Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "PTP/meetings/August 2013"
(→Agenda) |
(→Agenda) |
||
Line 11: | Line 11: | ||
** 7.0.3 release | ** 7.0.3 release | ||
** Luna M1 | ** Luna M1 | ||
+ | ** Kepler SR1 | ||
** Downloads (see bottom of page) | ** Downloads (see bottom of page) | ||
Revision as of 13:12, 13 August 2013
August 2013 Meeting
Date: August 13, 2013 Time: 1:00 PM EDT
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402
Agenda
- Overall project, releases, etc.
- 7.0.3 release
- Luna M1
- Kepler SR1
- Downloads (see bottom of page)
- Status Reports
- PTP Core/debug
- RDT, Synchronized Project, Remote
- Target System Configuration support
- Monitoring
- PLDT
- ETFw, other tool configurations
- Docs, Help, N&N
- Clients: WinXP/7, Linux, Mac
- Other tools/contributions
- Tutorials and Outreach
- User/Developer meeting
- SC13 tutorial - not accepted; appealed - no response
- XSEDE tutorial July 22 - on Kepler! In progress
- Next ptp-dev meeting Sep 10
Attendees
Greg Watson, Wyatt Spear, Chris Navarro, Jay Alameda, Jeff Overbey, Beth Tibbitts, John Eblen
Minutes
- 7.0.3 release - planned for Tomorrow (Aug. 14)
- Testing needed, a few bug fixes have been made. Greg made changes to TSC to add extra arg (bug 411843), some bugs related to saving Env. Mgmt.
- Luna M1 is next week M1+3 is next Wed. - our luna contribution is ready but disabled because our dependency CDT is disabled.
- Kepler SR1 RC1 is next week too (also Wed.)
- Assume our 7.0.3 will be our Kepler SR1 contribution
RC1 RC2-4 at weekly intervals
Question: downloads for our package?