Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 12/18/06"

 
Line 2: Line 2:
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi/meetings Aperi Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
 
[http://wiki.eclipse.org/index.php/Aperi_Development_Meetings Aperi Development Meetings]
== Dial in numbers: ==
 
Toll Free: <FONT COLOR="#800517"> '''866-617-3597''' </FONT> 
 
International: <FONT COLOR="#800517"> '''210-795-0625''' </FONT>
 
Passcode: <FONT COLOR="#800517"> '''6121165''' </FONT>
 
  
== Agenda: ==
+
== Attendees: ==
 +
IBM (Craig Laverone, Todd Singleton, Christoph Reichert, Marcus Siegmund, Hans Lin, Rodica Ciurea, Helen Bergin, Ted Slupesky, Ophelia Yip, Brian Delaire, Tom Guinane), LSI (Jenny Monahan)
 +
 
 +
== Minutes: ==
 
* Project Leader Notes (Ted)
 
* Project Leader Notes (Ted)
 +
** None today
 
* Release Engineer Notes (Todd)
 
* Release Engineer Notes (Todd)
** [http://www.eclipse.org/aperi/project-info/IP-Log.html 3rd party packages]
+
** Power problems in Beaverton may have caused the builds to not work over the weekend.  Todd will start another one now.
 +
** [http://www.eclipse.org/aperi/project-info/IP-Log.html 3rd party packages] – no updates
 
* Aperi Downloads
 
* Aperi Downloads
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]   
+
** [http://www.eclipse.org/aperi/downloads/AperiDownloadsChart.pdf Latest stats]
 +
** Stats page not working last week. Tom ran a check today and numbers do not match.  Data may have been lost. 
 +
*** Tom will contact the webmaster
 +
*** Given we are now on release 0.2, the download file has changed. 
 +
**** Rel 0.1 file: /technology/aperi/Aperi_R0.1_Binary.zip
 +
**** Rel 0.2 file: /technology/aperi/Aperi_R0.2_Binary.zip
 
* alphaWorks (making a binary of SNIA HBA API available)
 
* alphaWorks (making a binary of SNIA HBA API available)
 +
** Completed.  Working to get a binary put on Source Forge with the source.
 
* Project Schedule:
 
* Project Schedule:
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule]   
+
** Latest [http://wiki.eclipse.org/index.php/Aperi_Project_Schedule Schedule] Updates made in the file.  
 
** Implementation
 
** Implementation
 
*** Porting initial contribution defects to Bugzilla:
 
*** Porting initial contribution defects to Bugzilla:
**** Status on porting all items - target 12/8
+
**** Completed!
 
*** Porting tracks from 3.x:
 
*** Porting tracks from 3.x:
**** Status on estimates for moving tracks over - target 12/8
+
**** Status on estimates for moving tracks over - completed
***** Ted to set timeframe for when this will be completed in R3
+
***** Schedule updated with initial targets.  Team members to verify with Tom and/or Ted.
*** Device Server Feature Bundles
+
 
** IDVT  
 
** IDVT  
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
*** [http://wiki.eclipse.org/index.php/Aperi/Test/Status Test Status]
 
*** Defect status
 
*** Defect status
 
**** Critical defects
 
**** Critical defects
**** Blocked test cases
+
*****167505 (Craig) Problem is on server.  Looking at Discovery engine.  Also found new defect on Agent.  Still working.
 +
***** 167179 (Christoph) Problem does not exist in TPC.  Working to understand difference.  167966 seems to have the same cause. 
 +
**** Blocked test cases
 +
***** 15 from the above two defects
 +
**** Will review situation with above defects at Architecture meeting on Tuesday, 12/19, then decide how to proceed. 
 
** ID
 
** ID
 
*** [http://www.eclipse.org/aperi/documentation/releasenotes.php Release Notes] out for review and input.
 
*** [http://www.eclipse.org/aperi/documentation/releasenotes.php Release Notes] out for review and input.
 
 
*** R2 Development ID work   
 
*** R2 Development ID work   
 
*** Comments on documentation from team  
 
*** Comments on documentation from team  

Revision as of 18:35, 18 December 2006

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

IBM (Craig Laverone, Todd Singleton, Christoph Reichert, Marcus Siegmund, Hans Lin, Rodica Ciurea, Helen Bergin, Ted Slupesky, Ophelia Yip, Brian Delaire, Tom Guinane), LSI (Jenny Monahan)

Minutes:

  • Project Leader Notes (Ted)
    • None today
  • Release Engineer Notes (Todd)
    • Power problems in Beaverton may have caused the builds to not work over the weekend. Todd will start another one now.
    • 3rd party packages – no updates
  • Aperi Downloads
    • Latest stats
    • Stats page not working last week. Tom ran a check today and numbers do not match. Data may have been lost.
      • Tom will contact the webmaster
      • Given we are now on release 0.2, the download file has changed.
        • Rel 0.1 file: /technology/aperi/Aperi_R0.1_Binary.zip
        • Rel 0.2 file: /technology/aperi/Aperi_R0.2_Binary.zip
  • alphaWorks (making a binary of SNIA HBA API available)
    • Completed. Working to get a binary put on Source Forge with the source.
  • Project Schedule:
    • Latest Schedule Updates made in the file.
    • Implementation
      • Porting initial contribution defects to Bugzilla:
        • Completed!
      • Porting tracks from 3.x:
        • Status on estimates for moving tracks over - completed
          • Schedule updated with initial targets. Team members to verify with Tom and/or Ted.
    • IDVT
      • Test Status
      • Defect status
        • Critical defects
          • 167505 (Craig) Problem is on server. Looking at Discovery engine. Also found new defect on Agent. Still working.
          • 167179 (Christoph) Problem does not exist in TPC. Working to understand difference. 167966 seems to have the same cause.
        • Blocked test cases
          • 15 from the above two defects
        • Will review situation with above defects at Architecture meeting on Tuesday, 12/19, then decide how to proceed.
    • ID
      • Release Notes out for review and input.
      • R2 Development ID work
      • Comments on documentation from team
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 11/30/06 Questionnaires submitted 9/6. - Helen has created tables in the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire.
  • Other:
    • Eclipse Con., Santa Clara, March 5-8 2007, Remaining KEY DATES:
      • January 15th - Short Talks and Demos proposals must be in.</li>
      • January 30th - Short Talks and Demos chosen.</li>
    • Next Meeting will be January 8
  • Open Forum

Back to the top