Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Equinox/p2/Meetings/20100125"
(New page: = Agenda = * M5 status * M6 planning * discovery system metadata) |
(→Agenda) |
||
Line 2: | Line 2: | ||
* M5 status | * M5 status | ||
+ | ** UI - works with does not necessarily refreshes and the URI entered is not revealed | ||
+ | ** NPE in the publisher | ||
+ | ** Performance problem when droping large amount of bundles | ||
+ | ** Further testing should focus on the command line tools | ||
+ | |||
* M6 planning | * M6 planning | ||
+ | ** A lot of work needs to be done. Pascal will update the plan and send the link. | ||
+ | |||
* discovery system metadata | * discovery system metadata | ||
+ | ** details about the discussion have been captured in http://bugs.eclipse.org/299245 |
Revision as of 22:30, 25 January 2010
Agenda
- M5 status
- UI - works with does not necessarily refreshes and the URI entered is not revealed
- NPE in the publisher
- Performance problem when droping large amount of bundles
- Further testing should focus on the command line tools
- M6 planning
- A lot of work needs to be done. Pascal will update the plan and send the link.
- discovery system metadata
- details about the discussion have been captured in http://bugs.eclipse.org/299245