolfgang's; Greg?)
- Status of outreach groups (grants etc.)
- Other Business
- Next meeting - Feb 14
Attendees
- Greg Watson, IBM
- Beth Tibbitts, IBM
- Wyatt Spear, U.Oregon
- Jeff Overbey, NCSA
- Jay Alameda, NCSA
- Claudio Knobloch, Juelich
- Brian Watt, IBM
- John Eblen, ORNL
- Dave Wootton, IBM
- Roland Schultz, ORNL
- Chris Recoskie, IBM
Minutes
UNDER CONSTRUCTION
- Overall project, releases, etc.
- Next builds, releases
- 5.0 Indigo - Indigo SR2 RC1+2 is Jan 17; SR2 RC2+2 is Jan 31; Indigo SR2 GA is Feb 24
- 5.0.5 planned release GA is Feb 7 and will go in SR2
- Includes managed build fixed for Photran that Jeff needs, thus it's prior to SR2 GA
- John is working on merge conflict fixes for Synchronized projects
- 5.0.5 planned release GA is Feb 7 and will go in SR2
- 6.0 Juno - Juno M5+2 is Jan 31
- RDT build errors for Juno (master branch) - Chris will look
- Chris said John Liu is leaving his group, David Salinas is joining
- All PTP builds, after much churn, are now on Hudson server, with Maven and Tycho
- Three builds being run:
- 4.1 - IBM is the only group using this
- Indigo - PTP 5.0.x builds - "ptp-release" is the build name - build must manually be started - aggregation build (ptp+photran) is "ptp-master-release"
- Juno - PTP 6.0 builds - "ptp-nightly" is the build name - gets kicked off on file change - aggregation build (ptp+photran) is "ptp-master-nightly"
- PTP Builds wiki page contains links
- 5.0 Indigo - Indigo SR2 RC1+2 is Jan 17; SR2 RC2+2 is Jan 31; Indigo SR2 GA is Feb 24
- Download stats - see table at bottom of page
- Package download counter on eclipse.org/downloads - since SR1 - as of 1/09 it is 27,930; as of 12/12 it was 23,060; 1/10 28,000 during the call
- Update site downloads since SR1: Total 7066 (details: Indigo 5655, ptp-specific 1411)
- Newly calculated downloads per month - see table to the right
- Git status
- Reference:
- CDT git tutorial and docs available at PTP/environment_setup/git - including problems of things we can't do with git we could do with CVS
- Developer's environment setup for 6.0 has been mostly updated for git: PTP/environment_setup_60
- Bug to track: https://bugs.eclipse.org/bugs/show_bug.cgi?id=349695.
- Discuss problems/solutions
- Three git concepts that Greg said he found useful
- local copy of repository - push and pull syncs with remote copy (pull = fetch + merge)
- commits are just pointers to the changes; merge replays commits on top of your repo. How to resolve conflictts? Add to index then commit
- changes are staged locally - propagation from local > staged > remote
- EGit User Guide - much improved; highly recommended
- Three git concepts that Greg said he found useful
- Reference:
- Next builds, releases
- Status Reports
- Jeff is working on Module support. Next is LML driver for Cray
- Wyatt is working on BG/P support with Kevin Huck
- LML (and PBS) for BG/P (Intrepid @ Illinois, PBS on BG)
- Three Resource Managers on BlueGene now: LL (default), SLURM, LML(new)
- John is working on synchronized projects: File filtering, Merge Resolution, New project wizard (waiting on CDT Bug 363612... Chris plans to commit)
- Claudia: LML DA, Grid Engine, more options for debugging and testing features
- Dave having problems with debug under LML code
- PE JAXB resource manager - Dave will check in by Jan 31 (M5). size warrants review by IBM legal.
- PTP User call report
- Next meeting - January 25, 2012 - SC11 recap and Roadmap for PTP - Greg will present
- SC11 BOF/User Group Meeting - Beth posted slides from SC11 BOF November 16 - User meeting in Seattle - Greg's slides have been added to this as well
- Next meeting - Feb 14
Parallel Package Downloads
Month | Downloads | Total |
---|---|---|
Sept 2011 | 1234 | 5678 |
Oct 2011 | 2345 | 6789 |